Patna Purnia Expressway land acquisition is underway across six Bihar districts, and it directly affects any khasra sitting inside the alignment's 90-metre corridor. NHAI has finalised this greenfield six-lane route linking Patna to the Seemanchal region, with the alignment officially approved on 15 January 2025 by the Alignment Approval Committee under the Ministry of Road Transport and Highways. Survey Numbers is a live on 1acre covering Patna, and the Patna-Purnia Expressway sits inside it as a masterplan marker. This page covers the acquisition notification process, the alignment controversy NHAI has already had to fact-check, and where land value is expected to move fastest.
The expressway runs 244.96 km on the latest approved alignment, beginning at Mirnagar in Vaishali on NH-22 and ending at Chand Bhatti in Purnia on NH-27, passing through Samastipur, Darbhanga, Saharsa and Madhepura. NHAI issued a formal 3A notification for land acquisition, with land being acquired across more than 250 villages in 29 blocks spanning the six affected districts. Before assuming any plot near the corridor is investable, buyers need to understand exactly where this notification places their land, since acquisition status changes everything about a parcel's near-term value.
Stage
What It Means
Buyer Action
3A Notification
Formal NHAI notice initiating land acquisition for the corridor
Check whether your khasra falls inside the notified villages and blocks
Alignment Approval
Final route locked by the Alignment Approval Committee (15 Jan 2025)
Confirm your district and block against the approved, not a rumoured, alignment
Preliminary Notice + Central Valuation Committee approval
Required before compensation valuation begins
Track whether your district's Collector has received CVC approval
Section 26(3) revaluation
Legal requirement to reassess compensation at current market rates
Insist on this revaluation before accepting any award figure
Stage
What It Means
Buyer Action
3A Notification
Formal NHAI notice initiating land acquisition for the corridor
Check whether your khasra falls inside the notified villages and blocks
Alignment Approval
Final route locked by the Alignment Approval Committee (15 Jan 2025)
Confirm your district and block against the approved, not a rumoured, alignment
Preliminary Notice + Central Valuation Committee approval
Required before compensation valuation begins
Track whether your district's Collector has received CVC approval
Section 26(3) revaluation
Legal requirement to reassess compensation at current market rates
Insist on this revaluation before accepting any award figure
A live controversy shows exactly why alignment verification matters. Media reports alleged the alignment was altered in Samastipur district's Sarai Ranjan area to benefit politically connected individuals. NHAI issued an official fact-check in June 2026 stating the alignment between Km 48 and Km 53 in Sarai Ranjan had not changed since its 15 January 2025 approval, and that all land acquisition notifications followed the originally approved route strictly. NHAI's statement specified that the approved alignment affects roughly 92 residential and commercial structures, information that matters directly if your property sits in that stretch. Don't rely on word-of-mouth about alignment shifts. Cross-check your specific khasra against the officially notified alignment, not against claims circulating locally.
The expressway's terminal connections matter as much as its length. It joins the Patna Ring Road at Dighwara, crosses the Amas-Darbhanga road in Vaishali, and reaches Chandbhatti village on the Purnia-Kishanganj NH-27. A parallel four-lane link from Meernagar in Vaishali to Dighwara in Saran is also planned, and a six-lane bridge across the Ganga connecting Dighwara to Sherpur is already under construction, which will tie the corridor into Bihta Airport access.
Location / Node
Growth Driver
Known Risk
Dighwara-Sherpur bridge zone
Direct link to Patna Ring Road and Bihta Airport access
High-visibility node; expect early speculative pricing ahead of confirmed completion
Meernagar (Vaishali) starting point
Junction with NH-22 and the parallel four-lane feeder road
Two separate road projects converge here; confirm which corridor a given khasra actually sits in
Samastipur, Darbhanga, Saharsa, Madhepura stretch
Core greenfield alignment through largely unutilised land
Sits inside active land acquisition; near-term value depends on compensation award, not resale
Chandbhatti (Purnia) terminus
Connection to NH-27 toward Kishanganj
Terminus node; upside depends on how Purnia-side development follows
Location / Node
Growth Driver
Known Risk
Dighwara-Sherpur bridge zone
Direct link to Patna Ring Road and Bihta Airport access
High-visibility node; expect early speculative pricing ahead of confirmed completion
Meernagar (Vaishali) starting point
Junction with NH-22 and the parallel four-lane feeder road
Two separate road projects converge here; confirm which corridor a given khasra actually sits in
Samastipur, Darbhanga, Saharsa, Madhepura stretch
Core greenfield alignment through largely unutilised land
Sits inside active land acquisition; near-term value depends on compensation award, not resale
Chandbhatti (Purnia) terminus
Connection to NH-27 toward Kishanganj
Terminus node; upside depends on how Purnia-side development follows
Industry commentary suggests land prices within a 10-20 km radius of the expressway could rise substantially, with some estimates citing as much as tenfold appreciation given that the alignment passes through largely undeveloped land. That kind of figure should be treated as a directional signal, not a guarantee: the districts most exposed, Samastipur, Darbhanga, Saharsa and Madhepura, are also exactly where active land acquisition and compensation disputes are unfolding right now. A khasra inside the acquisition corridor earns compensation under Section 26(3) revaluation rules, not open-market appreciation. A khasra just outside it, in the same district, is the one positioned to capture the appreciation story once the road is functional.
For Land Owners & Agents
I want to sell my land in Bihar
10:32
Plz share your Land's location - We will list it on 1acre map, for Free.
10:32

250 Sq yds
2.5 Acres
For Land Buyers
Every listing goes through our Preliminary Verification Process.

Find the Patna Master Plan 2031 PDF, Greater Patna area list, planning zones and Pataliputra satellite township status, ...

Package 4 runs 42.21 km from Balbhadarpur to Bela Nawada on NH-119D. Gazette status and the Darbhanga land checks that m...

View Gorakhpur - Siliguri Expressway alignment as a live map overlay – check land acquisition risk and plot proximity fr...

Find the Patna Master Plan 2031 PDF, Greater Patna area list, planning zones and Pataliputra satellite township status, ...

Package 4 runs 42.21 km from Balbhadarpur to Bela Nawada on NH-119D. Gazette status and the Darbhanga land checks that m...

View Gorakhpur - Siliguri Expressway alignment as a live map overlay – check land acquisition risk and plot proximity fr...
The approved alignment runs through Vaishali, Samastipur, Darbhanga, Saharsa, Madhepura and Purnia, starting at Mirnagar in Vaishali and ending at Chand Bhatti in Purnia.
NHAI has officially denied this for the Sarai Ranjan stretch in Samastipur, stating in a June 2026 fact-check that the alignment between Km 48 and Km 53 has not changed since its 15 January 2025 approval.
District Collectors are required to reassess compensation based on prevailing market rates under Section 26(3) of the Land Acquisition Act, 2013, following approval from the Central Valuation Committee.
Only a check against the NHAI-notified alignment for your specific village and block, not general district-level news, can confirm this. The 3A notification covers more than 250 villages across 29 blocks.
It has changed. Early estimates cited 282 km at roughly Rs 18,042 crore; later reports referenced a revised Terms of Reference at 244.96 km and approximately Rs 21,373.65 crore following a design change from six to four lanes on part of the route.
Industry estimates suggest substantial appreciation within a 10-20 km radius, with some citing up to tenfold increases, but this applies most directly to land outside the active acquisition corridor rather than land subject to compensation.
At Dighwara, where it also links via a six-lane Ganga bridge under construction to Sherpur, improving access toward Bihta Airport.
Its approval is a mandatory prerequisite before any district Collector can issue a preliminary land acquisition notification or begin the compensation valuation process for affected landowners.
Source
Official government land and infrastructure records
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
LineString / MultiLineString
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
2026
Status
Active