Faridabad Jewar Expressway land acquisition covers a 31 km, six-lane (expandable to eight) access-controlled corridor connecting Sector 65 in Ballabhgarh, Faridabad, to Dayanatpur village near Noida International Airport in Jewar, Uttar Pradesh. Faridabad-Jewar Expressway is a live project on 1acre.
NHAI awarded the tender to Apco Infratech Pvt. Ltd. in July 2022 under the Hybrid Annuity Model at an original cost of Rs 2,414.67 crore, later expanded with an 11 km elevated section. This page covers exactly which villages are affected, the project's slipped timeline, and where growth is concentrating along the route.
NHAI's land acquisition for this corridor covers 18 villages split across two states: 14 in Faridabad and Palwal districts in Haryana, and four in Gautam Budh Nagar, Uttar Pradesh. The affected villages in Haryana include Sahupura, Sotai, Chandawali, Bahbalpur, Fafunda, Panhera Khurd, Mahmudpur, Hirapur, Chhainsa, Mohna, and Mohiyapur in Faridabad, along with Begumpur and Jhumpa in Palwal. In Uttar Pradesh, the affected villages are Vallabhnagar, Dayanatpur, Lena Bangar, Karoli Bangar, and Faleda Bangar.
**Segment**
**Length**
**State**
Faridabad and Palwal districts
Approximately 22-24 km
Haryana
Gautam Budh Nagar district
Approximately 7-9 km
Uttar Pradesh
Elevated corridor addition (2026)
Approximately 11 km
Cost-shared with Haryana government (Rs 450 crore of Rs 689.24 crore)
**Segment**
**Length**
**State**
Faridabad and Palwal districts
Approximately 22-24 km
Haryana
Gautam Budh Nagar district
Approximately 7-9 km
Uttar Pradesh
Elevated corridor addition (2026)
Approximately 11 km
Cost-shared with Haryana government (Rs 450 crore of Rs 689.24 crore)
Buyers should treat the project's timeline with caution given its track record. The original completion target of June 2025 was not met. As of March 2026, only about 1,200 of the required 3,000 piles had been completed, with girder casting for the superstructure just beginning. NHAI's current target is April 2027, though officials indicate some sections may become operational earlier in 2026. The elevated section was added specifically to reduce at-grade land acquisition requirements and allow the expressway to cross local roads and rail lines without disrupting access control, which itself signals how acquisition complexity shaped the project's design. Before assuming any nearby land benefits from a near-term opening, check the current pile-driving and girder progress against NHAI's own published milestones rather than the original 2025 target.
The expressway connects Faridabad's industrial and residential sectors directly to the aviation and logistics hub forming around Noida International Airport, with four interchange points: the starting point at Sahupura/Sector 65 on the Delhi-Mumbai Expressway link, Hirapur-Chhainsa in Faridabad, and two points on the Yamuna Expressway in Uttar Pradesh.
**Location**
**Growth Driver**
**Known Risk**
Faridabad Sectors 65, 75, 84, 88, 89
Directly on or near the expressway route
Current pricing already reflects some pre-construction anticipation
Hirapur-Chhainsa interchange
Direct entry/exit point on the corridor
Interchange-adjacent land typically sees earliest commercial interest
Ballabhgarh and Palwal villages (acquisition zone)
Corridor passes directly through these 14 villages
Land inside the notified acquisition footprint faces compensation, not resale appreciation
UP-side villages (Dayanatpur, Vallabhnagar)
Direct proximity to Noida International Airport
Airport-linked demand already a factor independent of this specific expressway
**Location**
**Growth Driver**
**Known Risk**
Faridabad Sectors 65, 75, 84, 88, 89
Directly on or near the expressway route
Current pricing already reflects some pre-construction anticipation
Hirapur-Chhainsa interchange
Direct entry/exit point on the corridor
Interchange-adjacent land typically sees earliest commercial interest
Ballabhgarh and Palwal villages (acquisition zone)
Corridor passes directly through these 14 villages
Land inside the notified acquisition footprint faces compensation, not resale appreciation
UP-side villages (Dayanatpur, Vallabhnagar)
Direct proximity to Noida International Airport
Airport-linked demand already a factor independent of this specific expressway
Market commentary cites current pricing around Rs 25,000-45,000 per square metre for plots and Rs 4,000-6,000 per square foot for apartments in the Faridabad sectors directly on the route, with institutional developers reportedly acquiring bulk land banks in anticipation. A separately planned 37 km Noida Metro extension linking Knowledge Park V to Jewar could compound this effect, though that project's own timeline depends on independent funding and approvals. Given the expressway's own repeated schedule slippage, from June 2025 to April 2027 and counting, treat any "opens next year" framing from a broker with the same caution warranted for the project's construction milestones themselves.
Anything wrong, outdated, or missing we want to hear it.
ज़मीन मालिकों और एजेंटों के लिए
मैं Haryana में अपनी ज़मीन बेचना चाहता हूँ
10:32
कृपया अपनी ज़मीन का स्थान साझा करें - हम इसे 1acre मैप पर सूचीबद्ध करेंगे, मुफ़्त.
10:32

250 Sq yds
2.5 Acres
ज़मीन खरीदारों के लिए
प्रत्येक लिस्टिंग हमारी प्रारंभिक सत्यापन प्रक्रिया से गुज़रती है।

कोट - बेहला मास्टरप्लान को लाइव मैप ओवरले के तौर पर देखें – 1acre.in पर किसी भी प्लॉट का लैंड यूज़ ज़ोन मुफ्त में चेक कर...

पंचकुला एक्सटेंशन 1 मास्टरप्लान को लाइव मैप ओवरले के तौर पर देखें – 1acre.in पर किसी भी प्लॉट का लैंड यूज़ ज़ोन मुफ़्त म...

पंचकूला एक्सटेंशन 2 (अलीपुर) मास्टरप्लान को लाइव मैप ओवरले के रूप में देखें – 1acre.in पर किसी भी प्लॉट का लैंड यूज़ ज़ो...

कोट - बेहला मास्टरप्लान को लाइव मैप ओवरले के तौर पर देखें – 1acre.in पर किसी भी प्लॉट का लैंड यूज़ ज़ोन मुफ्त में चेक कर...

पंचकुला एक्सटेंशन 1 मास्टरप्लान को लाइव मैप ओवरले के तौर पर देखें – 1acre.in पर किसी भी प्लॉट का लैंड यूज़ ज़ोन मुफ़्त म...

पंचकूला एक्सटेंशन 2 (अलीपुर) मास्टरप्लान को लाइव मैप ओवरले के रूप में देखें – 1acre.in पर किसी भी प्लॉट का लैंड यूज़ ज़ो...