Panchkula Extension 2 (Alipur) Masterplan
DGTCP-2021
Overview
The Panchkula Extension 2 masterplan zone covers the Alipur area along NH-73 (Chandigarh-Yamunanagar highway), governed by the Draft Development Plan 2021 prepared by the Town and Country Planning Department (TCP), Haryana. The plan spans 24 proposed sectors, is designed for approximately 2,73,700 residents, and integrates residential, industrial, commercial, and green-belt land uses. This layer on 1acre, available to Premium subscribers, maps the exact zone classification for each survey number in this area, so you can verify land use before you sign anything.
Unauthorised Layouts in Barwala: The Red Flag Buyers Are Missing
The single biggest risk in Panchkula Extension 2 is not pricing, it is buying a plot in an unlicensed colony that has no DTCP approval. In March 2025, the District Town Planner's enforcement team demolished an unauthorised layout spread across six acres in Barwala village, dismantling internal roads and marked plots using a JCB machine. This was not an isolated event; Panchkula police had earlier booked a developer in Sector 32 for advertising plots without a DTCP licence under Section 7 of the Haryana Development and Regulation of Urban Areas Act.
The table below shows what to check before treating any plot as legally safe.
Department of Town and Country Planning (DTCP) Haryana Licence / Change of Land Use (CLU)
What to Verify
Confirms land-use change from agricultural to residential or commercial
Where to Check
tcpharyana.gov.in
Haryana Real Estate Regulatory Authority (HRERA) Registration
What to Verify
Mandatory for any plotted colony project
Where to Check
haryanarera.gov.in
Jamabandi (Fard)
What to Verify
Confirms ownership and whether land is encumbrance-free
Where to Check
jamabandi.nic.in
Draft Development Plan (DDP) 2021 Zone Map
What to Verify
Confirms the plot's designated land-use zone
Where to Check
tcpharyana.gov.in (Panchkula Extension-II folder)
Document
What to Verify
Where to Check
Department of Town and Country Planning (DTCP) Haryana Licence / Change of Land Use (CLU)
Confirms land-use change from agricultural to residential or commercial
tcpharyana.gov.in
Haryana Real Estate Regulatory Authority (HRERA) Registration
Mandatory for any plotted colony project
haryanarera.gov.in
Jamabandi (Fard)
Confirms ownership and whether land is encumbrance-free
jamabandi.nic.in
Draft Development Plan (DDP) 2021 Zone Map
Confirms the plot's designated land-use zone
tcpharyana.gov.in (Panchkula Extension-II folder)
Using agricultural land for residential construction without CLU permission from the Director General, DTCP Haryana, is a criminal offence, no amount of "registry done" or "SBI approved" in a broker's pitch changes that fact. If the seller cannot produce the DTCP licence number and HRERA registration, do not proceed.
NH-73 Corridor: Where the Real Opportunity Is and Where It Is Not
Extension 2 sits at the intersection of two genuinely strong tailwinds: spillover demand from prime Panchkula sectors (where one-kanal plots now fetch ₹14–20 crore) and HSIIDC's 600-acre pollution-free industrial presence in Sectors 10 and 13, which creates sustained employment demand for nearby residential land. Plots across the NH-73 corridor are currently priced between ₹50,000 and ₹1 lakh per square yard, a fraction of established Panchkula sector rates above ₹2 lakh per square yard.
The table below maps the key sub-zones by risk profile.
Sectors 10, 13 (Alipur)
Primary Land Use (Draft Plan 2021)
Industrial (Haryana State Industrial and Infrastructure Development Corporation (HSIIDC))
Growth Driver
Established industry, IT Park
Known Risk
No residential construction permitted
Sectors 12, 14 (Barwala highway)
Primary Land Use (Draft Plan 2021)
Residential
Growth Driver
NH-73 access, Shivalik views, RERA projects active
Known Risk
Unauthorised layouts active in same zone
Barwala village belt
Primary Land Use (Draft Plan 2021)
Agricultural / Transition
Growth Driver
Proximity to model town plan
Known Risk
Highest incidence of unlicensed colonies
Sectors 15, 16
Primary Land Use (Draft Plan 2021)
Emerging residential
Growth Driver
32m sector roads proposed, link road to Mohali planned
Known Risk
Infrastructure timeline uncertain
Sector / Locality
Primary Land Use (Draft Plan 2021)
Growth Driver
Known Risk
Sectors 10, 13 (Alipur)
Industrial (Haryana State Industrial and Infrastructure Development Corporation (HSIIDC))
Established industry, IT Park
No residential construction permitted
Sectors 12, 14 (Barwala highway)
Residential
NH-73 access, Shivalik views, RERA projects active
Unauthorised layouts active in same zone
Barwala village belt
Agricultural / Transition
Proximity to model town plan
Highest incidence of unlicensed colonies
Sectors 15, 16
Emerging residential
32m sector roads proposed, link road to Mohali planned
Infrastructure timeline uncertain
The most misread corridor is Barwala village itself. Brokers sell plots here at Extension 2 prices, but much of this land has not received CLU and sits outside licensed colony boundaries. Check the HRERA portal before any booking, not after.
Data Source & Verification
Source
Official Town and Country Planning Department (DGTCP), Haryana – Panchkula Ext 2 documents
Official Website
tcpharyana.gov.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
Polygon / MultiPolygon
Data Format
Raster Tiles (from GeoTIFF)
Last Verified
April 2026
Status
Active
