
Visakhapatnam Masterplan Preview
Try the Visakhapatnam VMRDA Masterplan 2041 on the map
Sign in once and explore the layer for a full day.

Visakhapatnam Masterplan Preview
Try the Visakhapatnam VMRDA Masterplan 2041 on the map
Sign in once with your mobile number and explore the layer for a full day.
The VMRDA Masterplan 2041 zone classification governs every parcel in the Visakhapatnam Metropolitan Region (VMR), spanning Visakhapatnam, Vizianagaram, and Anakapalli districts. This page earlier gave the plan area as 4,380.67 sq km; that is the earlier plan-area figure, not VMRDA's current jurisdiction, which has been 7,328.86 sq km across 49 mandals since 13 mandals were added in March 2021 (The Hans India, 24 March 2021). The area covered by the revised plan has not been published in the reports read for this update. The VMRDA Masterplan 2041 was sanctioned under G.O.Ms.No.136 on 8 November 2021, replacing the earlier VUDA framework and bringing all land development under the Zoning and Development Promotion Regulations (ZDPR) for VMR 2041. The AP government directed a comprehensive revision on 16 January 2025 following public objections. After two rounds of public consultation, the state approved the revised Master Plan 2041 through GO 144, dated 8 July 2026, and it replaces the 2021 plan. Zone classifications on 2021 maps may have changed, so check a plot against the revised plan. This page covers the status of the revised plan, where to see the master plan map, how to search an LP number, the regulatory traps buyers miss, the corridors where zone classification drives investable demand, and how to verify any plot using 1acre's tools before making an offer.
As of October 2026, the revised Visakhapatnam Metropolitan Region Master Plan 2041 is the plan in force. The state approved it through GO 144 dated 8 July 2026, which gives it statutory status under the AP Metropolitan Region and Urban Development Authorities Act, 2016, and replaces the plan sanctioned in 2021.
Step
Date
What happened
Government directs revision
16 January 2025
Revision of the 2021 plan ordered after public objections
First round of objections
2025
3,722 objections and suggestions, grouped into 717 issues; 427 accepted, 290 excluded for technical or legal reasons
Revised draft notified
February to March 2026
Statutory consultation from 9 February to 10 March; 1,241 responses, grouped into 339 cases
Submitted to government
June 2026
VMRDA sent the revised plan to the Municipal Administration and Urban Development Department
Approved
8 July 2026
GO 144
Step
Date
What happened
Government directs revision
16 January 2025
Revision of the 2021 plan ordered after public objections
First round of objections
2025
3,722 objections and suggestions, grouped into 717 issues; 427 accepted, 290 excluded for technical or legal reasons
Revised draft notified
February to March 2026
Statutory consultation from 9 February to 10 March; 1,241 responses, grouped into 339 cases
Submitted to government
June 2026
VMRDA sent the revised plan to the Municipal Administration and Urban Development Department
Approved
8 July 2026
GO 144
The revised plan allocates 40.7% of the region to agriculture, 25% to forests and green zones, 17% to residential use, 9% to mixed use, 6% to transport and 2% to industry. It plans for a population rising from 47.94 lakh in 2025 to 66.30 lakh in 2041 and a road network of 4,098.6 km, with 15 priority links to Bhogapuram airport. It also takes in all VMRDA-approved layouts, 820 LRS layouts, 166 approved building plans and 159 approved change of land use proposals made between 2021 and 2026. A plot's zone under the 2021 plan is therefore not a safe guide: check it against the revised plan.
An LP (layout permission) number is the reference on a final approved layout plan. Layouts approved before September 2018 carry VUDA LP numbers, because VUDA was upgraded to VMRDA that month; VMRDA now holds those records too. To check one:
1. Ask the seller for the final layout plan showing the LP number, its date and the survey numbers of the layout. A Block Layout Plan (BLP) number is not the same thing. 2. Open VMRDA's official website. Since August 2026 it is vmrda.ap.gov.in, and the old vmrda.gov.in redirects there. The site publishes layout information and the master plan reports. 3. Find the layout in VMRDA's approved layout records and match the LP number, village, survey numbers and plot count with the seller's documents. A mismatch on any of these is a reason to stop. 4. Check that the layout is not on VMRDA's unauthorised layouts list. 5. Confirm the plot's zone under the revised Master Plan 2041, which includes all VMRDA-approved layouts and 820 regularised LRS layouts. 6. If the layout does not appear online, ask VMRDA in writing or at its public grievance forum before paying any advance.
What you have
What it means
Next step
Final LP number found in VMRDA records
Approved layout
Check title, encumbrance and zone
BLP only
Tentative sanction
Do not treat it as approval
LRS regularisation
Regularised layout
Confirm the plot is in the regularised plan
No record
Unverified layout
Walk away
What you have
What it means
Next step
Final LP number found in VMRDA records
Approved layout
Check title, encumbrance and zone
BLP only
Tentative sanction
Do not treat it as approval
LRS regularisation
Regularised layout
Confirm the plot is in the regularised plan
No record
Unverified layout
Walk away
You can also view the plot's survey number against the master plan zone on the 1acre map layer.
The VMRDA master plan 2041 map and reports are published by VMRDA on its official website, vmrda.ap.gov.in, which since August 2026 carries the master plan reports alongside layout information. 1acre does not host the plan PDFs. The plan covers the Visakhapatnam Metropolitan Region across Visakhapatnam, Vizianagaram and Anakapalli districts. VMRDA's jurisdiction grew to 7,328.86 sq km in March 2021, when 13 mandals were added, and at that point it covered 17 mandals of Vizianagaram district.
Area
District
What the revised plan and official updates say
How to check on the layer
Bheemili (Bheemunipatnam)
Visakhapatnam
Vizag Bay City planned along the coast from Kailasagiri to Bheemili
Confirm the plot is residential, not a protected coastal or green zone
Madhurawada, Anandapuram, Kapuluppada
Visakhapatnam
IT and data centre hubs
Check the zone and the master plan road widths next to the plot
Pendurthi
Visakhapatnam
Satellite township area in the 2021 plan
Check the zone and the LP number of the layout
Bhogapuram
Vizianagaram
Bhogapuram Aerocity; 15 priority road links to the airport
Check the airport influence zone category
Vizianagaram and Kothavalasa
Vizianagaram
Inside the VMRDA region; Pendurthi-Kothavalasa was a satellite township axis in the 2021 plan
Check the zone in the revised plan, not the 2021 maps
Anakapalle and Atchutapuram
Anakapalli
Industrial and mixed use around the industrial corridor in the 2021 plan
Check the industrial buffer before buying residential land
Area
District
What the revised plan and official updates say
How to check on the layer
Bheemili (Bheemunipatnam)
Visakhapatnam
Vizag Bay City planned along the coast from Kailasagiri to Bheemili
Confirm the plot is residential, not a protected coastal or green zone
Madhurawada, Anandapuram, Kapuluppada
Visakhapatnam
IT and data centre hubs
Check the zone and the master plan road widths next to the plot
Pendurthi
Visakhapatnam
Satellite township area in the 2021 plan
Check the zone and the LP number of the layout
Bhogapuram
Vizianagaram
Bhogapuram Aerocity; 15 priority road links to the airport
Check the airport influence zone category
Vizianagaram and Kothavalasa
Vizianagaram
Inside the VMRDA region; Pendurthi-Kothavalasa was a satellite township axis in the 2021 plan
Check the zone in the revised plan, not the 2021 maps
Anakapalle and Atchutapuram
Anakapalli
Industrial and mixed use around the industrial corridor in the 2021 plan
Check the industrial buffer before buying residential land
Areas within GVMC limits are part of the same Master Plan 2041: the revised plan integrates GVMC layouts, open spaces and the road proposals VMRDA and GVMC prepared together.
The most consequential mistake buyers make in the Visakhapatnam market is treating a Block Layout Plan (BLP) as proof of legal approval. A BLP is a tentative sanction only. The only document that confirms a layout is legally valid under the VMRDA masterplan 2041 zone framework is a final Layout Plan bearing an LP Number authenticated by VMRDA. Thousands of plots across the VMR region have been sold on the basis of BLP documentation, with buyers discovering the deficiency only when applying for registration, utilities, or building permission. Illegal layouts compound this risk further. VMRDA data shows that unapproved layout developers routinely sell over 80 cents of developable land per acre, far exceeding the 60 cents permitted under sanctioned layout rules. These layouts do not conform to ZDPR zoning regulations and are treated as continuing offences by the authority. VMRDA received approximately 4,400 applications under the Layout Regularisation Scheme (LRS) to address this backlog, but plots not covered by LRS remain legally vulnerable. The revised Master Plan 2041, approved in July 2026, takes in 820 LRS layouts and all VMRDA-approved layouts; a layout outside both is not recognised in the plan. The table below sets out the zone codes under VMRDA ZDPR 2041, as used in the 2021 plan, and the key question each raises for a buyer. Confirm the code shown for a plot in the revised plan.
Zone Code
Zone Name
Key Buyer Risk
R
Residential
Check if the LP Number is authenticated; BLP is not a valid title
C
Commercial
Verify zone code matches intended use before any offer
MU
Mixed Use
Permitted mix of uses must match the specific Sub-zone
I
Industrial
Township residential permitted near clusters; check proximity to Visakhapatnam-Chennai Industrial Corridor (VCIC)
A
Agricultural
No residential layout permitted without a formal zone conversion
SA
Special Area
Bhogapuram influence zone; form-based categories override ZDPR defaults
PU
Protected Use
No private development permitted without a specific Authority order
Zone Code
Zone Name
Key Buyer Risk
R
Residential
Check if the LP Number is authenticated; BLP is not a valid title
C
Commercial
Verify zone code matches intended use before any offer
MU
Mixed Use
Permitted mix of uses must match the specific Sub-zone
I
Industrial
Township residential permitted near clusters; check proximity to Visakhapatnam-Chennai Industrial Corridor (VCIC)
A
Agricultural
No residential layout permitted without a formal zone conversion
SA
Special Area
Bhogapuram influence zone; form-based categories override ZDPR defaults
PU
Protected Use
No private development permitted without a specific Authority order
If a seller cannot produce the final LP Number and VMRDA authentication documents, the layout is unverified. Walk away and check the VMRDA Unauthorised Layouts list before proceeding.
The VMRDA Masterplan 2041 maps the entire VMR region around five strategic growth axes, and the zone classification on these axes determines whether land is investable, speculative, or restricted. Satellite townships are designated at Vizianagaram, Bhogapuram Aerocity, Pendurthi-Kothavalasa, Anakapalle-Atchutapuram, Bheemunipatnam, and Nakkapalli. Corridors not on these axes remain in agricultural or protected zone categories with no clear residential conversion pathway under the current plan horizon. The Bhogapuram airport influence zone operates under a separate form-based planning framework within the VMRDA masterplan 2041. It uses five land-use categories (Natural/No Development, Mixed Use-1 through Mixed Use-3, Industrial, and Special Development) rather than the standard ZDPR zone codes. Any land marketed for residential development in this zone must be verified against the specific influence zone map, not the general masterplan sheet. The revised plan approved in July 2026 adds named growth areas: Bhogapuram Aerocity, IT and data centre hubs at Madhurawada, Anandapuram and Kapuluppada, and Vizag Bay City along the coast from Kailasagiri to Bheemili. It also plans 15 priority road links to Bhogapuram airport, and VMRDA said in July 2026 that seven of the master plan roads were nearing completion. The table below shows the corridors with the strongest zone-to-infrastructure alignment as of the 2041 plan sanctioned in 2021.
Corridor
Zone Profile
Infrastructure Driver
Key Risk
Pendurthi
Residential / Satellite Township
Metro link, Radial Corridor 7
Confirm LP Number; active BLP sales reported
Bhogapuram
Special Area (Aerocity influence zone)
Bhogapuram International Airport
Form-based zone categories override standard ZDPR
Anakapalle-Atchutapuram
Industrial / Mixed Use
VCIC mega industrial cluster, SEZ, Naval Base
Residential near an industrial zone; verify buffer distance
Bheemunipatnam
Residential / Satellite Township
Coastal corridor
Confirm zone is residential, not protected coastal
Nakkapalli
Industrial / Township
VCIC node
Township residential is permitted near the cluster only
Corridor
Zone Profile
Infrastructure Driver
Key Risk
Pendurthi
Residential / Satellite Township
Metro link, Radial Corridor 7
Confirm LP Number; active BLP sales reported
Bhogapuram
Special Area (Aerocity influence zone)
Bhogapuram International Airport
Form-based zone categories override standard ZDPR
Anakapalle-Atchutapuram
Industrial / Mixed Use
VCIC mega industrial cluster, SEZ, Naval Base
Residential near an industrial zone; verify buffer distance
Bheemunipatnam
Residential / Satellite Township
Coastal corridor
Confirm zone is residential, not protected coastal
Nakkapalli
Industrial / Township
VCIC node
Township residential is permitted near the cluster only
The VCIC corridor at Atchutapuram is the most misread. Residential plots marketed in this corridor often sit on the boundary of industrial and mixed-use designations. A parcel zoned Industrial under the 2041 plan does not permit a standalone residential layout without a formal conversion order from the Competent Authority.
This page is based on the Andhra Pradesh government's approval of the revised Master Plan 2041 (GO 144, July 2026) and VMRDA statements as reported by established news outlets, read in October 2026. VMRDA's own website could not be read directly for this update, so the menu names in the LP number steps are general; the official documents sit on vmrda.ap.gov.in. Where a fact could not be confirmed from an official or established source, it was left out.
* Deccan Chronicle (14 July 2026): GO 144 dated 8 July, statutory status, objections, land use shares, population, roads, growth areas * The Hans India (14 July 2026): GO 144, revision dates, consultation figures, layouts and plans integrated into the revised plan * The Hans India (13 June 2026): submission of the revised plan to the state government * The Hans India (17 July 2026): master plan roads and links to Bhogapuram airport * The Hans India (16 August 2026): move of the official website to vmrda.ap.gov.in * The Hans India (7 and 18 July 2025): revision process and public suggestions * The Hans India and The News Minute (24 March 2021): 13 mandals added, 7,328.86 sq km, Vizianagaram mandals * The Hans India (7 September 2018): VUDA upgraded to VMRDA

Boundaries and numbers come from published state cadastral records. See all map layers.

See the Amaravati LPS map, APCRDA villages list, capital area and Phase 2 land pooling status, then check any plot's mas...

View Kakinada Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Kakinada masterpla...

TUDA Master Plan 2040 for Tirupati: see the zone map, master plan roads, LP number and LRS checks, then verify your plot...

See the Amaravati LPS map, APCRDA villages list, capital area and Phase 2 land pooling status, then check any plot's mas...

View Kakinada Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Kakinada masterpla...

TUDA Master Plan 2040 for Tirupati: see the zone map, master plan roads, LP number and LRS checks, then verify your plot...
The VMRDA Masterplan 2041 assigns land-use zoning across the Visakhapatnam Metropolitan Region, where VMRDA's jurisdiction has covered 7,328.86 sq km since March 2021 (an earlier plan-area figure on this page was 4,380.67 sq km). First approved in 2021, it was revised and approved again by the state through GO 144 dated 8 July 2026. It is enforced by VMRDA, regulating layouts, construction permissions, and all development activities within its jurisdiction.
A Block Layout Plan (BLP) is only a preliminary approval and not legally valid for construction or registration. Only layouts with a final LP Number issued by VMRDA are fully approved and recognised under planning regulations.
Agricultural land cannot be used for residential purposes without official Change of Land Use (CLU) approval. In industrial zones like Atchutapuram, additional restrictions may apply, making it essential to verify the exact zoning classification before purchasing or planning development.
The LRS allows owners of unapproved layouts to regularise them by paying fees and complying with conditions. However, regularisation does not grant full development rights, and plots outside this process remain legally unauthorised and subject to penalties.
Verify your plot's zone on the official VMRDA masterplan maps on VMRDA's website, now vmrda.ap.gov.in (the old vmrda.gov.in redirects there since August 2026), using your survey number and village. Use the revised plan approved in July 2026, not the 2021 maps. For a faster visual cross-check, overlay your survey number on the 1acre Premium map (1acre.in/subscribe) before proceeding.
No, the Bhogapuram zone follows a separate planning framework with specific influence categories. Standard zoning rules do not apply, so buyers must confirm the exact category to understand permitted land use and development restrictions.
Buying in an unauthorised layout risks registration denial, lack of utility connections, and possible demolition action. If not covered under regularisation schemes, such properties may face ongoing penalties, making prior verification critical before purchase.
Yes. On the 1acre map, you can load the VMRDA Masterplan layer and the Survey Number layer together. This lets you see, at any location, both the masterplan zone and the individual survey numbers overlaid on satellite imagery, so you know exactly which zone your survey number falls in before committing. Both layers are available with a Premium subscription. Subscribe to 1acre Premium.
VMRDA publishes the master plan reports and maps on its official website, vmrda.ap.gov.in, which replaced vmrda.gov.in in August 2026. Use the revised plan approved by GO 144 on 8 July 2026, because zones on the 2021 maps may have changed. 1acre does not host the PDF; you can see the zone against your survey number on the 1acre VMRDA layer.
Yes. The Visakhapatnam Metropolitan Region covers parts of Visakhapatnam, Vizianagaram and Anakapalli districts, and the master plan applies across it. In March 2021, 17 mandals of Vizianagaram district were under VMRDA, including the Bhogapuram airport area. The revised plan names Bhogapuram Aerocity as a growth area. Check a Vizianagaram plot's zone in the revised plan before buying.
Get the final layout plan with the LP number from the seller, then check it against VMRDA's approved layout records on vmrda.ap.gov.in, matching the village, survey numbers and plot count. Layouts approved before September 2018 carry VUDA LP numbers; VMRDA holds those records. Also check the unauthorised layouts list. If you cannot find the layout online, ask VMRDA in writing before paying.
Yes. The Andhra Pradesh government approved the revised Master Plan 2041 through GO 144 dated 8 July 2026. Revision was ordered on 16 January 2025; the revised draft was open for objections from 9 February to 10 March 2026 and drew 1,241 responses, and VMRDA submitted the final plan in June 2026. The revised plan replaces the 2021 plan.
Yes. Both are inside the Visakhapatnam Metropolitan Region. The revised plan plans Vizag Bay City along the coast from Kailasagiri to Bheemili, and the 2021 plan designated Pendurthi-Kothavalasa as a satellite township. In both areas, confirm the plot's zone in the revised plan and the layout's LP number, because coastal, green and agricultural zones do not allow residential layouts.
Source
Official Visakhapatnam Metropolitan Region Development Authority (VMRDA) documents
Official Website
vmrda.gov.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
Polygon / MultiPolygon
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
April 2026
Status
Active
Anything wrong, outdated, or missing we want to hear it.