Document Guide · Chhattisgarh

How to Check NA Order in Chhattisgarh — Complete Guide 2026

NA Order in Chhattisgarh is the Collector's formal approval converting agricultural land to non-agricultural use before construction can begin. Without it, any structure is illegal and subject to demolition. This guide covers the SDM application process, what the order contains, and the risks of buying without one.

Quick Reference
Also calledNon-Agri Conversion Order
Issued byCollector / Sub-Divisional Magistrate (SDM), Chhattisgarh
Valid forPermanent once granted; no renewal required
CostVerify with local authority
Time takenVerify with local authority
Online portalrevenue.cg.gov.in (partial); Collector office for applications CG
noteconfirm with Collector office CG
1

What is NA Order in Chhattisgarh?

Definition

An NA Order (Non-Agricultural Order) is a formal directive from the Collector or SDM that changes the legal land use of an agricultural parcel to non-agricultural under the Chhattisgarh Land Revenue Code, 1959. It is required before any construction activity, residential or otherwise, can legally begin.

Chhattisgarh classifies most rural and peri-urban land as agricultural by default. That classification has a direct consequence for buyers: no structure of any kind can legally go up on agricultural land without prior Collector approval. Growth corridors near Raipur, Naya Raipur, Bhilai, and Korba produce a constant flow of plots marketed as "residential" or "construction-ready." Many of those plots have no NA Order behind the claim. Sellers rely on buyers not asking for the document directly.

The NA conversion process involves applying to the SDM, a site inspection by the revenue team, payment of conversion charges, and issuance of a formal written order. Once issued, the conversion is permanent. There is no expiry date and no renewal cycle. The critical point is sequencing: the order must exist before construction starts, not after. Starting work first and applying for NA later is not a strategy; it is an invitation to a demolition notice and criminal proceedings under the CG Land Revenue Code.

State-specific note: In Chhattisgarh, a plot sold as residential without an NA Order is still legally agricultural land. Buying it for construction creates immediate legal exposure.
2

How to Get NA Order in Chhattisgarh: Step-by-Step

Applications go to the SDM or Collector of the district where the land sits. No fully centralised online NA application exists in CG as of 2026. Keep Khasra number, B1 extract, site plan, and identity proof ready before starting.

Online method (recommended)

1
Check revenue
cg.gov.in Visit revenue.cg.gov.in and look for an NA application facility under your district. Digital availability varies by district.
If the portal shows no facility for your district, skip to the offline route. Do not wait for an online option that may not be rolled out.
2
Download the application form If available, download the NA form for your district
Confirm the form number matches what the portal specifies.
3
Attach digital documents Upload B1 Khasra, site plan, identity proof, and ownership documents
Enter Khasra number, land area, and proposed use exactly as they appear in the revenue records.
4
Track application status Save the reference number
Use it to check status on the portal or during office follow-up.

Offline method (Sub-Registrar Office)

1
Identify the correct office Go to the SDM office covering the sub-division where the land is located
Large parcels or contested cases may be escalated to the Collectorate directly.
2
Submit application with documents Attach B1 Khasra, site plan, land map, identity proof, and ownership documents
Confirm complete document checklist with Collector office CG.
3
Pay the charges
Pay conversion charges
4
Attend inspection and collect the order The revenue team inspects the site
The SDM or Collector then issues the NA Order in writing after the inspection report is filed.
Collect the order on official letterhead with case number, Khasra reference, and the issuing officer's seal. Do not accept a photocopy or an acknowledgment receipt as the final order.
3

What Does NA Order Contain in Chhattisgarh?

The NA Order issued by the Collector or SDM covers these six fields.

Field What it means What to check
Khasra NumberIdentifies the specific parcel convertedMust match the sale deed and B1 Khasra exactly
Land AreaExtent of land approved for conversionCheck this against the area you are purchasing
New Land Use ClassificationResidential / Commercial / IndustrialConfirm it permits your intended construction use
Conversion Charge ReceiptProof that the state fee was paidMissing receipt means conversion may be challenged
Issuing Authority Name and SealCollector or SDM who approved the orderOfficial seal and designation are mandatory
Date of OrderWhen conversion was formally grantedConfirm the order predates any construction on the site
Good sign: The order carries the issuing officer's seal, a case reference number, the correct Khasra details, and an attached or referenced conversion charge receipt.
4

Common Issues With NA Order in Chhattisgarh

Four problems cause the majority of NA Order disputes in CG land transactions.

NA application "in process" presented as equivalent to order
A pending NA application carries no legal weight. The Collector may reject it after you have already purchased the land.
Fix: Do not pay full sale consideration until the NA Order is issued, not applied for.
Wrong land use in the order
An NA Order issued for storage or industrial use does not permit residential construction. Local bodies reject building plans, and the error comes to light only then.
Fix: Read the land use classification in the order before signing anything. Residential use must be explicitly stated.
Forged NA Order
Fake NA Orders with fabricated Collector seals circulate in the Naya Raipur and Bhilai-Charoda corridors. They are difficult to distinguish from genuine documents without cross-referencing.
Fix: Go to the SDM or Collector office and verify the case reference number in their internal records before any payment.
NA Order covers only part of the parcel
Some sellers obtain NA conversion for a portion of a larger holding and market the full parcel as converted. The unconverted portion remains legally agricultural.
Fix: Match the land area stated in the NA Order exactly against the area in the sale deed. Any discrepancy requires a fresh Collector check.
5

Why NA Order Matters for Land Buyers in Chhattisgarh

This single document separates a legal plot from an illegal construction site.

📋
Legal authority to build Construction without an NA Order violates the CG Land Revenue Code, 1959
The Collector can issue a demolition order at any point, regardless of how long the structure has been standing.
Mandatory before construction starts Banks will not release construction loans without the NA Order on record
No NA Order means no bank financing for the build phase, regardless of the buyer's credit history.
🏦
Required for building plan approval Urban local bodies and gram panchayats in Chhattisgarh require the NA Order as a prerequisite for approving building plans
Without that approval, no occupancy certificate can be issued later.
🔍
Chhattisgarh-specific: Growth corridor concentration Plots near Naya Raipur, Bhilai-Charoda, and Korba are routinely sold as construction-ready without valid NA Orders
These corridors account for the highest volume of NA-related buyer complaints in the state.
Red flag: If the seller says NA Order is not required because the plot is small or already in a layout, that is false. Plot size and layout membership do not exempt agricultural land from the conversion requirement in CG.

Browse verified land in Chhattisgarh CTA Paragraph: Listings on 1acre.in pass a preliminary document check before appearing on the platform. Start your search with land that has cleared the first filter. CTA Button: Browse Verified Chhattisgarh Lands

Browse Verified Chhattisgarh Lands

Frequently Asked Questions

What is NA Order Chhattisgarh 2026 and why is it required?
It is the Collector's formal approval converting agricultural land to non-agricultural use under the CG Land Revenue Code, 1959. Without it, any construction on the land is illegal. Authorities can demolish structures built without this order, regardless of when construction took place.
Is NA Order mandatory before construction in Chhattisgarh?
Yes, for every agricultural parcel without exception. Local bodies will not approve building plans and banks will not release construction loans until a valid NA Order is on record. Starting construction before the order is issued creates criminal liability under the CG Land Revenue Code.
How do I apply for NA Order in Chhattisgarh?
Apply at the SDM office of the sub-division where the land is located. Submit B1 Khasra, site plan, identity proof, and ownership documents, then pay the conversion charge after site inspection.
How long does NA Order take in Chhattisgarh?
Processing depends on site inspection findings and whether any objections are raised. Do not schedule construction or final payment before the order is physically in hand.
What is the fee for NA Order in Chhattisgarh?
Conversion charges depend on land area and the intended new use. Residential and commercial conversions attract different rates.
Can I build on agricultural land in CG without NA Order if the plot is small?
No. Size is not an exemption criterion under the CG Land Revenue Code, 1959. Every agricultural parcel in Chhattisgarh requires formal NA conversion before construction. Structures built without the order face demolition regardless of plot area.