Banur Masterplan
GMADA-2031

Overview
The Banur LPA Master Plan 2031 governs land use across 10,380.2 ha in the south-western corner of the Greater Mohali Region (GMR), Punjab, administered by GMADA. Prepared by JURONG Consultants for the Department of Town and Country Planning, Punjab, it designates Banur as the GMR's primary institutional hub, with residential use as the dominant land allocation (18.1% of total area), followed by mixed use and institutional zones (8%). Two roads, NH 64 and MDR A, anchor the LPA's spatial structure. This page covers the premium Banur Masterplan layer on 1acre, what each zone permits, the regulatory traps buyers encounter, and the corridors where this plan directly drives land value.
Unauthorized Colony Risk and CLU Verification Under the Banur GMADA Plan
Banur's designation as an institutional hub has drawn intense developer activity, and not all of it is legal. GMADA publishes a live PDF list of unauthorized colonies in SAS Nagar district, which includes Banur sub-tehsil. The authority has also issued public notices specifically about colonies in Banur where licensed developers have defaulted on dues, most recently for an affordable colony project at Azizpur and Khizergarh, Sub Tehsil Banur (License No. 63/2024). These notices are a direct signal: even GMADA-licensed colonies can run into financial trouble, and buyers in unlicensed ones have no recourse at all.
Under PAPRA (Punjab Apartment and Property Regulation Act, 1995), every colony developer must obtain a Change of Land Use (CLU) approval from GMADA before applying for a colony license. No CLU means no license. No license means the plot cannot be legally registered for non-agricultural use.
The table below shows primary zone designations from the Banur LPA Master Plan 2031 (DTP SAS Nagar Drawing No. D.T.P (S.A.S) 2031/10, dated 5.2.2010):
Residential
Plan Allocation (% of total LPA area)
18.1%
Residential Construction Permitted?
Yes
CLU Required to Change Use?
No
Mixed Use
Plan Allocation (% of total LPA area)
Second most predominant use
Residential Construction Permitted?
Regulated mix
CLU Required to Change Use?
Depends on existing classification
Institutional
Plan Allocation (% of total LPA area)
8%
Residential Construction Permitted?
No (institutional use only)
CLU Required to Change Use?
Yes
Industrial (pharma/distillery cluster, western zone)
Plan Allocation (% of total LPA area)
2.4%
Residential Construction Permitted?
No
CLU Required to Change Use?
Yes
Open Space and Parks
Plan Allocation (% of total LPA area)
6%
Residential Construction Permitted?
No
CLU Required to Change Use?
Yes
Rural and Agriculture
Plan Allocation (% of total LPA area)
Residual area (~92% of original land)
Residential Construction Permitted?
No
CLU Required to Change Use?
Yes
Zone Type
Plan Allocation (% of total LPA area)
Residential Construction Permitted?
CLU Required to Change Use?
Residential
18.1%
Yes
No
Mixed Use
Second most predominant use
Regulated mix
Depends on existing classification
Institutional
8%
No (institutional use only)
Yes
Industrial (pharma/distillery cluster, western zone)
2.4%
No
Yes
Open Space and Parks
6%
No
Yes
Rural and Agriculture
Residual area (~92% of original land)
No
Yes
Before signing any sale agreement, ask the seller for the CLU drawing number and cross-reference it against the GMADA approved colonies list at gmada.gov.in. A Shajra Plan certified by the Patwari and a non-encumbrance certificate from the Tehsildar are also non-negotiable documents. The CLU processing fee alone starts at Rs. 5,000 for the first acre and Rs. 1,000 for every subsequent acre, which means sellers who claim CLU approval should be able to produce a paid receipt.
Growth Corridors and Micro-Markets Under the Banur Masterplan
The Banur LPA Master Plan 2031 makes a deliberate planning bet: institutional use as the economic engine, residential use as the supporting layer, and industry as a secondary driver in a contained western zone. That hierarchy creates distinct investment profiles across the LPA.
The table below maps the primary corridors to their zone designation and investment context, based entirely on facts sourced from the Banur LPA Master Plan report and GMADA plan map:
NH-64 (Patiala Road) frontage
Zone (Master Plan 2031)
Mixed Use + Residential
Growth Driver
Primary road frontage; direct connectivity to Zirakpur, Chandigarh, Patiala; commercial and residential activity already established
Known Risk
Road widening or PR-1 GMADA Expressway alignment may affect parcels near frontage; verify right-of-way with GMADA
MDR A corridor
Zone (Master Plan 2031)
Mixed Use + Residential
Growth Driver
Second main road spine of the LPA; serves existing built-up municipal area of 104.1 ha
Known Risk
Parcels near the intersection of NH-64 and MDR-A carry mixed-use overlay; check zone designation before assuming pure residential rights
Western industrial belt
Zone (Master Plan 2031)
Industrial (pharma/distillery)
Growth Driver
Existing pharmaceutical and distillery industries; dedicated treatment plant within zone
Known Risk
No residential development permitted; scattered brick kilns near villages; truck terminal encroachment flagged in Master Plan report
Educational cluster (western LPA, NH-64 alignment)
Zone (Master Plan 2031)
Institutional
Growth Driver
Concentration of medical, nursing, and engineering colleges along NH-64; Master Plan allocates 8% of LPA for institutional use
Known Risk
Land around institutional clusters is plan-protected; residential subdivision without CLU is not permitted
Azizpur / Khizergarh (Sub Tehsil Banur)
Zone (Master Plan 2031)
Residential colony zone
Growth Driver
GMADA-licensed affordable colony project; proximity to NH-64 and Zirakpur
Known Risk
GMADA issued a public notice (2024) regarding dues default by the developer; verify current licence status before any transaction
Corridor / Locality
Zone (Master Plan 2031)
Growth Driver
Known Risk
NH-64 (Patiala Road) frontage
Mixed Use + Residential
Primary road frontage; direct connectivity to Zirakpur, Chandigarh, Patiala; commercial and residential activity already established
Road widening or PR-1 GMADA Expressway alignment may affect parcels near frontage; verify right-of-way with GMADA
MDR A corridor
Mixed Use + Residential
Second main road spine of the LPA; serves existing built-up municipal area of 104.1 ha
Parcels near the intersection of NH-64 and MDR-A carry mixed-use overlay; check zone designation before assuming pure residential rights
Western industrial belt
Industrial (pharma/distillery)
Existing pharmaceutical and distillery industries; dedicated treatment plant within zone
No residential development permitted; scattered brick kilns near villages; truck terminal encroachment flagged in Master Plan report
Educational cluster (western LPA, NH-64 alignment)
Institutional
Concentration of medical, nursing, and engineering colleges along NH-64; Master Plan allocates 8% of LPA for institutional use
Land around institutional clusters is plan-protected; residential subdivision without CLU is not permitted
Azizpur / Khizergarh (Sub Tehsil Banur)
Residential colony zone
GMADA-licensed affordable colony project; proximity to NH-64 and Zirakpur
GMADA issued a public notice (2024) regarding dues default by the developer; verify current licence status before any transaction
The most misunderstood corridor is the educational cluster along NH-64. The Banur LPA Master Plan explicitly designates this zone for institutional use; it is not a residential buffer that can be colonised with plotted layouts. Buyers attracted by proximity to Chitkara University, Gian Sagar Medical College, and Plaksha University must verify that their specific khasra number carries residential or mixed-use designation before they assume building rights.
Data Source & Verification
Source
Official Greater Mohali Area Development Authority (GMADA) – Banur documents
Official Website
gmada.gov.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
Polygon / MultiPolygon
Data Format
Raster Tiles (from GeoTIFF)
Last Verified
2026
Status
Active
