
Chennai Masterplan Preview
Try the Chennai CMDA Masterplan on the map
Sign in once and explore the layer for a full day.

Chennai Masterplan Preview
Try the Chennai CMDA Masterplan on the map
Sign in once with your mobile number and explore the layer for a full day.
The CMDA land use map is the official map of the Chennai CMDA masterplan land zone framework, which governs land use across the Chennai Metropolitan Area (CMA). The Second Master Plan and its land use maps cover the original 1,189 sq km. In October 2022 the CMA was expanded to 5,904 sq km. CMDA's 2024-25 policy note planned a Regional Strategy Plan for the expanded area, and a report updated in October 2026 says CMDA now plans to bring the added areas into the Third Master Plan. As of October 2026 the Third Master Plan has not been published as a draft: it is still under government review, and a two-month public consultation must follow before it can be notified. Notified in the Tamil Nadu Government Gazette on 2 September 2008, the Second Master Plan 2026 assigns zones including Primary Residential (R1), Mixed Residential, Commercial, Institutional, Industrial, Special and Hazardous Industrial, Agriculture, and Open Space to every parcel within the CMA. The governing authority is the Chennai Metropolitan Development Authority (CMDA), constituted in 1974 under the Tamil Nadu Town and Country Planning Act, 1971. This page covers how to view and download the official CMDA land use map, the CMDA limits after the 2022 expansion, how to check land use by village and survey number, the zones that kill transactions, the corridors that reflect real demand, and exactly how to verify a parcel before paying anything.
CMDA publishes the Second Master Plan land use maps on its own website, free to view. The Masterplan Land Use Maps page (cmdachennai.gov.in/LUMaps/Index) works village by village: choose the local body type (Corporation, Municipality, Town Panchayat or Panchayat Union), then the local body, then the village, and select View Map or Download Map. Searches for a CMDA land use map download, a CMDA land use map PDF or a CMDA landuse map of Chennai all end here. There is no separate land use map 2026 PDF that replaces these village sheets. The master plan volumes carry the wider maps and the rules that explain each zone:
Official document
Where CMDA publishes it
What it shows
Masterplan Land Use Maps
CMDA website, Quick Links
Village-wise land use sheets to view or download
Chennai city proposed land use 2026
Master Plan Volume I, Chapter 14 maps
Proposed zoning for the city area
CMA existing land use 2006
Master Plan Volume I, Chapter 14 maps
Land use when the plan was prepared
Ecologically sensitive areas map
Master Plan Volume I, Chapter 11
Areas with added restrictions
Development Regulations
Master Plan Volume II
What each zone permits
CMA expansion map
CMDA home page, Profile of CMA
The 5,904 sq km boundary
Official document
Where CMDA publishes it
What it shows
Masterplan Land Use Maps
CMDA website, Quick Links
Village-wise land use sheets to view or download
Chennai city proposed land use 2026
Master Plan Volume I, Chapter 14 maps
Proposed zoning for the city area
CMA existing land use 2006
Master Plan Volume I, Chapter 14 maps
Land use when the plan was prepared
Ecologically sensitive areas map
Master Plan Volume I, Chapter 11
Areas with added restrictions
Development Regulations
Master Plan Volume II
What each zone permits
CMA expansion map
CMDA home page, Profile of CMA
The 5,904 sq km boundary
Read the zone on the village sheet together with the Development Regulations: the map gives the zone, and the regulations decide what you can build in it. A land use map is not a layout approval, so also check the approved layout maps and any reclassification notification on the CMDA website. The Chennai Masterplan layer on the 1acre map draws these zones over satellite imagery, which helps you find the right village sheet quickly. Where the overlay and the official CMDA sheet differ, the CMDA sheet and its gazette notifications prevail.
CMDA limits decide which authority approves your plot. The Chennai Metropolitan Area covered 1,189 sq km until G.O.Ms.No.184, dated 21 October 2022, added contiguous areas of Kancheepuram, Thiruvallur, Chengalpattu and Ranipet districts. CMDA says the expansion took in contiguous areas of 1,225 villages and brought the CMA to 5,904 sq km. The expanded CMA covers Chennai district, parts of Thiruvallur, Kancheepuram and Chengalpattu districts, and part of Arakkonam taluk in Ranipet district.
Item
Erstwhile CMA
Expanded CMA (from October 2022)
Area
1,189 sq km (about 2.94 lakh acres)
5,904 sq km (about 14.59 lakh acres)
Corporations
3: Chennai, Avadi, Tambaram
4: adds Kancheepuram
Municipalities
5
12: adds Arakkonam, Chengalpattu, Maraimalai Nagar, Nandivaram-Guduvancheri, Ponneri, Tiruttani, Tiruvallur
Town panchayats
3
13, plus Thiruporur special grade town panchayat
Panchayat unions
10 (179 villages)
22
Item
Erstwhile CMA
Expanded CMA (from October 2022)
Area
1,189 sq km (about 2.94 lakh acres)
5,904 sq km (about 14.59 lakh acres)
Corporations
3: Chennai, Avadi, Tambaram
4: adds Kancheepuram
Municipalities
5
12: adds Arakkonam, Chengalpattu, Maraimalai Nagar, Nandivaram-Guduvancheri, Ponneri, Tiruttani, Tiruvallur
Town panchayats
3
13, plus Thiruporur special grade town panchayat
Panchayat unions
10 (179 villages)
22
For searches on Chennai area in acres: the expanded CMA is about 14.59 lakh acres, while Chennai city, revised to 426 sq km in 2011, is about 1.05 lakh acres. The CMDA limit map is the CMA expansion map PDF linked from the CMDA home page, and CMDA's list of local bodies names every corporation, municipality, town panchayat and panchayat union inside the boundary. The Second Master Plan land use maps were prepared for the original 1,189 sq km. For land in the added villages, confirm with CMDA which plan and approval route applies before you rely on any zone.
There is no single CMDA village map with survey numbers that also shows ownership. Land use, survey boundaries and title sit in different records, and all three must agree before you pay.
Step
Record
Where to get it
What to confirm
1
Patta and Chitta
Tamil Nadu revenue department
Owner's name, survey and subdivision number, village and taluk
2
FMB sketch
Tamil Nadu revenue department
Plot shape and area match the sale deed
3
Local body
CMDA list of local bodies in the CMA
The village is inside CMDA limits, and under which local body
4
Zone
CMDA Masterplan Land Use Maps, village sheet
The zone covering the FMB outline, for example Primary Residential or Agriculture
5
Changes since 2008
CMDA reclassification notifications
Whether the land use was reclassified, with the gazette reference
6
Layout status
CMDA approved layout maps
The layout approval number for plotted land
Step
Record
Where to get it
What to confirm
1
Patta and Chitta
Tamil Nadu revenue department
Owner's name, survey and subdivision number, village and taluk
2
FMB sketch
Tamil Nadu revenue department
Plot shape and area match the sale deed
3
Local body
CMDA list of local bodies in the CMA
The village is inside CMDA limits, and under which local body
4
Zone
CMDA Masterplan Land Use Maps, village sheet
The zone covering the FMB outline, for example Primary Residential or Agriculture
5
Changes since 2008
CMDA reclassification notifications
Whether the land use was reclassified, with the gazette reference
6
Layout status
CMDA approved layout maps
The layout approval number for plotted land
Match the FMB sketch to the village land use sheet using roads, water bodies and neighbouring survey numbers. If the plot sits on a zone boundary, ask CMDA for written confirmation of the land use before you pay an advance. For a first check, load the Chennai Masterplan and Survey Number layers together on the 1acre map; then confirm the result on the official CMDA sheet.
More land transactions in Chennai collapse at the due diligence stage over zone mismatch and unapproved layout status than any other single cause. The Madras High Court confirmed this is a live enforcement risk, not a theoretical one, as recently as February 2025. The table below shows the five CMDA zone types where buyers consistently encounter misrepresentation or compliance failures.
Zone
Permitted Use
Requires Reclassification?
Primary Trap
Primary Residential (R1)
Housing: Floor Space Index (FSI) up to 1.5; multi-story up to 2.5/2.75
No, if already R1
Unapproved layout sold as CMDA-approved; patta still held under agricultural classification
Mixed Residential
Housing plus limited commercial on ground floor
No, if correctly zoned
Plots subdivided without CMDA layout approval number
Agriculture Zone (inside CMA)
Farming only
Yes: Change of Land Use (CLU) at 3% of stamp value; clearances from TNPCB, TNHB, CMWSSB, PWD required; gazette notification mandatory
Marketed as "residential with pending conversion"; no gazette notification exists for the parcel
Industrial / Special Industrial
Manufacturing, hazardous industries
Not convertible to residential by CLU
Peripheral industrial plots near Ambattur and Manali marketed as affordable residential investments.
Open Space and Recreational
Parks, playgrounds no construction permitted
Not applicable
Marketed as farmhouse or plotted development; electricity and water connections legally denied
Zone
Permitted Use
Requires Reclassification?
Primary Trap
Primary Residential (R1)
Housing: Floor Space Index (FSI) up to 1.5; multi-story up to 2.5/2.75
No, if already R1
Unapproved layout sold as CMDA-approved; patta still held under agricultural classification
Mixed Residential
Housing plus limited commercial on ground floor
No, if correctly zoned
Plots subdivided without CMDA layout approval number
Agriculture Zone (inside CMA)
Farming only
Yes: Change of Land Use (CLU) at 3% of stamp value; clearances from TNPCB, TNHB, CMWSSB, PWD required; gazette notification mandatory
Marketed as "residential with pending conversion"; no gazette notification exists for the parcel
Industrial / Special Industrial
Manufacturing, hazardous industries
Not convertible to residential by CLU
Peripheral industrial plots near Ambattur and Manali marketed as affordable residential investments.
Open Space and Recreational
Parks, playgrounds no construction permitted
Not applicable
Marketed as farmhouse or plotted development; electricity and water connections legally denied
The unapproved layout problem is structural. CMDA's regularization scheme under Government Order (GO) 78 covers only plots registered on or before 31 December 1989. Any seller claiming a post-1989 unapproved plot is eligible for an upcoming scheme should be asked to produce a gazette notification confirming it. None appears on CMDA's Government Orders page, which was last updated in March 2024. Banks refuse home loans for unapproved layouts. Utility connections are legally withheld. In February 2025, the Madras High Court dismissed Janpriya Builders' petition to regularize seven unauthorized floors in T. Nagar and directed demolition within eight weeks, holding that regularization cannot be claimed as an absolute right (2025:MHC:426). The court specifically noted large-scale official collusion as a reason violations had persisted for over a decade. For a change of land use reclassification of agricultural land within the CMA, the CMDA process requires Patta, Chitta, Adangal, and a topo plan; agency clearances; placement before the Technical Committee and the Authority; and two publications in the Tamil Nadu Government Gazette. A file submitted to CMDA is not an approval. If a broker cannot show you a gazette notification number for the reclassification, the plot remains agricultural in law.
Not every corridor in the CMA carries the same infrastructure backing, and the CMDA masterplan designations are specific enough to separate investable zones from speculative ones. Three corridors carry the clearest plan support. The table below maps the three primary growth corridors to their Second Master Plan 2026 zone designations and confirmed infrastructure anchors.
Corridor
Key Localities
CMDA Masterplan Designation
Infrastructure Anchor
Risk Flag
OMR / Rajiv Gandhi Salai
Taramani, Sholinganallur, Siruseri, Tiruporur
IT/ITeS zone: new residential neighbourhood near Tiruporur designated in Second Master Plan
State Industries Promotion Corporation of Tamil Nadu (SIPCOT) IT Park, 868 acres (Siruseri); Chennai Metro Phase 2 Corridor 3, pile work from Thoraipakkam junction began in January 2024
Plots beyond toll plaza: confirm master plan zone designation before assuming residential classification
GST Road / Western Corridor
Guduvanchery, Sriperumbudur, Irungattukottai, Mahindra World City
Industrial zone (Sriperumbudur belt); new residential town near Sriperumbudur along GWT Road in masterplan
35+ Fortune 500 companies in the Irungattukottai-Sriperumbudur corridor; Mahindra Park SEZ (1,700 acres); 260-acre Aerospace Park at Sriperumbudur with all clearances in place
Plots adjacent to the industrial belt cannot receive residential CLU; verify zone classification independently
North Chennai
Thiruvallur, Gummidipoondi, Ambattur, Manali, Minjur
Satellite town designation (Thiruvallur, Gummidipoondi); industrial urban nodes (Ambattur, Manali) in both Master Plans
Chennai Peripheral Ring Road (CPRR) Section 1 connecting Ennore Port to Thatchur
Industrial-zoned land near Ambattur and Manali routinely marketed as residential; zone must be confirmed parcel by parcel
Corridor
Key Localities
CMDA Masterplan Designation
Infrastructure Anchor
Risk Flag
OMR / Rajiv Gandhi Salai
Taramani, Sholinganallur, Siruseri, Tiruporur
IT/ITeS zone: new residential neighbourhood near Tiruporur designated in Second Master Plan
State Industries Promotion Corporation of Tamil Nadu (SIPCOT) IT Park, 868 acres (Siruseri); Chennai Metro Phase 2 Corridor 3, pile work from Thoraipakkam junction began in January 2024
Plots beyond toll plaza: confirm master plan zone designation before assuming residential classification
GST Road / Western Corridor
Guduvanchery, Sriperumbudur, Irungattukottai, Mahindra World City
Industrial zone (Sriperumbudur belt); new residential town near Sriperumbudur along GWT Road in masterplan
35+ Fortune 500 companies in the Irungattukottai-Sriperumbudur corridor; Mahindra Park SEZ (1,700 acres); 260-acre Aerospace Park at Sriperumbudur with all clearances in place
Plots adjacent to the industrial belt cannot receive residential CLU; verify zone classification independently
North Chennai
Thiruvallur, Gummidipoondi, Ambattur, Manali, Minjur
Satellite town designation (Thiruvallur, Gummidipoondi); industrial urban nodes (Ambattur, Manali) in both Master Plans
Chennai Peripheral Ring Road (CPRR) Section 1 connecting Ennore Port to Thatchur
Industrial-zoned land near Ambattur and Manali routinely marketed as residential; zone must be confirmed parcel by parcel
The most misread corridor is GST Road near Sriperumbudur. The Second Master Plan designates new residential neighborhoods near Sriperumbudur along the western GWT Road, but the industrial belt between Irungattukottai and the main manufacturing clusters carries industrial zone classification. Expecting residential CLU approval on industrial-zoned land is not a planning miscalculation; it is a disqualifying condition. The OMR corridor is better defined: the master plan explicitly designates a new residential neighborhood near Tiruporur, and the SIPCOT IT Park at Siruseri (868 acres) anchors sustained employment demand. The affordable entry pockets now sit past the toll plaza, precisely where zone verification matters most before signing anything.
This page is based on CMDA's own website and planning documents, read in October 2026, with news reports used only for the Third Master Plan timeline, which CMDA has not published as a notice. Areas in acres are converted from CMDA's sq km figures at 247.1 acres per sq km. Where a fact could not be confirmed from an official or established source, it was left out.
* CMDA, Profile of CMA (home page, updated 5 October 2026): expanded CMA area, districts, local bodies and villages * CMDA, Masterplan Land Use Maps page: how to view and download village-wise land use maps * CMDA, Second Master Plan pages (Volume I maps, Volume II Development Regulations, gazette notification): official map and rule documents * CMDA, List of Local Bodies in the erstwhile and expanded CMA: CMDA limits table * CMDA, Government Orders page (G.O.Ms.No.184 of 2022, G.O.Ms.No.13 of 2018, regularisation orders): expansion order and regularisation status * CMDA, Chennai Metropolitan Planning Area Expansion page: expansion order and notification * Tamil Nadu Housing and Urban Development Department, CMDA policy note 2024-25: Third Master Plan work and Regional Strategy Plan * Deccan Chronicle (August 2026) and LiveChennai (July 2026): Third Master Plan status and approval steps * DT Next (October 2022 and October 2026): expansion approval and inclusion of added areas in the Third Master Plan

Boundaries and numbers come from published state cadastral records. See all map layers.

Chennai Outer Ring Road (ORR) map: the 62 km route from Vandalur to Minjur, Poonamallee and Nemilichery nodes, and CMDA ...

View Chennai Peripheral Ring Road alignment as a live map overlay – check land acquisition risk and plot proximity free ...

Chennai Port to Maduravoyal expressway route map, ramps, link to the Maduravoyal bypass and latest status, plus land che...

Chennai Outer Ring Road (ORR) map: the 62 km route from Vandalur to Minjur, Poonamallee and Nemilichery nodes, and CMDA ...

View Chennai Peripheral Ring Road alignment as a live map overlay – check land acquisition risk and plot proximity free ...

Chennai Port to Maduravoyal expressway route map, ramps, link to the Maduravoyal bypass and latest status, plus land che...
The Second Master Plan 2026, notified in the Tamil Nadu Government Gazette on 2 September 2008, assigns R1, Mixed Residential, Commercial, Industrial, Agricultural, and Open Space designations across 1,189 sq km. CMDA, constituted under the TNCP Act 1971, administers it.
No. Agricultural land within the CMA requires a formal CLU reclassification from CMDA, including a gazette-published variation notification. CLU charges are 3% of stamp valuation value. A pending application is not an approval. Construction cannot legally begin until the gazette notification is in hand.
CMDA governs all development within the original 1,189 sq km CMA. DTCP governs areas outside it. DTCP approval for a plot inside CMA does not create legal compliance. Panchayat approval alone is never valid here, and banks verify the correct authority before sanctioning any loan. Use the 1acre Premium Chennai Masterplan layer to confirm whether your survey number falls inside CMDA limits before committing.
Standard buildings up to 15 metres in R1 zones carry an FSI of 1.5 under Tamil Nadu Combined Development and Building Rules (TNCDBR) 2019. Multi-storey developments on larger amalgamated plots can qualify for 2.5 to 2.75, subject to road width, setbacks, and open space compliance.
CMDA's regularization scheme under GO 78 covers only plots registered on or before 31 December 1989. No gazetted extension appears on CMDA's Government Orders page, last updated in March 2024. The Madras High Court (2025:MHC:426) confirmed regularization is not an automatic right. Demand a gazette notification number, not a broker's verbal assurance.
Verify the Patta, Chitta, Adangal, TSLR or Field Measurement Book (FMB) sketch, CMDA layout approval number, Encumbrance Certificate for 30 years, and the full parent document chain. If no CMDA approval number exists for a post-1989 layout, get independent legal advice first.
The Second Master Plan 2026 designates residential zones near Tiruporur on OMR, Sriperumbudur on GWT Road, and satellite towns at Thiruvallur and Gummidipoondi. Guduvanchery and Urapakkam on GST Road also carry residential designations. Still verify zone classification parcel by parcel.
Yes. On the 1acre map, you can load the Chennai Masterplan layer and the Survey Number layer together. This lets you see, at any location, both the masterplan zone and the individual survey numbers overlaid on satellite imagery, so you know exactly which zone your survey number falls in before committing. Both layers are available with a Premium subscription. Subscribe to 1acre Premium .
CMDA publishes the land use maps on its website under Masterplan Land Use Maps. Choose the local body type, the local body and the village, then select Download Map to save that village sheet. The Second Master Plan volumes, including the Chennai city proposed land use 2026 map and the Development Regulations, are on the same site.
The expanded Chennai Metropolitan Area is 5,904 sq km, about 14.59 lakh acres, since the October 2022 expansion. The original CMA was 1,189 sq km, about 2.94 lakh acres. Chennai city, revised to 426 sq km in 2011, is about 1.05 lakh acres. Acre figures are converted from the published sq km areas.
G.O.Ms.No.184, dated 21 October 2022, expanded the CMA to 5,904 sq km. It now covers Chennai district, parts of Thiruvallur, Kancheepuram and Chengalpattu districts, and part of Arakkonam taluk in Ranipet district: 4 corporations, 12 municipalities, 13 town panchayats, a special grade town panchayat and 22 panchayat unions. The CMDA expansion map shows the boundary.
Not as one official document. CMDA's village land use sheets show zones, while survey numbers and plot shapes come from the revenue department's Patta, Chitta and FMB sketch. Match the FMB outline to the CMDA village sheet using roads and neighbouring survey numbers, and ask CMDA for written confirmation if the plot sits on a zone boundary.
Not yet. As of October 2026 the Third Master Plan has not been published as a draft. It is under government review, and a two-month public consultation must follow before it is notified. Until then, the Second Master Plan land use maps are the ones CMDA publishes, so check your plot's zone on those sheets.
Source
Official Chennai Metropolitan Development Authority (CMDA) documents
Official Website
cmdachennai.gov.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
Polygon / MultiPolygon
Data Format
Raster Tiles (from GeoTIFF)
Last Verified
April 2026
Status
Active
Anything wrong, outdated, or missing we want to hear it.