How to Check GIDC / BU Permission in Gujarat — Complete Guide 2026

GIDC Gujarat Allotment is the Corporation's leasehold grant of industrial or commercial plots inside notified estates, covered by BU Permission and GIDC NOC. For non-residential use outside GIDC, additional GIDC or local body clearance is needed. This guide walks through how to apply, what to verify, and where buyers go wrong.

Quick Reference
Also calledBU Permission, GIDC NOC, Industrial Plot Allotment
Issued byGujarat Industrial Development Corporation; for non-GIDC plots, the Local Authority (Municipality / Panchayat / Town Planning)
Valid forLease for 99 years, renewable for another 99 years
CostAllotment price varies by estate; 30 to 50 percent down payment, balance in quarterly instalments
Time takenApplication scrutiny and Offer-cum-Allotment usually within a few months for available plots
Online portalgidc.gujarat.gov.in
noteconfirm with GIDC
1

What is GIDC / BU Permission in Gujarat?

Definition

GIDC allotment is the leasehold grant of industrial or commercial plots in notified estates of the Gujarat Industrial Development Corporation. BU (Building Use) Permission is the local authority's clearance to use a constructed building for its sanctioned purpose; for plots outside GIDC, this comes from the Municipality, Panchayat, or relevant Town Planning body.

GIDC land is classified as non-agricultural, so a separate NA/NOC is not required for plots inside its estates. The Corporation states that titles of GIDC land and buildings are free of encumbrances and marketable, which is why most serious industrial setups in Gujarat operate inside its estates. The catch is that you receive the land on lease, not freehold, and your right to use it is tied to actually setting up the unit and following the terms in the Offer-cum-Allotment Letter (OCA).

For non-GIDC plots used for shops, offices, factories, or warehouses, you instead need BU Permission Gujarat from the local authority after the building is complete. This is on top of NA Permission under Section 65, sanctioned plans, and any GIDC NOC if the area is near a notified industrial zone. So the document chain is different inside GIDC versus outside, and a buyer must know which side of the line their plot sits on.

State-specific note: For any non-residential use outside a GIDC estate, additional GIDC or local body clearance is needed. A constructed building cannot be legally used for trade or industry without BU Permission from the relevant authority.
2

How to Get Gidc Bu Permission in Gujarat

Apply for GIDC plots through the Investor Facilitation Portal Gujarat or directly on the GIDC online system. For BU Permission outside GIDC, file with the Municipality, UDA, or Panchayat that has jurisdiction. Keep project report, ID proofs, and land documents ready.

Online method (recommended)

1
Open the GIDC portal Visit [gidc
gujarat.gov.in](http://gidc.gujarat.gov.in) . From the menu, choose Application for Land. The Corporation explicitly states no third party is authorised to allot plots on its behalf.
GIDC publishes advertisements in newspapers and on the website inviting applications. Check current notices for available plots.
2
Submit the online application Fill the online form with applicant details, project details, plot preference, estate name, and required area
Upload the project report, presentation, and ID proofs.
3
Pay the scrutiny fee and post documents Pay the non-refundable scrutiny fee in favour of GIDC
Send the printed application and acknowledgement to the concerned Regional Manager by Registered Post within 30 days, or the application stands cancelled.
4
Receive the Offer-cum-Allotment Letter (OCA) After scrutiny, GIDC issues the OCA online
In normal estates, the applicant pays a 30 to 50 percent down payment within 60 days, the rest in quarterly instalments. In saturated estates, payment is 100 percent within 30 days.
Sign and return the License Agreement with the down payment to convert the OCA into a confirmed allotment.

Offline method (Sub-Registrar Office)

1
Identify the right authority Confirm whether the plot falls under a Municipal Corporation, UDA (AUDA, GUDA, SUDA), or Gram Panchayat
BU Permission is filed with that body.
2
Submit the BU application
Apply for Building Use Permission with the sanctioned building plan, completion drawings, structural and fire NOCs, and proof of NA Permission and other clearances
3
Pay the prescribed fees Pay BU fees and any pending property tax dues at the counter
Collect a numbered receipt.
Many BU files stall on missing fire or environmental NOCs; line them up early.
4
Site inspection and BU certificate
The local authority inspects the building, checks compliance with the sanctioned plan, and issues the BU Permission certificate, which is the legal basis for using the building for its intended purpose
3

What Does the GIDC / BU Permission Document Contain in Gujarat?

A clean GIDC OCA or BU Permission carries the following entries; each must be matched with the project documents and the actual structure on site.

Field What it means What to check
Allotment / BU number and dateUnique reference issued by GIDC or the Local Authority \Match with Sub-Registrar and bank loan files
Allottee / owner namePerson or entity to whom land or BU Permission is granted \Match with PAN, GST, and incorporation documents
Plot or building detailsEstate, plot number, area, or full building address \Cross-check with sanctioned plan and physical site
Permitted useIndustrial, commercial, or specific notified activity \Confirms the allowed line of business
Lease tenure (GIDC)99 years lease, renewable for another 99 years \Verify in the License Agreement signed with GIDC
Conditions imposedTime limit to commence production, FSI 1.0, ground coverage between 20 and 50 percent \Strict compliance avoids penalties and revocation
Fees and duesAllotment price, instalments, or BU fees paid \Demand all challan and instalment receipts
Good sign: A clean GIDC allotment shows the correct allottee, exact plot number and area, permitted use matching the project, OCA accepted in time, instalments paid up to date, and a registered License Agreement.
4

Common Issues With GIDC / BU Permission in Gujarat

A clean GIDC OCA or BU Permission carries the following entries; each must be matched with the project documents and the actual structure on site.

Plot allotted but project not started in time
GIDC fixes a time limit to start commercial production. Non-utilisation attracts yearly penalty rates and possible cancellation.
Fix: Verify that the seller has met production timelines before any resale, or factor pending penalty into the price.
Use mismatch between GIDC and operations
The OCA permits one activity, but the actual use on site is different (commercial in an industrial-only plot, for example).
Fix: Apply for change of use with GIDC, where allowed, before purchase. Some changes (like industrial to commercial) are restricted.
Building used without BU Permission
The structure is built and occupied without BU Permission from the local authority.
Fix: Stop the deal. Buying such property risks penalties, sealing, and demolition orders from the Municipality or UDA.
Forged GIDC NOC or BU certificate
A printout that looks like a GIDC NOC or BU Permission, but the number cannot be traced at GIDC or the Local Authority.
Fix: Cross-check directly with GIDC's Regional Manager or the local authority's BU desk. Any mismatch means fraud.
Sub-letting or transfer without permission
The seller has effectively sub-let or transferred the GIDC plot without GIDC's written approval.
Fix: Demand GIDC's transfer or sub-letting permission. Without it, the new occupant may not be recognised as a valid allottee.
Pending instalments or penalties
The seller has unpaid instalments, frontage charges, or sub-letting fees due to GIDC.
Fix: Get a fresh dues certificate from GIDC and ensure all amounts are cleared before transfer of allotment.
5

Why GIDC / BU Permission Matters for Land Buyers in Gujarat

GIDC Gujarat Allotment and BU Permission together decide whether a commercial or industrial property is legally usable.

📋
Legal authority for non-residential use GIDC allotment grants industrial or commercial use inside its estates; BU Permission grants similar legitimacy for buildings outside
Without these, "running the business" is informal and exposed.
Buyer protection from sealing and penalties A property already covered by valid GIDC papers or BU Permission shifts most regulatory risk away
Without them, the buyer inherits non-utilisation penalties and sealing risk.
🏦
Bank and project loan eligibility Banks accept GIDC allotment letters and License Agreements as collateral basis
For non-GIDC commercial properties, BU Permission plus NA, sanctioned plan, and EC are the bank's minimum stack.
🔍
Gujarat-specific: GIDC's non-agricultural classification GIDC land is classified non-agricultural, so a separate NA NOC is not needed inside its estates
Outside GIDC, you need NA Permission, BU Permission, and any zone-specific clearances. Buyers must understand which side of the line their plot lies on.
Red flag: The seller offers a property running as a factory or shop without producing the OCA, License Agreement, GIDC NOC, or BU Permission, or pushes for registration before pending GIDC dues and BU clearances are settled.
For Land Buyers

Browse 400+ verified lands & plots in Gujarat

Every listing goes through our Preliminary Verification Process.

Frequently Asked Questions

How do I apply for a GIDC plot in Gujarat?
Apply online on [gidc.gujarat.gov.in](http://gidc.gujarat.gov.in) or through the Investor Facilitation Portal, pay the scrutiny fee, post documents to the Regional Manager, and accept the Offer-cum-Allotment Letter.
What is BU Permission in Gujarat?
BU Permission is the local authority's certificate allowing a constructed building to be used for its sanctioned purpose. Without it, occupying or operating the building is treated as illegal.
Is GIDC land non-agricultural?
Yes. GIDC has stated that land in its estates is classified as non-agricultural, removing the need for a separate NA permission or NOC and the standard title verification process.
What is the lease tenure for GIDC plots?
Land in GIDC estates is allotted on leasehold for 99 years and is renewable for another 99 years, subject to compliance with the Corporation's terms and the License Agreement.
Can I transfer a GIDC plot to another buyer?
Transfers and sub-lettings are allowed only with GIDC's written permission and prescribed fees. Any transfer made without this permission may not be recognised by the Corporation.
What is the allotment price for GIDC plots?
Allotment prices vary by estate and category and are published on the GIDC website. They are revised periodically by the Board of Directors and depend on infrastructure level.
What is the FSI in GIDC industrial estates?
GIDC has stated that the permissible FSI in its industrial estates is 1.0, with minimum ground coverage of 20 percent and maximum of 50 percent for plot utilisation.
How do I spot a fake GIDC NOC or BU Permission?
Cross-check the document number with GIDC's Regional Manager or the local authority's BU desk. If the office cannot trace the certificate, treat the document as forged.

Other Related Guides