Gorakhpur - Siliguri Expressway

NHAI

Expressway
Gorakhpur - Siliguri Expressway map

Overview

The Gorakhpur-Siliguri Expressway is a 525.5-km greenfield corridor under Bharatmala Pariyojana, connecting Gorakhpur in Uttar Pradesh to Siliguri in West Bengal through nine Bihar districts. NHAI (National Highways Authority of India) is the executing authority; LN Malviya Infra Projects prepared the DPR. Gazette notifications for land acquisition are active across all three states. Bihar tenders were floated in September 2025. Full-scale construction is expected to commence 2026 across Bihar packages. Phase 1 (UP to Bihar border) is furthest advanced. Target completion remains 2028. This Premium layer on 1acre maps the alignment as submitted in the DPR. Use it to verify whether a plot sits inside or outside the notified corridor before any transaction.

A route revision in October 2025 incorporated a 72 km stretch through Kishanganj district. Buyers near Kishanganj must verify their khasra number against the revised alignment — not the original DPR — before any transaction.

NHAI Gazette Notifications and the ROW Trap for Gorakhpur Siliguri Expressway Land Purchases

The Right of Way for this expressway is 100 meters. That band is under compulsory acquisition under the National Highways Act, 1956. In Bihar, NHAI has formally gazetted acquisition across four districts as the first wave. In Uttar Pradesh, acquisition began in May 2022 across 111 villages in Gorakhpur, Deoria, and Kushinagar. Any plot inside this corridor is not a purchase; it becomes a government compensation claim at rates assessed by the District Land Acquisition Officer.

The table below shows what the notified NHAI DPR alignment corridor covers across each state:

Uttar Pradesh

Stretch

84.3 km

Districts in ROW

Gorakhpur, Deoria, Kushinagar

ROW Width

60-100 m

Acquisition Status

Active since May 2022

Bihar

Stretch

~417 km

Districts in ROW

W. Champaran, E. Champaran, Sheohar, Sitamarhi, Madhubani, Supaul, Araria, Kishanganj

ROW Width

100 m

Acquisition Status

NHAI Gazette issued

West Bengal

Stretch

~19 km

Districts in ROW

Darjeeling (Siliguri)

ROW Width

100 m

Acquisition Status

Under process

The most consequential problem for buyers is this: NHAI has not published the DPR alignment map online. There is no downloadable, village-level survey map on any official NHAI portal. Brokers selling plots in Sitamarhi, Darbhanga, or Kushinagar as "adjacent to the expressway" cannot confirm whether a specific khasra number falls inside or outside the 100-meter notified band without an official Section 3D notice under the National Highways Act. Approximately 87.5 percent of all land being acquired is agricultural, and once a gazette notification is served on a survey number, that land cannot be legally resold by the original owner. Cross-check the 1acre alignment layer against your plot's coordinates and demand the Section 3D notice before signing any agreement.

Gorakhpur to Siliguri Expressway Corridor: Which Districts Hold Real Land Value and Which Are Speculative

The alignment runs through agricultural territory parallel to the India-Nepal border. The opportunity outside the ROW is real, but the timeline is not confirmed. Construction has not commenced on most Bihar packages as of 2025. Buying farmland in Supaul or Forbesganj based on a 2028 opening is a speculative position; the Kushinagar and Gorakhpur stretches in UP, where acquisition is furthest along, carry the most credible near-term signal.

The following table covers the principal micro-markets along the Gorakhpur Siliguri Expressway route and what each district offers for land buyers:

Gorakhpur (Chaurichaura tehsil)

State

UP

Connectivity Gain

Junction with NH-27 and Purvanchal network

Land Market Signal

Near-term; infrastructure active

Kushinagar (Hata, Tamukhiraj tehsils)

State

UP

Connectivity Gain

Tourism corridor plus expressway intersection

Land Market Signal

Land-use change possible; monitor

Deoria

State

UP

Connectivity Gain

Entry point to Bihar stretch

Land Market Signal

Agricultural base; limited near-term driver

Darbhanga

State

Bihar

Connectivity Gain

Breaks isolation of Mithila belt

Land Market Signal

High speculative interest; no construction yet

Sitamarhi

State

Bihar

Connectivity Gain

Near Nepal border; cross-border trade benefit

Land Market Signal

Early stage; long horizon

Forbesganj, Kishanganj

State

Bihar

Connectivity Gain

Bihar-Bengal junction

Land Market Signal

Undeveloped; high-risk for short-term buyers

Siliguri (Darjeeling district)

State

West Bengal

Connectivity Gain

Existing trade hub; expressway terminus

Land Market Signal

Established market; incremental uplift only

Darbhanga draws the most investor attention in current coverage, and for logical reasons: the Mithila belt has been connectivity-starved for decades. But that same logic has been used to sell speculative farmland there for two years before a single package goes to construction. The Kushinagar and Deoria exits are closer to confirmed activity and connect into the broader UP expressway network, making them the more grounded choice for buyers who need a shorter investment window.

Data Source & Verification

Source

Official National Highways Authority of India (NHAI) documents

Official Website

www.nhai.gov.in

Coordinate Reference System

EPSG:4326 (WGS 84)

Geometry Type

LineString / MultiLineString

Data Format

Vector (GeoJSON) + Raster Tiles

Last Verified

May 2026

Status

Active

Disclaimer: Alignment and corridor information shown here is indicative. Users should verify details with National Highways Authority of India (NHAI) and the relevant state authorities before any transaction or investment decision.

Frequently Asked Questions

Explore Uttar Pradesh on Map

Verified Lands for sale, Layers & Tools on one single map.

Go to Map

Was this layer helpful?

Anything wrong, outdated, or missing — we want to hear it.