
Tirupati Masterplan Preview
Try the Tirupati TUDA Masterplan on the map
Sign in once and explore the layer for a full day.

Tirupati Masterplan Preview
Try the Tirupati TUDA Masterplan on the map
Sign in once with your mobile number and explore the layer for a full day.
The Tirupati TUDA masterplan zone framework, the TUDA Master Plan 2040, covers approximately 8,319.65 sq km under the Tirupati Urban Development Authority, implemented in 2019 and operative until 2040. The TUDA Zoning and Development Promotion Regulations divide the area into zones including R1 Residential Growth Center, R2 Settlement, Commercial, Industrial, Agricultural, Water Bodies, Open Spaces, and Conservation and apply across eight urban mandals: Tirupati, Srikalahasti, Puttur, Nagari, Venkatagiri, Naidupeta, Sullurpeta, and Cuddur. This page covers what the 2040 plan contains and where its maps are published, the master plan roads now being notified, how to check a TUDA LP number and LRS status, the zone rules that govern what you can build, where layouts need TUDA approval, and which traps have already cost buyers across the TUDA region.
The TUDA Master Plan 2040 is the statutory land use plan for the Tirupati Urban Development Authority region, with a horizon year of 2040. It is not one document. TUDA publishes it as a set of plans and regulations on its website (tudaap.in), under the heading TUDA Master Plan (2040) on the home page. 1acre does not host these files.
Document
What it contains
Where on the TUDA website
TUDA Master Plan 2040
Region-wide land use zones and the master plan road network
Home page, TUDA Master Plan (2040)
Tirupati Zonal Development Plan
Detailed land use for the Tirupati zone
Same section
Srikalahasti Zonal Development Plan
Detailed land use for the Srikalahasti zone
Same section
Tirumala Zonal Development Plan
Detailed land use for Tirumala
Same section
Zoning and Development Promotion Regulations (ZDPRs), Parts A and B
Permitted uses in each zone, road width and setback rules
Same section
Draft master plan for Venkatagiri
Draft plan for the Venkatagiri jurisdiction
Notices
Sullurupeta and Naidupeta land use maps
Proposed land use maps for the two towns
Notices
Document
What it contains
Where on the TUDA website
TUDA Master Plan 2040
Region-wide land use zones and the master plan road network
Home page, TUDA Master Plan (2040)
Tirupati Zonal Development Plan
Detailed land use for the Tirupati zone
Same section
Srikalahasti Zonal Development Plan
Detailed land use for the Srikalahasti zone
Same section
Tirumala Zonal Development Plan
Detailed land use for Tirumala
Same section
Zoning and Development Promotion Regulations (ZDPRs), Parts A and B
Permitted uses in each zone, road width and setback rules
Same section
Draft master plan for Venkatagiri
Draft plan for the Venkatagiri jurisdiction
Notices
Sullurupeta and Naidupeta land use maps
Proposed land use maps for the two towns
Notices
Searches for a TUDA master plan 2040 PDF download lead to these pages: the plan maps are shown on the TUDA site and the regulations are PDFs. TUDA has also invited proposals for a GIS-based master plan, so a digital version may follow. Until then, the zone of a survey number should be confirmed against the official map with TUDA's planning section, and you can view it first on the 1acre map layer.
Master plan roads matter because land on a proposed road alignment cannot be built on and may be taken for widening. TUDA notifies each master plan road through a Road Development Plan (RDP), which lists the survey numbers the road passes through and invites objections. The draft RDPs on the TUDA website in October 2026 include:
Road development plan
Width
Length
Village and survey numbers
Tiruchanur master plan road, Phase I (RDP2026/TUDA/TIRU/0001)
100 ft (30 m)
1.50 km
Tiruchanur, Tirupati Rural; Sy. Nos. 457 to 359 via 458, 378, 377
Mangalam master plan road (RDP2026/TUDA/MGLM/00007)
100 ft
1.50 km
Mangalam, Tirupati Urban; Sy. Nos. 86 to 102, to the RTO office
Settipalli 100 ft road, Phase II
100 ft
1.07 km
Konkachennaiahgunta to Chennaiahgunta; Sy. Nos. 136 to 176
Ranganadham Road widening
20 to 30 ft widened to 60 ft (18 m)
0.93 km
Tiruchanur; from the Tirupati-Naidupeta highway
Karakambadi road
80 ft
Not stated
From the Karakambadi 150 ft road
Mangalam roads
80 ft and 60 ft
Not stated
Mangalam village
Ithepalli to Rangampeta road
Draft
Not stated
Ithepalli to Rangampeta
Road development plan
Width
Length
Village and survey numbers
Tiruchanur master plan road, Phase I (RDP2026/TUDA/TIRU/0001)
100 ft (30 m)
1.50 km
Tiruchanur, Tirupati Rural; Sy. Nos. 457 to 359 via 458, 378, 377
Mangalam master plan road (RDP2026/TUDA/MGLM/00007)
100 ft
1.50 km
Mangalam, Tirupati Urban; Sy. Nos. 86 to 102, to the RTO office
Settipalli 100 ft road, Phase II
100 ft
1.07 km
Konkachennaiahgunta to Chennaiahgunta; Sy. Nos. 136 to 176
Ranganadham Road widening
20 to 30 ft widened to 60 ft (18 m)
0.93 km
Tiruchanur; from the Tirupati-Naidupeta highway
Karakambadi road
80 ft
Not stated
From the Karakambadi 150 ft road
Mangalam roads
80 ft and 60 ft
Not stated
Mangalam village
Ithepalli to Rangampeta road
Draft
Not stated
Ithepalli to Rangampeta
TUDA also published a paper notification calling for objections and suggestions on these RDPs. The TUDA master plan roads map in Tirupati is the road layer of the 2040 plan; the RDPs turn it into survey-level alignments. The current notices do not include an outer ring road alignment. Before buying, check the survey number against every RDP for its village.
A TUDA LP number is the layout permit number on a layout approved by TUDA. Searches for a TUDA LP number search or a TUDA LRS status check usually come from buyers trying to confirm a seller's claim. TUDA's website does not offer a single search box, but the checks can be done in order:
1. Ask the seller for a copy of the TUDA layout approval proceedings and the approved layout plan. Note the LP number, date and village. Recent approvals carry numbers in the format TUDA/DPMS/3/2025/1166. 2. On tudaap.in, open Planning, then List of Approved Layouts, and look for the layout under its village. A layout missing from the list needs an explanation in writing from TUDA. 3. Match the plot number and survey number on the layout plan with the plot on the ground and in Meebhoomi records. 4. For a plot sold as regularised, ask for the individual plot regularisation proceedings, not just the layout's in-principle approval. 5. To check LRS status, quote the LRS application number to TUDA's planning section (0877-2225730). TUDA's LRS Objections page lists in-principle layout patterns notified under the Regularisation of Unapproved Plots Rules, 2020, with 15 days for objections.
What you want to check
Where to look
TUDA layouts list
tudaap.in, List of Approved Layouts
Approved building plans
tudaap.in, List of Approved Building Plans
LRS in-principle layouts
tudaap.in, LRS Objections
Pending LRS 2020 and BPS 2019 cases
TUDA notice on a special drive to dispose of pending applications
What you want to check
Where to look
TUDA layouts list
tudaap.in, List of Approved Layouts
Approved building plans
tudaap.in, List of Approved Building Plans
LRS in-principle layouts
tudaap.in, LRS Objections
Pending LRS 2020 and BPS 2019 cases
TUDA notice on a special drive to dispose of pending applications
Tirupati sits at the center of Andhra Pradesh's most active unauthorized layout problem. Within TUDA limits alone, around 915 unauthorized layouts have been identified. Across the state, the AP government has recorded over 14,000 unauthorized layouts covering nearly 78,000 acres, most of which sit outside the formal planning framework. Developers convert agricultural land into residential plots and sell them without TUDA approval, building plan sanction, or compliance with the mandatory 10% open space requirement. TUDA launched the Regularization of Unapproved Plots Rules 2020 (LRS), under which 4,254 applications were received and 2,466 were approved. A revised LRS-2025 scheme received around 2,300 applications as of October 2025. The LRS-2025 application window closed on 23 October 2025. As of October 2026, TUDA's website shows only a special drive to dispose of pending LRS 2020 and BPS 2019 applications and objection notices for in-principle layout patterns under the 2020 rules; no new application window is listed. Do not treat LRS as a live route for a plot that has not already applied. Both schemes carry a critical restriction: regularization of the layout framework does not automatically regularize individual plots. Each plot owner must apply separately. A layout reaching LRS in-principle approval status covers only road patterns and open space; it does not give building permission to individual plot buyers who have not applied and paid fees independently. The table below shows the four documents a buyer must hold and verify before any payment in the TUDA area.
Document
Issuing Authority
What It Confirms
Common Problem in TUDA
TUDA Layout Approval Order (LP number)
Tirupati Urban Development Authority
The layout is approved under TUDA Master Plan 2040; plots are legal for construction
Plots sold as "TUDA approved" without a valid LP number; LRS in-principle approval mistaken for full approval
Individual Plot Regularisation Certificate
TUDA (under LRS 2020 or LRS-2025)
A specific plot within an LRS layout has been individually regularised and is eligible for building permission
Layout LRS approval does not cover each plot; individual application and fee payment required separately
Encumbrance Certificate
Sub-Registrar, Tirupati
No loans, liens or encumbrances on title
The buyer must verify at the sub-registrar's office directly; the seller's copy is not acceptable
Patta / Meebhoomi ROR
Revenue Department, Andhra Pradesh (via Meebhoomi portal)
Ownership and land type (agriculture vs. non-agriculture) confirmed in revenue records
Agricultural land sold as residential without conversion; Meebhoomi check at meebhoomi.ap.gov.in is the primary public verification tool
Document
Issuing Authority
What It Confirms
Common Problem in TUDA
TUDA Layout Approval Order (LP number)
Tirupati Urban Development Authority
The layout is approved under TUDA Master Plan 2040; plots are legal for construction
Plots sold as "TUDA approved" without a valid LP number; LRS in-principle approval mistaken for full approval
Individual Plot Regularisation Certificate
TUDA (under LRS 2020 or LRS-2025)
A specific plot within an LRS layout has been individually regularised and is eligible for building permission
Layout LRS approval does not cover each plot; individual application and fee payment required separately
Encumbrance Certificate
Sub-Registrar, Tirupati
No loans, liens or encumbrances on title
The buyer must verify at the sub-registrar's office directly; the seller's copy is not acceptable
Patta / Meebhoomi ROR
Revenue Department, Andhra Pradesh (via Meebhoomi portal)
Ownership and land type (agriculture vs. non-agriculture) confirmed in revenue records
Agricultural land sold as residential without conversion; Meebhoomi check at meebhoomi.ap.gov.in is the primary public verification tool
TUDA is also under active vigilance scrutiny: a government inquiry launched in December 2024 is examining financial irregularities in TUDA tendering and accounts during 2019–2023. Given the inquiry, buyers are advised to confirm the current validity and status of any layout approval directly with TUDA before payment.
TUDA's approximately 8,319.65 sq km jurisdiction spans very different zone characters, from the dense urban core around Tirupati Railway Station to industrial corridors near Renigunta Airport and agricultural stretches toward Srikalahasti and Puttur. The corridor you buy in determines both your zone classification and your realistic development timeline. The Renigunta Road and Yerpedu belt is the most active investment corridor. Renigunta hosts Tirupati International Airport, IT hubs, and EMC zones; Yerpedu is being developed as a high-tech city corridor with proximity to IIT and IISER Tirupati campuses. TUDA-approved layouts along this corridor are actively selling, with LP numbers such as TUDA/DPMS/3/2025/1166 confirming recently sanctioned projects. Srikalahasti, 30 km east, benefits from industrial growth and the Tirupati–Srikalahasti six-lane road upgrade, making it an industrial and residential expansion node. Tiruchanur, home to Padmavathi Temple, carries the highest rental yields in the TUDA zone, driven by year-round pilgrimage traffic. The table below maps the key corridors within the TUDA masterplan zone to their zone character and known risk.
Corridor / Locality
Zone Character (TUDA Masterplan 2040)
Primary Growth Driver
Key Risk
Renigunta Road / Airport belt
R1 Residential Growth Center \+ Commercial nodes
Tirupati International Airport, IT and EMC hubs, NH connectivity
Plots marketed as TUDA approved without valid LP number; agricultural fringe land sold before conversion
Yerpedu
R1 Residential Growth Center
IIT Tirupati, IISER Tirupati, high-tech city corridor designation
Fast-growing area with unapproved layouts alongside legitimate TUDA-sanctioned ones; verify LP number before purchase
Tiruchanur
R1 Residential \+ Special Development (Tourism) node
Padmavathi Temple pilgrimage demand; year-round rental income
Construction within buffer zones around the Tiruchanur node subject to Special Development restrictions; confirm permissible use against zone map
Srikalahasti
R1 Residential \+ Industrial
Six-lane road to Tirupati; industrial growth; Kapilatirtham Temple tourism
Industrial zone land adjacent to residential areas often sold as purely residential; zone check is essential
Chandragiri
R2 Settlement \+ Agricultural fringe
Chandragiri Fort heritage corridor; NH connectivity
Heritage and Conservation zone designations restrict construction; confirm zone before purchase
Mangalam Road / Akkarampalle
R1 Residential (urban fringe)
Proximity to Tirupati city centre; affordable entry price
Documented concentration of non-approved plots: Akkarampalle features prominently in unapproved listing databases
Corridor / Locality
Zone Character (TUDA Masterplan 2040)
Primary Growth Driver
Key Risk
Renigunta Road / Airport belt
R1 Residential Growth Center \+ Commercial nodes
Tirupati International Airport, IT and EMC hubs, NH connectivity
Plots marketed as TUDA approved without valid LP number; agricultural fringe land sold before conversion
Yerpedu
R1 Residential Growth Center
IIT Tirupati, IISER Tirupati, high-tech city corridor designation
Fast-growing area with unapproved layouts alongside legitimate TUDA-sanctioned ones; verify LP number before purchase
Tiruchanur
R1 Residential \+ Special Development (Tourism) node
Padmavathi Temple pilgrimage demand; year-round rental income
Construction within buffer zones around the Tiruchanur node subject to Special Development restrictions; confirm permissible use against zone map
Srikalahasti
R1 Residential \+ Industrial
Six-lane road to Tirupati; industrial growth; Kapilatirtham Temple tourism
Industrial zone land adjacent to residential areas often sold as purely residential; zone check is essential
Chandragiri
R2 Settlement \+ Agricultural fringe
Chandragiri Fort heritage corridor; NH connectivity
Heritage and Conservation zone designations restrict construction; confirm zone before purchase
Mangalam Road / Akkarampalle
R1 Residential (urban fringe)
Proximity to Tirupati city centre; affordable entry price
Documented concentration of non-approved plots: Akkarampalle features prominently in unapproved listing databases
The most misunderstood area is Tiruchanur. The TUDA Zoning and Use Regulations designate it as a commercial node with special development permissions and state that residential use may be permitted only to the extent of 20% of the principal activity. This means the zone is not a straightforward residential zone. Buyers purchasing plots near the Padmavathi Temple complex assuming standard residential construction rights need to verify the specific permissible use for their survey number against the Tiruchanur Node zone table, not just the broader TUDA masterplan zone classification.
This page is based on the Tirupati Urban Development Authority's own website (tudaap.in), read in October 2026, for the master plan documents, road development plans, approved layout lists and LRS notices. Zone rules, layout figures and corridor details from the earlier version of this page are kept as published and flagged for re-checking where no current official source was found. Facts that could not be confirmed were left out.
* TUDA, home page: TUDA Master Plan (2040) section, zonal development plans, ZDPRs, notices and RDPs * TUDA, ZDPRs Parts A and B page: zoning and development promotion regulations * TUDA, draft RDPs for Tiruchanur, Mangalam, Settipalli and Ranganadham roads: road widths, lengths and survey numbers * TUDA, List of Approved Layouts and List of Approved Building Plans pages * TUDA, LRS Objections page: in-principle layout notices under the Regularisation of Unapproved Plots Rules, 2020 * TUDA, notices on the LRS 2020 and BPS 2019 special drive, the GIS-based master plan and the Venkatagiri draft master plan * Tirupati Urban Development Authority background (formation in 1981)

Boundaries and numbers come from published state cadastral records. See all map layers.

View Tirupati Air Funnel Zones on a live map – check height clearance restrictions on any plot for free on 1acre.in. Tir...

See the Amaravati LPS map, APCRDA villages list, capital area and Phase 2 land pooling status, then check any plot's mas...

View Kakinada Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Kakinada masterpla...

View Tirupati Air Funnel Zones on a live map – check height clearance restrictions on any plot for free on 1acre.in. Tir...

See the Amaravati LPS map, APCRDA villages list, capital area and Phase 2 land pooling status, then check any plot's mas...

View Kakinada Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Kakinada masterpla...
The TUDA Master Plan 2040 covers approximately 8,319.65 sq km across Tirupati and Chittoor districts under the Andhra Pradesh Metropolitan Region and Urban Development Authorities Act, 2016 (APMR&UDA Act). Jurisdiction spans 8 urban mandals plus 41 rural mandals. TUDA's Vice-Chairman approves all layouts, zones, and building plans.
It covers road patterns and open spaces only. Individual plots still need separate regularization applications and fee payments. Until individual approval is confirmed, no building permission or civic connections can be obtained. The LRS-2025 application window closed on 23 October 2025, and as of October 2026 TUDA lists no new application window, only the disposal of pending applications. Do not plan a purchase on a future LRS round.
Verify the LP number on the 1acre Premium heritage layer (https://1acre.in/subscribe), which overlays TUDA-approved and LRS-regularised layouts against satellite imagery. A genuine approval carries a TUDA tentative or final order number. Cross-check land type and ownership on Meebhoomi at meebhoomi.ap.gov.in. For LRS-approved plots, confirm both the layout-level in-principle approval AND the individual plot regularisation certificate; one does not imply the other.
No. Tiruchanur is a Special Development node where residential use is capped at 20% of the principal activity. Confirm your survey number falls in R1 or R2 zone before paying any token amount.
R1 is the Residential Growth Center zone. Apartments and group housing require roads 12 m and above. Multi-storeyed buildings need roads at least 18 m wide. Road width is as critical as zone classification.
No. Registration confirms a transaction occurred, not that TUDA has approved the layout. The LRS-2025 scheme itself applies only to registered plots, confirming that registration alone does not equal approval.
The Yerpedu corridor near IIT and IISER campuses, Renigunta near Tirupati International Airport, and Srikalahasti show the most TUDA-approved layout activity. Yerpedu in particular has many unapproved layouts adjacent to sanctioned ones, so always verify the LP number before any payment.
TUDA approval means the Tirupati Urban Development Authority has sanctioned a layout or building plan as complying with the TUDA Master Plan 2040 and its regulations. An approved layout gets an LP number and an approved plan with roads and open space. It confirms planning compliance only, not the seller's title, so you still need an encumbrance certificate and Meebhoomi check.
TUDA is the Tirupati Urban Development Authority, the planning authority for Tirupati and the surrounding towns and villages, with its office at Thathaiahgunta, Tirupati. It was constituted in 1981. TUDA prepares the master plan and zonal plans, approves layouts and building plans, notifies master plan roads and runs layout regularisation. Its website is tudaap.in.
TUDA publishes the Master Plan 2040, the Tirupati, Srikalahasti and Tirumala zonal development plans and the zoning regulations (ZDPRs Parts A and B) on its website, tudaap.in, under TUDA Master Plan (2040) on the home page. The regulations are PDFs; the plans are shown on the site. For a certified copy of the land use of a survey number, apply to TUDA's planning section.
Get the LP number, date and village from the seller's layout approval proceedings. On tudaap.in, open Planning, then List of Approved Layouts, and find the layout under its village. Then match the plot and survey numbers on the approved plan with the land and the Meebhoomi record. If the layout is not listed, ask TUDA's planning section to confirm in writing before paying.
Check the TUDA Master Plan 2040 road layer and the draft Road Development Plans on tudaap.in. In 2026 TUDA notified 100 ft master plan roads in Tiruchanur, Mangalam and Settipalli, an 80 ft road from Karakambadi and a 60 ft widening of Ranganadham Road, each with a survey number list. Land on a proposed alignment cannot be built on.
Source
Official Tirupati Urban Development Authority (TUDA) documents
Official Website
tudaap.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
Polygon / MultiPolygon
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
April 2026
Status
Active
Anything wrong, outdated, or missing we want to hear it.