logo
Map-View
Buy Land
Sell Land
For Developers
Premium
map-view
Map
Sell
map-view Subscribe
Buy
developer-dashboard
For Developers
© 2026 - 1acre.in - All Rights Reserved
  • LinkedIn icon
  • Youtube icon
  • Instagram icon

© 2026 - 1acre.in - All Rights Reserved

LinkedIn iconYoutube iconInstagram icon
    Layers
    Dholera Air Funnel Zones: Building Height Restrictions
    Ahmedabad Air Funnel Zones: Building Height Restrictions
    Ahmedabad - Gandhinagar Masterplan
    GIFT City Masterplan: GIFT UDA and GUDA Zone Check
    Vadodara VUDA Masterplan 2031: Zone Check and Land Use Guide
    Home
    Gujarat
    Dholera SIR Masterplan: Zone Check and Land Use Guide

    Dholera SIR Masterplan: Zone Check and Land Use Guide

    DSIRDA-2040

    Masterplan
    Dholera SIR Masterplan: Zone Check and Land Use Guide map

    Overview

    Dholera Special Investment Region (SIR) stretches across 920 sq km of Ahmedabad district, but the Dholera DSIRDA Masterplan 2040 only grants development rights inside six sanctioned Town Planning Schemes covering an estimated 422 sq km (TP1 ~51, TP2 ~102, TP5 ~75, TP6 ~67 sq km confirmed; TP3 and TP4 areas not independently verified against primary DSIRDA sources). Everything outside that is agricultural land under general Gujarat law, no matter what the broker's brochure says. DSIRDA, the Dholera Special Investment Region Development Authority, controls zone certificates, layout approvals, and infrastructure commitments. This premium layer maps the full masterplan boundary so you can run a Dholera SIR zone check before a single rupee changes hands.

    Fake "Smart City Plots" Have Cost Buyers Over Rs 2,700 Crore, and the Pattern Is Still Repeating

    The fraud in Dholera does not happen inside the SIR. It happens just outside it, on farmland that looks close enough on a phone screen to feel like the real thing. The Enforcement Directorate raided 24–25 locations across Rajasthan and Gujarat in 2025 in the Nexa Evergreen case, approximately 62,000 buyers had purchased what were marketed as Dholera smart city plots, most of them sitting outside the DSIRDA Masterplan 2040 boundary entirely. Ahmedabad Crime Branch separately booked a father-son duo for forging notary stamps on land documents to falsely claim ownership of Dholera survey numbers.

    The mechanics are consistent: agents drive buyers to visible landmarks, the Tata fab site, the airport access road, the ABCD Building, then sell land 5 to 10 kilometres away outside the SIR. Visual proximity creates a feeling of legitimacy. The masterplan map kills it.

    Run this checklist against any Dholera plot before going further.

    SIR boundary confirmation

    What You Need

    Survey number listed in one of the 22 notified Dholera SIR villages

    What Happens Without It

    Plot falls under general Gujarat revenue law; no DSIRDA infrastructure obligation

    DSIRDA TP scheme zone certificate

    What You Need

    Written certificate naming TP1 through TP6 for that survey number

    What Happens Without It

    No approved TP scheme means no legal construction pathway

    Non-Agricultural (NA) conversion order

    What You Need

    Collector-issued Non-Agricultural order for that specific survey number

    What Happens Without It

    Agricultural land cannot be built upon, period

    7/12 Extract post-registration

    What You Need

    AnyROR (anyror.gujarat.gov.in) entry with buyer's name after sale

    What Happens Without It

    Possession letters carry zero legal weight

    GujRERA project number

    What You Need

    Live listing on gujrera.gujarat.gov.in

    What Happens Without It

    Projects requiring RERA registration that lack it are operating illegally

    CRZ and Green Zone clearance

    What You Need

    DSIRDA confirmation plot is outside Coastal Regulation Zone and Agriculture buffer

    What Happens Without It

    CRZ and Green Zone plots cannot be developed regardless of location within SIR

    Check

    What You Need

    What Happens Without It

    SIR boundary confirmation

    Survey number listed in one of the 22 notified Dholera SIR villages

    Plot falls under general Gujarat revenue law; no DSIRDA infrastructure obligation

    DSIRDA TP scheme zone certificate

    Written certificate naming TP1 through TP6 for that survey number

    No approved TP scheme means no legal construction pathway

    Non-Agricultural (NA) conversion order

    Collector-issued Non-Agricultural order for that specific survey number

    Agricultural land cannot be built upon, period

    7/12 Extract post-registration

    AnyROR (anyror.gujarat.gov.in) entry with buyer's name after sale

    Possession letters carry zero legal weight

    GujRERA project number

    Live listing on gujrera.gujarat.gov.in

    Projects requiring RERA registration that lack it are operating illegally

    CRZ and Green Zone clearance

    DSIRDA confirmation plot is outside Coastal Regulation Zone and Agriculture buffer

    CRZ and Green Zone plots cannot be developed regardless of location within SIR

    If a broker cannot produce a written DSIRDA zone certificate tied to the survey number on the 7/12 Extract (Record of Rights), the conversation ends there.

    TP2 Activation Area Has Running Infrastructure. TP6 Does Not. Price Them Accordingly.

    Dholera DSIRDA town planning scheme approval is not uniform across all six zones. TP2 and its Activation Area sub-zone are where roads, water supply, information and communications technology (ICT) ducting, and power lines are fully built and live. That is a factual distinction from every other TP zone, where infrastructure is still years from completion.

    TP1

    Designated Use

    Residential, mixed use

    Infrastructure Reality

    Near-complete alongside TP2

    Near-Term Catalyst

    Proximity to Activation Area

    Honest Risk

    Supply spike likely post-2026

    TP2 Activation Area

    Designated Use

    Residential, industrial

    Infrastructure Reality

    Complete: roads, water, ICT, power all live

    Near-Term Catalyst

    Tata semiconductor fab, ABCD Building operational

    Honest Risk

    Highest entry price in Dholera

    TP3–TP4

    Designated Use

    Industrial, warehousing

    Infrastructure Reality

    Developing along High Access Corridor

    Near-Term Catalyst

    Expressway alignment, NH 751 logistics

    Honest Risk

    Residential demand 5+ years away

    TP5

    Designated Use

    IT park, knowledge zone

    Infrastructure Reality

    Early-stage

    Near-Term Catalyst

    Tech cluster proposals, international delegations

    Honest Risk

    No confirmed anchor tenant

    TP6

    Designated Use

    Long-term mixed development

    Infrastructure Reality

    Largely undeveloped

    Near-Term Catalyst

    Full build-out of SIR

    Honest Risk

    10–15 year horizon, near-zero liquidity today

    TP Zone

    Designated Use

    Infrastructure Reality

    Near-Term Catalyst

    Honest Risk

    TP1

    Residential, mixed use

    Near-complete alongside TP2

    Proximity to Activation Area

    Supply spike likely post-2026

    TP2 Activation Area

    Residential, industrial

    Complete: roads, water, ICT, power all live

    Tata semiconductor fab, ABCD Building operational

    Highest entry price in Dholera

    TP3–TP4

    Industrial, warehousing

    Developing along High Access Corridor

    Expressway alignment, NH 751 logistics

    Residential demand 5+ years away

    TP5

    IT park, knowledge zone

    Early-stage

    Tech cluster proposals, international delegations

    No confirmed anchor tenant

    TP6

    Long-term mixed development

    Largely undeveloped

    Full build-out of SIR

    10–15 year horizon, near-zero liquidity today

    Three infrastructure moves have shifted the Dholera semiconductor plant land value calculation. The Ahmedabad–Dholera Expressway, 109 km, was inaugurated by Prime Minister Narendra Modi on 31 March 2026. Tata Electronics' ₹91,000 crore chip fabrication plant received Cabinet approval in February 2024, with trial production targeted for 2027 (claims of pilot production by late 2026 should be treated as optimistic projections rather than confirmed milestones). Dholera International Airport Phase 1 construction was completed in December 2025. The airport entered licensing and operational trial stages in early 2026, with full passenger operations expected by late 2026 — though this date has not been officially confirmed by AAI.

    Frequently Asked Questions

    What is the Dholera DSIRDA Masterplan 2040 and how does it affect land buying?

    It's the master planning document for all 920 sq km of Dholera SIR. It defines your plot's zone, permitted use, and what infrastructure DSIRDA must deliver. Without checking it first, no investment decision here makes sense.

    How do I run a Dholera SIR zone check on a specific plot?

    Match the survey number against the 22 notified SIR villages on AnyROR Gujarat (anyror.gujarat.gov.in), then get a written zone certificate from DSIRDA. A broker's printed map doesn't count, only the official certificate does. For a visual cross-check, run your survey number against the DSIRDA zone layer on the 1acre Premium map (1acre.in/subscribe).

    Which TP scheme suits residential plots in Dholera today?

    TP1 and TP2 are your best bets, both allow residential and mixed use, and sit right next to the live Activation Area where utilities are already running. Always confirm permitted use via your DSIRDA zone certificate.

    Is buying land outside the Dholera SIR boundary ever a reasonable bet?

    No. Land outside the SIR has zero DSIRDA infrastructure rights, no TP scheme protection, and no smart city benefits. It's exactly the category behind the ₹2,700 crore Nexa Evergreen fraud. Cheap price never compensates for that.

    What documents must I have before finalising any Dholera land deal?

    You need a DSIRDA zone certificate, NA conversion order from the Collector, 7/12 Extract with clear title, a 15–30 year Encumbrance Certificate, and a GujRERA number where applicable. Any seller refusing the zone certificate upfront is a red flag.

    Can agricultural land near Dholera be legally used for construction?

    Not without a Collector-issued NA conversion order for that exact survey number. Green Zone and Agriculture Zone plots inside the SIR face similar restrictions. Vague promises of "future conversion" are the second most common fraud pattern in Dholera.

    What's the practical difference between the Activation Area and other TP zones?

    The Activation Area is approximately 22.5 sq km (around 5,600 acres) within TP2, where roads, water, power, and ICT infrastructure are fully operational. No other TP zone has reached this stage. Your 7/12 Extract and written DSIRDA zone certificate will confirm if a specific plot falls within it.

    Are Dholera plots covered by RERA, and does the registration number actually matter?

    Not all raw land sales require RERA registration, but where it's mandatory and missing, the seller is operating illegally. Always verify directly on gujrera.gujarat.gov.in. An agent taking bookings with a RERA number "in process" is warning you with their own words.

    Disclaimer

    Zoning and boundary information shown here is indicative. Users should verify details with Dholera Special Investment Region Development Authority (DSIRDA) or relevant local planning authorities before any transaction or development decision.

    Dholera SIR Masterplan: Zone Check and Land Use Guide is only accessible with Premium Subscription.

    Free layer preview
    Check 1acre Premium

    Data Source & Verification

    Source

    Official Dholera Special Investment Region Development Authority (DSIRDA) documents

    Official Website

    dholera.gujarat.gov.in

    Coordinate Reference System

    EPSG:4326 (WGS 84)

    Geometry Type

    Polygon / MultiPolygon

    Data Format

    Raster Tiles (from GeoTIFF)

    Last Verified

    April 2026

    Status

    Active

    Table of Contents