Modinagar Masterplan
GDA-2031

Overview
The Modinagar masterplan 2031 land zone plan is a GDA-prepared, GIS-based document covering 6,874.9 hectares across the Modinagar and Muradnagar planning area. The Ghaziabad Development Authority has board-approved the draft, but the UP government's gazette notification is still pending, which means the plan is not yet legally enforceable. It designates residential, commercial, industrial, recreational, and transit-oriented development zones, with TOD zones mapped within 1.5 km of both operational RRTS stations. This layer requires a Premium subscription on 1acre. This page covers zone rules, active demolition risks, and corridors with documented infrastructure backing.
Modinagar South, Modinagar North, and which corridors have real backing from RRTS and NCRTC
Within 1.5 km of Modinagar South RRTS station
Masterplan 2031 Zone
TOD Zone, Mixed Use, FAR 5 (proposed)
Growth Driver
Operational RRTS; NCRTC commercial lease bids invited Dec 2024
Known Risk
FAR 5 not enforceable until UP gazette notification
Within 1.5 km of Modinagar North RRTS station
Masterplan 2031 Zone
TOD Zone, Mixed Use, FAR 5 (proposed)
Growth Driver
Operational RRTS; SRM University proximity at 2.8 km
Known Risk
Same gazette risk; verify colony license status separately
NH-58 / Delhi–Meerut Road corridor
Masterplan 2031 Zone
Residential and Mixed Use
Growth Driver
RRTS alignment follows NH-58; transit-facing frontage
Known Risk
Unauthorized layouts present beyond 1.5 km station zone
Didauli and surrounding village fringe
Masterplan 2031 Zone
Agricultural / Residential fringe
Growth Driver
None documented
Known Risk
Active demolition orders; GDA FIRs filed May 2025
Industrial zone parcels, Modinagar
Masterplan 2031 Zone
Industrial
Growth Driver
Existing industrial base
Known Risk
Full CLU required for residential conversion; not routine
Corridor / Locality
Masterplan 2031 Zone
Growth Driver
Known Risk
Within 1.5 km of Modinagar South RRTS station
TOD Zone, Mixed Use, FAR 5 (proposed)
Operational RRTS; NCRTC commercial lease bids invited Dec 2024
FAR 5 not enforceable until UP gazette notification
Within 1.5 km of Modinagar North RRTS station
TOD Zone, Mixed Use, FAR 5 (proposed)
Operational RRTS; SRM University proximity at 2.8 km
Same gazette risk; verify colony license status separately
NH-58 / Delhi–Meerut Road corridor
Residential and Mixed Use
RRTS alignment follows NH-58; transit-facing frontage
Unauthorized layouts present beyond 1.5 km station zone
Didauli and surrounding village fringe
Agricultural / Residential fringe
None documented
Active demolition orders; GDA FIRs filed May 2025
Industrial zone parcels, Modinagar
Industrial
Existing industrial base
Full CLU required for residential conversion; not routine
The most misread corridor is NH-58 frontage beyond the two station influence zones. Sellers market it as "RRTS corridor land" at TOD pricing. Parcels more than 1.5 km from either station fall outside the designated TOD zone in the masterplan draft. Check the satellite map before accepting any price.
Frequently Asked Questions
What is the Modinagar masterplan 2031 land zone plan?
It is a GDA-prepared, GIS-based land-use plan covering 6,874.9 hectares in Modinagar and Muradnagar. It designates residential, commercial, TOD, industrial, and agricultural zones. The board approved the draft; UP government gazette notification is still pending as of May 2025.
Is the GDA Modinagar masterplan 2031 draft approved or legally enforceable?
GDA board-approved, but not yet legally enforceable. The UP government must issue a gazette notification before the plan takes effect. Until then, the existing Master Plan 2021 governs all development approvals in Modinagar.
How do I check which zone my plot falls in under the GDA masterplan?
Download the GIS-based Modinagar masterplan 2031 draft from gdaghaziabad.in, or use 1acre's Premium map layer to overlay zone classifications on satellite imagery. Agricultural zone classification means a full CLU from GDA is required before any construction.
What is a TOD zone in the GDA masterplan and what FAR does it allow in Modinagar?
A TOD zone covers land within 1.5 km of each RRTS station. The GDA masterplan 2031 draft proposes FAR 5 for mixed residential and commercial use in these zones. That FAR becomes enforceable only after UP issues the gazette notification.
Can I build on agricultural land in Modinagar without a CLU from GDA?
No. Agricultural land in the Modinagar masterplan 2031 requires a Change of Land Use from GDA before any construction. Buying on a broker's promise of future CLU approval carries full regulatory risk with no guaranteed timeline.
How do I verify whether a colony in Modinagar is authorized by GDA?
GDA's unauthorized colony list at gdaghaziabad.in was updated June 2025. Cross-check your colony name and Khasra number against this list. In May 2025, GDA demolished an entire 50-bigha unauthorized layout in Didauli village and filed FIRs.
Which Modinagar areas near RRTS stations have the strongest land investment backing?
The 1.5 km influence zones around Modinagar South and North RRTS stations have both a TOD masterplan designation and active NCRTC commercial leasing at the stations. These are the only Modinagar corridors with operational transit and formal government commercial intent on record.
Disclaimer
Modinagar Masterplan is only accessible with Premium Subscription.

Data Source & Verification
Source
Official Ghaziabad Development Authority (GDA) – Modinagar documents
Official Website
gdaghaziabad.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
Polygon / MultiPolygon
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
2026
Status
Active