The Kota Atal Progressway land buying opportunity sits at the start point of one of India's largest greenfield expressways: a 408.77 km access-controlled corridor (some sources cite 404 km under the original alignment) connecting Seemalya village in Kota district, Rajasthan, to Etawah in Uttar Pradesh, via Madhya Pradesh's Sheopur, Morena and Bhind districts. Developed by NHAI (National Highways Authority of India) under Bharatmala Pariyojana Phase-I at an estimated cost of ₹23,645 crore, the project has an approved DPR and active land acquisition underway. This page maps the expressway's Kota entry point, explains the 90A conversion rules that determine legal buildability and flags the acquisition delays investors must price into their decisions.
The project is being built under the Hybrid Annuity Model (HAM), under which NHAI pays annuities to the concessionaire — distinct from toll-operate-transfer (BOT) or pure engineering-procurement-construction (EPC) contracts. HAM projects are funded partly by NHAI and partly by the concessionaire, which affects construction timelines and financial risk.
In March 2026, NHAI reverted to the original alignment, away from the revised route through 214 villages. Also known as the Chambal Expressway, this corridor is now back on the older alignment, which carries approximately 75% government land — materially lower acquisition risk than the revised alignment. NHAI is re-verifying land in 90 villages in Morena, 48 in Sheopur, and 23 in Bhind. Landowners in these districts on the original alignment will receive double compensation. The acquisition risk profile has shifted materially — verify your khasra number against the current alignment before any transaction.
The Atal Progressway carries one of the most significant acquisition complications of any current NHAI project, and it directly affects land near Kota's Seemalya interchange.
After NHAI applied for environmental clearance in June 2022 and floated construction tenders in December 2022, the National Green Tribunal raised concerns about the original alignment through the Chambal ravines and Kuno National Park. NHAI changed the route. The revised alignment now passes through 214 villages instead of the originally planned 162, and around 90% of the land on the new route is private agricultural land, up from 75% on the old alignment. Tenders for Packages 3-6 were cancelled in January 2024 due to unresolved land acquisition disputes. NHAI has indicated fresh bids are planned, but as of mid-2025, approximately 50% of required land has been acquired across the full corridor.
The table below summarises the current project status across states.
State
Length in Corridor
Right of Way Width
Land Acquisition Status
Rajasthan (Kota entry)
72 km
60 m
Earthwork tenders awarded; full possession pending
Madhya Pradesh
~313 km
100 m
~50% land acquired as of mid-2025
Uttar Pradesh (Etawah end)
~23 km
60 m
Near complete
State
Length in Corridor
Right of Way Width
Land Acquisition Status
Rajasthan (Kota entry)
72 km
60 m
Earthwork tenders awarded; full possession pending
Madhya Pradesh
~313 km
100 m
~50% land acquired as of mid-2025
Uttar Pradesh (Etawah end)
~23 km
60 m
Near complete
If a broker is showing you land priced on the assumption that this expressway is under active construction, ask them to produce the NHAI land possession certificate for that specific khasra number.
Land near the Kota Atal Progressway entry gains value from two stacked infrastructure plays, not one.
The expressway's western terminus sits at Seemalya village, Kota district, where it connects directly to the Delhi-Mumbai Expressway interchange. This dual-interchange node makes the Seemalya-Borkhera belt the most analytically defensible corridor in the Kota market. The Delhi-Mumbai Expressway is already operational through Rajasthan, so that connectivity is not speculative. The Atal Progressway adds a second vector eastward toward Gwalior and the Agra-Lucknow Expressway, positioning Kota as a freight and logistics node for three-state movement.
The table below lists the corridors most directly affected and the investment thesis for each.
Corridor / Locality
Connection
Growth Driver
Key Risk
Seemalya village and surrounds
Atal Progressway start + Delhi-Mumbai Expressway interchange
Dual-expressway node; logistics and warehousing demand
NHAI land acquisition still active; boundary uncertainty
Borkhera
NH-27 access, proximity to Seemalya
Established residential market; expressway adjacency
Land already partly urbanised; Section 90A conversion mandatory for new layouts
Kaithoon, Kota district
Within Rajasthan corridor stretch
Agricultural land with conversion potential
90% private agricultural land in revised alignment; society patta risk high
Kunhari and Baran Road fringe
Secondary corridor feeding NH-27
Education-hub demand spillover from Kota city
Further from interchange; value dependent on Atal Progressway completion
Corridor / Locality
Connection
Growth Driver
Key Risk
Seemalya village and surrounds
Atal Progressway start + Delhi-Mumbai Expressway interchange
Dual-expressway node; logistics and warehousing demand
NHAI land acquisition still active; boundary uncertainty
Borkhera
NH-27 access, proximity to Seemalya
Established residential market; expressway adjacency
Land already partly urbanised; Section 90A conversion mandatory for new layouts
Kaithoon, Kota district
Within Rajasthan corridor stretch
Agricultural land with conversion potential
90% private agricultural land in revised alignment; society patta risk high
Kunhari and Baran Road fringe
Secondary corridor feeding NH-27
Education-hub demand spillover from Kota city
Further from interchange; value dependent on Atal Progressway completion
The most misread corridor is Kaithoon. Brokers position it as corridor-adjacent land at pre-appreciation prices. What they underplay is that the NHAI's revised alignment specifically concentrated in areas with heavy private agricultural land, and Kaithoon sits in exactly that profile. Buying here without a clean Jamabandi and a confirmed 90A conversion order is a way to own land that cannot be registered, built upon or bank-financed.
For Land Owners & Agents
I want to sell my land in Rajasthan
10:32
Plz share your Land's location - We will list it on 1acre map, for Free.
10:32

250 Sq yds
2.5 Acres
For Land Buyers
Every listing goes through our Preliminary Verification Process.

Ajmer masterplan land zone: what every buyer must verify before signing

JDA Master Plan 2025 is valid to 2027: see the Jaipur zone map, U2 HIZ meaning, zone-wise list, official PDFs and 2047 s...

View Jodhpur Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Jodhpur masterplan ...

Ajmer masterplan land zone: what every buyer must verify before signing

JDA Master Plan 2025 is valid to 2027: see the Jaipur zone map, U2 HIZ meaning, zone-wise list, official PDFs and 2047 s...

View Jodhpur Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Jodhpur masterplan ...
Yes. The expressway starts at Seemalya village in Kota district, where it connects with NH-27 and the Delhi-Mumbai Expressway interchange. The 72 km Rajasthan stretch originates here. NHAI's DPR and environmental clearance documents confirm this western terminus.
Active but significantly updated. In March 2026, NHAI reverted to the original alignment — back from the revised route through 214 villages to the older alignment (~75% government land). NHAI is re-verifying land in 90 villages in Morena, 48 in Sheopur, and 23 in Bhind. Landowners on the original route will receive double compensation. Earthwork tenders remain awarded for the Rajasthan (Kota) section. Before any purchase, use 1acre's Premium map layer (https://1acre.in/subscribe) to overlay the current alignment on your khasra number — the alignment reversion means boundary positions have shifted materially.
Yes, but you cannot build on it without a Section 90A conversion order from the Rajasthan revenue authority. Agricultural land near the Bharatmala Pariyojana corridor can be purchased; converting it to residential or commercial use requires a separate formal application and approval under Rajasthan Land Revenue Rules.
At minimum: the Jamabandi (Khatauni), the Khasra map confirming survey number and classification, a current encumbrance certificate, and the Section 90A conversion order if the land is being sold as a residential plot. If no 90A order exists, you are buying agricultural land regardless of what the patta says.
High. Rajasthan has moved to ban registration of society patta plots that lack 90A approval. Banks refuse home loans, building approvals are rejected, and the plot cannot be resold through a sub-registrar. Buyers who paid for plots in unapproved societies face demolition risk and no legal recourse.
Seemalya village is the terminus point. Borkhera is the closest established residential market. Both are within the NH-27 corridor that feeds the interchange. Land prices in Borkhera reflect existing demand; Seemalya-area agricultural parcels carry corridor premium but also active acquisition risk.
Partially. Established residential plots in Borkhera trade on existing demand from Kota's education sector. Agricultural land near Seemalya carries a speculative corridor premium. Given that construction tenders were cancelled in 2024 and 50% of total land acquisition remains pending across the corridor, the appreciation timeline is not the 2-3 years brokers commonly cite.
NHAI's March 2026 reversion to the original alignment further resets the acquisition clock across MP. The appreciation timeline is not the 2-3 years brokers commonly cite.
60 metres in Rajasthan and Uttar Pradesh sections. The Madhya Pradesh section uses a 100-metre ROW. Land within or immediately adjacent to this corridor cannot be built upon and may be subject to acquisition. Always check the Khasra number against the NHAI alignment map before purchase.
Source
Official National Highways Authority of India (NHAI) documents
Official Website
www.nhai.gov.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
LineString / MultiLineString
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
May 2026
Status
Active
Anything wrong, outdated, or missing we want to hear it.