
Jalbehra Patti Kankra Expressway Preview
Try the Jalbehra-Patti Kankra Expressway on the map
Sign in once and explore the layer for a full day.

Jalbehra Patti Kankra Expressway Preview
Try the Jalbehra-Patti Kankra Expressway on the map
Sign in once with your mobile number and explore the layer for a full day.
A Jalbehra-Patti Kankra Expressway land purchase depends on knowing exactly where NHAI's 22.85 km, 4-lane access-controlled greenfield corridor cuts through Kurukshetra district. The corridor is officially the Jalbehra-Shahbad section of NH-152G, part of the Shahbad-Thol Feeder Route under Bharatmala Pariyojana Phase-I. It runs from Km 0+000 at NH-152 to Km 22+850 near NH-44, and connects the 227 km Trans-Haryana Expressway (NH-152D) to the Grand Trunk Road. Ceigall India signed the concession on 20 December 2022 and had reached 90.03 percent physical completion by February 2026. This page maps the alignment and buyer checkpoints.
NHAI runs the Jalbehra-Patti Kankra corridor as a 4-lane access-controlled greenfield extension of the Trans-Haryana Expressway. Greenfield means new land taken from private khatedar owners under the National Highways Act, 1956. Access-controlled means no side entry, no field driveway, no shop opening onto the corridor. Interchanges are the only entry and exit points.
Land acquisition and 3D notifications are closed. Construction is at 90.03 percent physical completion as of February 2026, and Ceigall India's SPV is executing under Hybrid Annuity Mode. The alignment starts at Jalbehra village on NH-152 and passes through Thaska Miraanji-Megha Majra, Rohti, Jhansa, Jharauli Khurd, Kalsani-Mammon Majra, and Sulkani-Shahzadpur before ending at Shahbad on Saha Road. It crosses an existing State Highway at design chainage 18+565.
The table below shows what a Jalbehra-Patti Kankra Expressway land buyer must verify before any advance payment.
Check
What to Confirm
Failure Signal
Alignment Status
Plot inside or outside the notified 3A / 3D corridor
Seller claim of "outside the alignment" with no 3D copy
Chainage Match
Location relative to Km 0+000 (NH-152) to Km 22+850 (NH-44)
Plot marketed as "corridor land" without chainage reference
Fard (Jamabandi)
Latest khatedar name, killa number, murabba, mutation
Owner name different from sale deed or Aadhaar
Interchange Distance
Kilometres to the nearest interchange (NH-152 or NH-44)
Plot deep in the corridor with no access point within 5-10 km
Corridor Setback
Distance from the highway's Right of Way boundary
Construction intent inside the RoW
Check
What to Confirm
Failure Signal
Alignment Status
Plot inside or outside the notified 3A / 3D corridor
Seller claim of "outside the alignment" with no 3D copy
Chainage Match
Location relative to Km 0+000 (NH-152) to Km 22+850 (NH-44)
Plot marketed as "corridor land" without chainage reference
Fard (Jamabandi)
Latest khatedar name, killa number, murabba, mutation
Owner name different from sale deed or Aadhaar
Interchange Distance
Kilometres to the nearest interchange (NH-152 or NH-44)
Plot deep in the corridor with no access point within 5-10 km
Corridor Setback
Distance from the highway's Right of Way boundary
Construction intent inside the RoW
The trap is not fresh acquisition. That is complete. The trap is misrepresented proximity. Sellers along Jalbehra, Rohti and Sulkani-Shahzadpur routinely quote interchange rates for parcels well outside walking distance of either the NH-152 or NH-44 access points. Ask for the specific 3A and 3D notification numbers for the killa. Cross-check the killa and murabba number against Haryana's Jamabandi portal at jamabandi.nic.in. If the parcel is inside the 3D list, the sale is not registrable.
NHAI compensation flows to the khatedar named on the fard at the notification date. Punjab-Haryana revenue vocabulary matters: fard is ownership, jamabandi is the settlement, intkal is mutation, killa is a sub-division of the murabba grid (25 killas to a murabba). Hybrid Annuity Mode means NHAI pays 40 percent during construction and the balance as annuity to the concessionaire over the concession period. That structure is why land dispute risk transfers cleanly from private buyers to NHAI once 3D is published.
The Jalbehra-Patti Kankra stretch is a feeder, not a trunk. Its economic weight sits at three points: the Jalbehra junction with NH-152 (linking to the Trans-Haryana Expressway), the mid-corridor crossing at Ch. 18+565 with an existing State Highway, and the Shahbad-Patti Kankra terminus on NH-44 (Grand Trunk Road).
The 22.85 km link connects the 227 km Trans-Haryana Expressway (Ambala-Narnaul, NH-152D) with NH-44, effectively integrating the 313 km Ambala-Kotputli Economic Corridor with the Grand Trunk Road. That integration is why NH-152G matters more than its length suggests. The Delhi-Amritsar-Katra Expressway also runs through Kurukshetra district, and the three corridors together anchor Kurukshetra's highway grid.
The table below shows the micro-markets along the alignment and their present buyer risk profile.
Micro-Market / Village
What Drives Value
Buyer Risk
Jalbehra (Km 0+000, NH-152 junction)
Trans-Haryana Expressway feeder access
Post-3D sale voidability, high acquisition density
Thaska Miraanji, Megha Majra
Greenfield stretch, low base
Old chainage confusion, fard mismatch
Rohti, Jhansa
Mid-corridor greenfield alignment
Speculative pricing without interchange access
Jharauli Khurd, Kalsani-Mammon Majra
Sulkani-Shahzadpur belt approach
Farmer resistance history, mutation delays
Shahbad, Patti Kankra (Km 22+850, NH-44)
NH-44 (GT Road) terminus, urban anchor
Highest speculative pricing, urban zoning gaps
Micro-Market / Village
What Drives Value
Buyer Risk
Jalbehra (Km 0+000, NH-152 junction)
Trans-Haryana Expressway feeder access
Post-3D sale voidability, high acquisition density
Thaska Miraanji, Megha Majra
Greenfield stretch, low base
Old chainage confusion, fard mismatch
Rohti, Jhansa
Mid-corridor greenfield alignment
Speculative pricing without interchange access
Jharauli Khurd, Kalsani-Mammon Majra
Sulkani-Shahzadpur belt approach
Farmer resistance history, mutation delays
Shahbad, Patti Kankra (Km 22+850, NH-44)
NH-44 (GT Road) terminus, urban anchor
Highest speculative pricing, urban zoning gaps
The most misread market is Shahbad and Patti Kankra at the NH-44 terminus. The Km 22 interchange with the Grand Trunk Road drives higher pricing for adjacent parcels, but many plots being marketed as "highway access" sit past the RoW without a service lane. Ask for the exact chainage and the killa number on the 3A notification. On the Jalbehra end, the interchange at NH-152 links directly to the Trans-Haryana Expressway, and parcels here have appreciated since concession signing.
Kurukshetra district's Jamabandi has been under active mutation for at least three concurrent projects: NH-152D, NH-152G, and the Delhi-Amritsar-Katra Expressway. A single killa may sit on multiple acquisition lists. A Jalbehra-Patti Kankra Expressway land purchase without a fresh fard, a district-collector search, and a clear chainage match is guesswork.

Boundaries and numbers come from published state cadastral records. See all map layers.

View Hodal Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Hodal Masterplan 2031...

View Kot - Behla Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Panchkula Kot B...

View Mansa Devi Complex Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Mansa De...

View Hodal Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Hodal Masterplan 2031...

View Kot - Behla Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Panchkula Kot B...

View Mansa Devi Complex Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Mansa De...
Cross-check NHAI's 3A and 3D notifications for NH-152G against the Haryana Jamabandi portal at jamabandi.nic.in. Match killa, murabba and khatedar name. Never trust a Jalbehra-Patti Kankra Expressway land alignment claim from a seller alone.
The corridor is 22.85 km long, 4-lane access-controlled greenfield, part of NH-152G under Bharatmala Pariyojana Phase-I. Ceigall India signed the concession on 20 December 2022 and had reached 90.03 percent physical completion by February 2026.
The alignment starts at Jalbehra village on NH-152 and runs through Thaska Miraanji, Megha Majra, Rohti, Jhansa, Jharauli Khurd, Kalsani-Mammon Majra, and Sulkani-Shahzadpur, ending at Shahbad-Patti Kankra on NH-44 (Grand Trunk Road) in Kurukshetra district.
The 22.85 km stretch is a feeder that connects the northern end of the Trans-Haryana Expressway (NH-152D) at Jalbehra to NH-44 at Patti Kankra. It integrates the Ambala-Kotputli Economic Corridor with the Grand Trunk Road.
No. 3D notifications and land acquisition are complete. Any private sale after a 3D notification under the National Highways Act, 1956 is voidable. Compensation goes to the khatedar named on the fard at the 3D date.
Ceigall Jalbehra Shahbad Greenfield Highway Private Limited, a SPV of Ceigall India Limited, is executing the project under Hybrid Annuity Mode. Ceigall was declared L1 bidder in May 2022 at Rs 648 crore against NHAI's estimate of Rs 557.20 crore.
The corridor has two interchanges: Km 0+000 at Jalbehra on NH-152 (linking the Trans-Haryana Expressway), and Km 22 near NH-44 (Grand Trunk Road) at Patti Kankra. The alignment crosses an existing State Highway at Ch. 18+565.
NH-152G is the Shahbad-Thol Feeder Route under Bharatmala Pariyojana Phase-I, and this corridor is officially its Jalbehra-Shahbad section: 22.85 km of 4-lane access-controlled greenfield road through Kurukshetra district. It is a feeder rather than a trunk route, and that integration is why NH-152G matters more than its length suggests.
Source
Official government land and infrastructure records
Official Website
environmentclearance.nic.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
LineString / MultiLineString
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
2026
Status
Active
Anything wrong, outdated, or missing we want to hear it.