Loni Masterplan
GDA-2031

Overview
Every plot in Loni gets its development rights from the GIS-based Loni Master Plan 2031 (Draft), prepared by the Ghaziabad Development Authority under the Urban Planning and Development Act, 1973. The plan covers 7,980 hectares across Loni tehsil in Ghaziabad district, dividing the area into three planning zones. The unified Ghaziabad Master Plan 2031 received UP government approval in August 2025, with Loni identified as one of three centres of development alongside Ghaziabad city and Modinagar. Two specific risks define land buying in this corridor: the GDA's published unauthorized colonies list and the Hindon Airbase proximity zone.
Bhopura, Loni Rural, and the Hindon Airbase Corridor: Where Zone and Infrastructure Intersect
Bhopura
Zone Context
Residential / Mixed
Growth Driver
NH-44 access, proposed Pink Line Bhopura station
Known Risk
Hindon Airbase proximity; height NOC required
Loni Rural
Zone Context
Gramin Abadi / Agricultural fringe
Growth Driver
Delhi border proximity
Known Risk
Non-conforming use zones; UPSIDC acquisition entries
Mandola, Agraula
Zone Context
Residential / Agricultural
Growth Driver
GDA planned zone expansion
Known Risk
Agricultural land sold at residential rates without CLU
Tila Shahbazpur, Nistauli
Zone Context
Agricultural / Residential fringe
Growth Driver
Loni tehsil village belt
Known Risk
No GDA-approved layout in many pockets
Bhopura to Hindon corridor
Zone Context
Residential / Mixed
Growth Driver
Proposed Pink Line metro extension
Known Risk
Airbase height restrictions; building NOC mandatory
Corridor / Locality
Zone Context
Growth Driver
Known Risk
Bhopura
Residential / Mixed
NH-44 access, proposed Pink Line Bhopura station
Hindon Airbase proximity; height NOC required
Loni Rural
Gramin Abadi / Agricultural fringe
Delhi border proximity
Non-conforming use zones; UPSIDC acquisition entries
Mandola, Agraula
Residential / Agricultural
GDA planned zone expansion
Agricultural land sold at residential rates without CLU
Tila Shahbazpur, Nistauli
Agricultural / Residential fringe
Loni tehsil village belt
No GDA-approved layout in many pockets
Bhopura to Hindon corridor
Residential / Mixed
Proposed Pink Line metro extension
Airbase height restrictions; building NOC mandatory
The Bhopura corridor is the most misunderstood. Its proximity to both Delhi and the proposed Bhopura Pink Line metro station makes it attractive, but any plot within the flight path or airbase height funnel requires an explicit NOC before construction. Do not proceed on any plot in this corridor without confirming the height restriction status with the GDA office.
Frequently Asked Questions
What is the Loni Masterplan 2031 and who governs it?
The GIS-based Loni Master Plan 2031 (Draft) covers 7,980 hectares under the Ghaziabad Development Authority, constituted under the Urban Planning and Development Act 1973. The unified plan received UP government approval in August 2025, with Loni designated as one of three development centres.
Is the Loni Master Plan 2031 a draft or officially approved?
The GDA board approved the unified Master Plan 2031 draft covering Loni. The UP government gave final approval in August 2025. Loni-specific zonal plans under the three planning zones are still being prepared by consultants engaged by GDA.
How do I check the zone of my plot under the Loni Master Plan 2031?
Download the GIS-based Loni Master Plan 2031 map from gdaghaziabad.in and locate your Khasra number. Cross-check the Khasra entry on UP Bhulekh at upbhulekh.gov.in for current land use. Agricultural plots showing yellow on the zone map cannot be built on without a GDA CLU.
Can I build on agricultural land in Loni without GDA CLU approval?
No. Agricultural land in the Loni Master Plan 2031 requires a Change of Land Use order from GDA before any residential or commercial construction. Any plot priced at residential rates without a confirmed CLU on the GDA portal has no legal development basis.
What is a non-conforming use zone in the Loni Master Plan?
Non-conforming use zones (marked A to R, I to R, C to R on the plan) are areas where existing land use differs from the masterplan designation. These are not regularized uses. GDA can enforce the original designation at any time unless formal regularization has been obtained.
Are there illegal layouts in Loni that buyers should avoid?
Yes. GDA publishes an updated unauthorized colonies list at gdaghaziabad.in, last revised February 2025. Plots in these colonies cannot be registered, bank loans are refused, and building plan sanctions are blocked. Always verify the colony name against this list before paying any advance.
Does the Hindon Airbase affect construction near Loni and Bhopura?
Yes. Hindon Air Force Station is located adjacent to the Loni-Bhopura corridor and imposes height restrictions on construction in its proximity zone. Building plan approvals near Bhopura require a NOC from the Airport Authority of India and IAF. Confirm height clearance status before purchasing any plot in this belt.
What documents must I verify before buying land in Loni?
Verify the Khasra entry on UP Bhulekh for land use and ownership, confirm the colony appears on GDA's approved list and not the unauthorized colonies list, check for UPSIDC acquisition entries on the land record, confirm GDA CLU for any agricultural parcel, and verify building plan approval history.
Disclaimer
Loni Masterplan is only accessible with Premium Subscription.

Data Source & Verification
Source
Official Ghaziabad Development Authority (GDA) – Loni documents
Official Website
gdaghaziabad.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
Polygon / MultiPolygon
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
2026
Status
Active
