The Thatchoor Chittoor Expressway Chennai, also spelt Chittoor Thatchur or Thachur, is NH-716B: a 116.1 km, 6-lane access-controlled greenfield corridor by NHAI, running from Keenatampalli near Chittoor in Andhra Pradesh, where it leaves the Bengaluru-Chennai Expressway, to Thatchoor near Ponneri and Ennore in Tamil Nadu. About 75 km lies in Chittoor district and 41.5 km in Tiruvallur district. Approved under Bharatmala Pariyojana Phase 1 at Rs 3,197.56 crore, the Tiruvallur alignment runs largely inside the Chennai Metropolitan Area's 1,189 sq km planning region governed by CMDA.
In the latest update available, from late April 2026, the 96 km from Chittoor to Uthukottai had been six-laned and was set to open to the public from 1 May 2026, while the last 20.5 km to Thatchur was still being widened, with completion expected by December 2026. This page covers the route map, entry and exit points and status by package first, then the regulatory checks every land buyer must clear before paying.
NH-716B starts at a junction with the Bengaluru-Chennai Expressway (NE-7) near Varadarajulapalle village on the Chittoor side, at about km 152 of that expressway. It runs east across the Andhra Pradesh and Tamil Nadu border, which it crosses more than once, and ends at a junction with NH-716A near Kannigaipair in Tiruvallur district. From Kannigaipair the corridor uses a 10.45 km stretch shared with the Chennai Peripheral Ring Road to reach Thatchur, which gives freight a direct run to Kamarajar Port at Ennore and Kattupalli Port without entering Chennai.
The Ministry of Road Transport and Highways notification S.O. 3952(E) of 28 August 2025 lists the points the highway connects. The table sets out these NH-716B road details in that order, with chainages where a published source gives them.
Point on the route
State
Chainage
Role
Junction with NE-7 near Varadarajulapalle (Chittoor)
Andhra Pradesh
km 0
Start; link to the Bengaluru-Chennai Expressway
Varathuru
Andhra Pradesh
Not stated
Notified route point
Kanikapuram
Andhra Pradesh
Not stated
Notified route point
Kumarajapet
Tamil Nadu
Not stated
Notified route point
Veera Kaveri Raja Puram
Andhra Pradesh
km 61.38
End of the first 61.38 km stretch from Chittoor
Pondavakkam
Tamil Nadu
km 96.040
Start of Package IV
Junction with NH-716A near Kannigaipair
Tamil Nadu
km 116.100
End of NH-716B; shared CPRR stretch to Thatchur
Point on the route
State
Chainage
Role
Junction with NE-7 near Varadarajulapalle (Chittoor)
Andhra Pradesh
km 0
Start; link to the Bengaluru-Chennai Expressway
Varathuru
Andhra Pradesh
Not stated
Notified route point
Kanikapuram
Andhra Pradesh
Not stated
Notified route point
Kumarajapet
Tamil Nadu
Not stated
Notified route point
Veera Kaveri Raja Puram
Andhra Pradesh
km 61.38
End of the first 61.38 km stretch from Chittoor
Pondavakkam
Tamil Nadu
km 96.040
Start of Package IV
Junction with NH-716A near Kannigaipair
Tamil Nadu
km 116.100
End of NH-716B; shared CPRR stretch to Thatchur
The design provides 8 interchanges, and closed toll plazas charge only for the distance between entry and exit. Not every notified point is a ramp, so check the nearest confirmed interchange on the 1acre map layer and on site before paying a premium for access.
The latest update available is from late April 2026. A senior official of NHAI's Chittoor project implementation unit said Packages I and III were complete and Package II had only minor work pending, with opening to traffic set for 1 May 2026. The six-laned stretch, with a 100 kmph design speed, had been opened for trial a few days earlier, according to the same report. Swarajya reported on 29 April 2026 that about 96 km from Chittoor to Uthukottai was complete, that the remaining 20.5 km from Uthukottai to Thatchur was still being widened, and that completion was expected by December 2026. It gave the project cost as Rs 5,486.32 crore, higher than the Rs 3,197.56 crore approval figure.
Package
Stretch
Length
Contractor
Status in April 2026
Package I
Chittoor end
43.8 km
KCC Buildcon
Complete
Package II
Nagari to Pallipattu
17.58 km
EKK Infrastructure
Minor works pending before public opening
Package III
To Pondavakkam (km 96.040)
34.66 km
KNR Constructions
Complete
Package IV
Pondavakkam to Kannigaipair
About 20 km
IRB Infrastructure
Widening under way; completion expected December 2026
Package
Stretch
Length
Contractor
Status in April 2026
Package I
Chittoor end
43.8 km
KCC Buildcon
Complete
Package II
Nagari to Pallipattu
17.58 km
EKK Infrastructure
Minor works pending before public opening
Package III
To Pondavakkam (km 96.040)
34.66 km
KNR Constructions
Complete
Package IV
Pondavakkam to Kannigaipair
About 20 km
IRB Infrastructure
Widening under way; completion expected December 2026
Package IV was retendered before its award. No newer official progress note on the Tamil Nadu tail was available, so confirm the opening date for the Uthukottai to Thatchur stretch with NHAI's Chittoor project implementation unit before you price a plot on access that is not yet open.
Most plot disputes around the alignment trace to one mistake: buying parcels that fall inside both the 70m Right of Way NHAI corridor and CMDA's Agricultural Use zone under the Second Master Plan 2026. Either trap kills your plan. Both together kill the deal.
The Tamil Nadu Town and Country Planning Act 1971 governs every approval inside the metropolitan area, while the National Highways Act 1956 governs land acquisition for the corridor itself. CMDA controls 233,087 surveyed parcels, and the expressway requires 360.5 hectares of acquisition in Tamil Nadu alone.
This table maps the checks before you transfer any money.
Check
What it confirms
Where to verify
3A and 3D notification
Plot is or is not under NH Act acquisition
Tiruvallur district gazette
CMDA zone
Plot use under SMP 2026 (Agricultural, Primary Residential, Mixed Residential, Industrial, Institutional)
cmdachennai.gov.in/LUMaps
Patta and chitta
Seller is recorded owner under TN Patta Pass Book Act
eservices.tnlandregistration.gov.in
Distance from centreline
Plot sits outside the 70m corridor
NHAI alignment drawing for Lot-3 Package-1
FMB sketch match
Survey number boundaries match field measurement
Village Administrative Officer
Check
What it confirms
Where to verify
3A and 3D notification
Plot is or is not under NH Act acquisition
Tiruvallur district gazette
CMDA zone
Plot use under SMP 2026 (Agricultural, Primary Residential, Mixed Residential, Industrial, Institutional)
cmdachennai.gov.in/LUMaps
Patta and chitta
Seller is recorded owner under TN Patta Pass Book Act
eservices.tnlandregistration.gov.in
Distance from centreline
Plot sits outside the 70m corridor
NHAI alignment drawing for Lot-3 Package-1
FMB sketch match
Survey number boundaries match field measurement
Village Administrative Officer
If a plot lies inside the 70m corridor or within the 10.45 km overlap with the Chennai Peripheral Ring Road interchange at Kannigaipair, the seller cannot transfer clean title once the gazette notification is published. Brokers around Pondavakkam and Mambakkam routinely quote layout-plot rates on parcels still classified Agricultural in CMDA records. Walk away unless the patta, FMB sketch and CMDA zone all agree on the same survey number you are paying for.
The last Tamil Nadu stretch, Package IV, runs from km 96.040 at Pondavakkam to km 116.100 at Kannigaipair. Land along the Pondavakkam to Kannigaipair stretch splits cleanly into pre-construction farmland, mid-corridor transitional villages, and the Kannigaipair junction zone where speculative pricing has already taken hold.
The DPR routes the expressway through Pallipattu, Nagari, Nagalapuram, Uthukkottai, Ponnavakkam, Mambakkam, Tharatchi, Paruthimenikkuppam, Sengattakulam, Vadamadurai, Jayapuram, Maduravasal and Kannigaipair before terminating near Thatchur.
This table shows the corridor's three distinct buyer segments.
Corridor / Locality
Status
Growth Driver
Known Risk
Pallipattu, Nagari, Nagalapuram (AP edge)
Six-laned; public opening set for 1 May 2026 (April 2026 report)
Bangalore-Chennai Expressway interchange near Chittoor
Cross-border patta and CLU delays
Uthukkottai, Mambakkam, Tharatchi
Mid-corridor villages
Direct NH-716B exit access for Chennai-bound freight
Agricultural zone under SMP 2026
Pondavakkam to Kannigaipair (Package-IV)
Approaches CPRR junction; widening due by December 2026
Chennai Peripheral Ring Road interchange to Kamarajar Port
Speculative pricing; package was retendered
Corridor / Locality
Status
Growth Driver
Known Risk
Pallipattu, Nagari, Nagalapuram (AP edge)
Six-laned; public opening set for 1 May 2026 (April 2026 report)
Bangalore-Chennai Expressway interchange near Chittoor
Cross-border patta and CLU delays
Uthukkottai, Mambakkam, Tharatchi
Mid-corridor villages
Direct NH-716B exit access for Chennai-bound freight
Agricultural zone under SMP 2026
Pondavakkam to Kannigaipair (Package-IV)
Approaches CPRR junction; widening due by December 2026
Chennai Peripheral Ring Road interchange to Kamarajar Port
Speculative pricing; package was retendered
The most misunderstood stretch is the Pondavakkam to Kannigaipair tail, where the expressway overlaps the CPRR for 10.45 km. Brokers price plots here as if interchange access is guaranteed, but only 8 grade-separated interchanges exist along the full 116.1 km corridor. Pay agricultural rates for parcels not adjacent to a confirmed interchange. Convert pricing optimism into a CMDA zone reading and an FMB sketch overlay before signing anything.

Boundaries and numbers come from published state cadastral records. See all map layers.

See the Amaravati LPS map, APCRDA villages list, capital area and Phase 2 land pooling status, then check any plot's mas...

View Kakinada Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Kakinada masterpla...

TUDA Master Plan 2040 for Tirupati: see the zone map, master plan roads, LP number and LRS checks, then verify your plot...

See the Amaravati LPS map, APCRDA villages list, capital area and Phase 2 land pooling status, then check any plot's mas...

View Kakinada Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Kakinada masterpla...

TUDA Master Plan 2040 for Tirupati: see the zone map, master plan roads, LP number and LRS checks, then verify your plot...
NHAI is building it as the 116.1 km NH-716B greenfield corridor under Bharatmala Pariyojana Phase 1. The DPR was prepared by Louis Berger Group Inc under Lot-3 Package-1, at a cost of Rs 3,197.56 crore.
Total length is 116.1 km, with a 10.45 km Chennai Peripheral Ring Road overlap raising it to 126.55 km. The 70m Right of Way NHAI specification is fixed across the corridor, with a 100 kmph design speed.
The Tiruvallur land acquisition stretch covers Pallipattu, Nagari, Nagalapuram, Uthukkottai, Ponnavakkam, Mambakkam, Tharatchi, Paruthimenikkuppam, Sengattakulam, Vadamadurai, Jayapuram, Maduravasal and Kannigaipair before reaching Thatchur near Ponneri and Ennore.
Yes. The corridor terminates at Kannigaipair, joining the 133 km CPRR built by TNRDC. This routes freight from Bengaluru directly to Kamarajar Port and Kattupalli Port without entering Chennai city limits, raising land value at confirmed interchanges.
NHAI requires 360.5 hectares in Tamil Nadu and 525 hectares in Andhra Pradesh, totalling 885.5 hectares. Compensation is paid under the National Highways Act 1956 once 3D notifications are gazetted in the Tiruvallur district records.
No, not without zone verification. Most Tiruvallur parcels remain classified Agricultural in the CMDA Second Master Plan 2026 and need Change of Land Use approval before any layout, plotting or commercial development becomes legally permissible.
Yes. The expressway is split into 4 civil packages under Hybrid Annuity Mode Bharatmala. KCC Buildcon received the Letter of Award for Package 1, while Package 4 covering Pondavakkam to Kannigaipair was retendered before final award by NHAI. EKK Infrastructure holds Package 2, KNR Constructions Package 3 and IRB Infrastructure Package 4.
Yes. The alignment starts at Keenatampalli at km 152 of the 262 km Bangalore-Chennai Expressway, making it the eastern feeder that channels Bengaluru cargo through Tiruvallur straight into the Chennai Peripheral Ring Road interchange and onward to North Chennai ports.
NH-716B starts at a junction with the Bengaluru-Chennai Expressway (NE-7) near Varadarajulapalle village on the Chittoor side, at about km 152 of that expressway. The notified highway ends at a junction with NH-716A near Kannigaipair in Tiruvallur district, Tamil Nadu. From there a 10.45 km stretch shared with the Chennai Peripheral Ring Road takes the corridor to Thatchur near Ponneri.
The greenfield corridor is 116.1 km by NHAI chainage, with about 75 km in Chittoor district and 41.5 km in Tiruvallur district; some reports round this to 116.5 km. Counting the 10.45 km shared with the Chennai Peripheral Ring Road, the project length is 126.55 km. The design speed is 100 kmph.
In late April 2026 the 96 km from Chittoor to Uthukottai had been six-laned, opened for trial and was set to open to the public from 1 May 2026. The remaining 20.5 km from Uthukottai to Thatchur was still being widened, with completion expected by December 2026. Confirm the current position with NHAI before relying on access to the Tamil Nadu end.
The design provides 8 interchanges, and tolling is closed, so you pay only for the distance between entry and exit. The official notification names the route points: the NE-7 junction near Chittoor, Varathuru, Kanikapuram, Kumarajapet, Veera Kaveri Raja Puram, Pondavakkam and the NH-716A junction near Kannigaipair. Confirm actual ramps on site before paying for access.
All three spellings refer to the same place near Ponneri in Tiruvallur district, the Tamil Nadu end of the corridor. NHAI and news reports mostly use Thatchur, while this map layer uses Thatchoor. Searches for the Chittoor Thatchur expressway, Thachur to Chittoor road or NH-716B all point to the same 6-lane greenfield highway.
Source
Official NHAI / Bharatmala Pariyojana Lot-3 Package-1 documents and CMDA Second Master Plan 2026
Official Website
nhai.gov.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
Polygon / MultiPolygon
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
May 2026
Status
Active
Anything wrong, outdated, or missing we want to hear it.