The Vijayawada Metro is a Light Rail Transit system whose Phase 1 detailed project report was approved by the Andhra Pradesh government in December 2024, covering 38.4 km in two Phase 1 corridors: Gannavaram to PNBS (Pandit Nehru Bus Station) (25.9 km, 22 stations) and PNBS to Penamaluru (12.76 km, 12 stations). Total Phase 1 cost is Rs 11,009 crore. Land acquisition orders for 91 acres across NTR and Krishna districts were issued on January 30, 2025. Civil construction bids worth Rs 4,150 crore were invited in July 2025. As of October 2026 the metro is not operational: the Union Housing and Urban Affairs Ministry was reported in August 2026 to have cleared the detailed project reports and sent them to the Finance Ministry for appraisal, and no construction contract award had been announced. This Premium layer on 1acre maps the approved corridor alignment so buyers can check station proximity before purchasing near the route.
French consultancy firm SYSTRA has been appointed as the technical advisor for the project.
The Asian Infrastructure Investment Bank (AIIB) has reportedly shown interest in financing a portion of the project cost beyond the 50:50 Centre-State share.
The civil contract is on EPC (Engineering, Procurement, and Construction) basis with a 30-month overall completion period.
Vijayawada does not have a working metro as of October 2026. Phase 1 has moved from plan to tender, but central approval was still being processed and no construction contract had been announced. The timeline below lists each verified step.
Date
Step
Status
December 2024
Andhra Pradesh government approves the Phase 1 detailed project report: 38.40 km, 34 stations, Rs 11,009 crore, with Rs 1,152 crore for land acquisition
Done
30 January 2025
Land acquisition orders issued for 91 acres in NTR and Krishna districts
Notification pending (see land acquisition section)
May 2025
APMRC floats a request for proposal for a general consultant for Phase 1
Done
28 July 2025
APMRCL invites the first civil contract, about Rs 4,150 crore, EPC basis, 30 months
Bids invited
September 2025
Joint ventures allowed to bid; deadline extended to 14 October 2025
Bidding closed
February 2026
Union Housing and Urban Affairs Minister announces approval for the Vijayawada and Visakhapatnam projects; cost subject to revision after tenders
Reported
August 2026
Ministry of Housing and Urban Affairs reported to have cleared the detailed project reports and forwarded them to the Finance Ministry for financial appraisal
Awaiting appraisal
October 2026
No civil contract award or construction start announced
Pending
Date
Step
Status
December 2024
Andhra Pradesh government approves the Phase 1 detailed project report: 38.40 km, 34 stations, Rs 11,009 crore, with Rs 1,152 crore for land acquisition
Done
30 January 2025
Land acquisition orders issued for 91 acres in NTR and Krishna districts
Notification pending (see land acquisition section)
May 2025
APMRC floats a request for proposal for a general consultant for Phase 1
Done
28 July 2025
APMRCL invites the first civil contract, about Rs 4,150 crore, EPC basis, 30 months
Bids invited
September 2025
Joint ventures allowed to bid; deadline extended to 14 October 2025
Bidding closed
February 2026
Union Housing and Urban Affairs Minister announces approval for the Vijayawada and Visakhapatnam projects; cost subject to revision after tenders
Reported
August 2026
Ministry of Housing and Urban Affairs reported to have cleared the detailed project reports and forwarded them to the Finance Ministry for financial appraisal
Awaiting appraisal
October 2026
No civil contract award or construction start announced
Pending
What this means for buyers: the corridor is fixed in the approved plan, but the start date is not. The 30-month EPC period only begins once a contract is signed, so any opening date quoted before an award is an estimate. Track APMRCL tender results and the central approval before paying a metro premium.
Phase 1 has two corridors that meet at Pandit Nehru Bus Station (PNBS), the interchange. Phase 1A runs from PNBS to Gannavaram and Vijayawada Airport; Phase 1B runs from PNBS through Benz Circle to Penamaluru. The two lines add up to 38.4 km. You can view the alignment on the 1acre map layer and zoom to your survey number.
Corridor
Route
Length
Stations
Structure
Phase 1A
PNBS to Gannavaram (Vijayawada Airport)
25.9 km
22
Elevated
Phase 1B
PNBS to Penamaluru
12.76 km
12
Fully elevated
Corridor
Route
Length
Stations
Structure
Phase 1A
PNBS to Gannavaram (Vijayawada Airport)
25.9 km
22
Elevated
Phase 1B
PNBS to Penamaluru
12.76 km
12
Fully elevated
PNBS is counted on both lines, so the network has 33 distinct stations: the July 2025 civil tender lists one underground and 32 elevated stations, plus 4.33 km of double-decker flyover cum metro viaduct. The tender notice does not say which line has the underground station.
Station names reported for Phase 1B, in order from PNBS:
For Phase 1A, names published with the earlier detailed project report cover 13 of the 22 stations: PNBS, Railway Station South, Railway Station East, Besant Road, Sri Sathya Sai Mandir, SRR Government College, City Cancer Hospital, Gunadala, Ramavarappadu Ring, Prasadampadu, Ramakrishna Weigh Bridge, Enikepadu and Nidamanuru. The stations beyond Nidamanuru, up to Gannavaram, had not been officially named as of October 2026. Station names can change at the design stage, so confirm with APMRC before relying on a location.
The Vijayawada Metro's land requirement is 91 acres for depots and station sites, a much smaller footprint than a greenfield expressway. This is an elevated LRT (Light Rail Transit), not a wide acquisition corridor. The risk for land buyers is not compulsory acquisition of their plot; it is the project's demonstrated history of being shelved and the incomplete station-name list that makes corridor pricing unreliable today.
Land acquisition orders were formally issued to the Collector of NTR district on January 30, 2025, instructing submission of details for legal notifications. The total land acquisition budget is Rs 1,152 crore for 91 acres. Formal gazette notification has not yet been published. APMRCL invited civil construction bids worth Rs 4,150 crore in July 2025, the clearest signal yet that this project is in active execution. The bid deadline was extended to 14 October 2025, and as of October 2026 no award of the civil contract had been announced.
The table below shows Phase 1 corridor details and the current status of each:
Corridor
Length
Stations
Structure
Status
Gannavaram to PNBS
25.9 km
22
Elevated; double-deck at Benz Circle
Bids invited July 2025
PNBS to Penamaluru
12.76 km
12
Fully elevated
Bids invited July 2025
Corridor
Length
Stations
Structure
Status
Gannavaram to PNBS
25.9 km
22
Elevated; double-deck at Benz Circle
Bids invited July 2025
PNBS to Penamaluru
12.76 km
12
Fully elevated
Bids invited July 2025
Only 13 of the 22 station names on the Gannavaram-PNBS corridor have been officially identified. Buying a plot priced on "metro-adjacent" valuation near an unconfirmed station location is a speculative position. The project was scrapped by the YSRCP government in 2019 and revived only after TDP returned to power in 2024; that reversal took five years and reset all progress. Any land investment near the Vijayawada Metro corridor must account for that documented political risk, even though current momentum is stronger than at any prior point in the project's history.
The metro's two Phase 1 corridors cover very different land markets. The Gannavaram end is airport-adjacent with thin residential density; the Penamaluru end is an eastern suburb under active development. Properties near PNBS and Benz Circle are already dense and fully priced, so the metro adds commuter convenience but not significant appreciation headroom there.
The table below shows the key station zones along both corridors with the realistic property signal at each:
Station Zone
Corridor
Market Type
Signal
Key Risk
Gannavaram
1A (western end)
Airport suburb
Airport + metro intersection; thin current market
Station location not yet finalized
Benz Circle
1B (mid)
Dense commercial
Double-deck flyover; construction disruption during the 30-month build
Already fully priced
PNBS
Junction of 1A and 1B
Transit hub
Metro hub status; commercial demand
Priced; verify layout approvals
Autonagar
1B
Industrial corridor
Logistics and worker housing demand
Industrial zone classification; check zoning
Penamaluru
1B (eastern end)
Growing residential suburb
Terminus uplift; plots being marketed actively
12 stations confirmed; individual locations not published
Station Zone
Corridor
Market Type
Signal
Key Risk
Gannavaram
1A (western end)
Airport suburb
Airport + metro intersection; thin current market
Station location not yet finalized
Benz Circle
1B (mid)
Dense commercial
Double-deck flyover; construction disruption during the 30-month build
Already fully priced
PNBS
Junction of 1A and 1B
Transit hub
Metro hub status; commercial demand
Priced; verify layout approvals
Autonagar
1B
Industrial corridor
Logistics and worker housing demand
Industrial zone classification; check zoning
Penamaluru
1B (eastern end)
Growing residential suburb
Terminus uplift; plots being marketed actively
12 stations confirmed; individual locations not published
Penamaluru is the most actively marketed corridor for residential plots today, but the individual station locations along the 12.76-km stretch have not been officially published. Brokers pricing "metro-adjacent" plots in Penamaluru are working from projected, not notified, station positions. The unique double-deck flyover at Benz Circle is a structural feature that changes traffic access patterns in that zone during the 30-month construction window; properties with ground-floor retail fronting Benz Circle face real disruption before they gain metro-driven uplift. Construction is targeted for completion within 30 months of start; track actual APMRCL commencement notifications rather than projected start dates.
The Amaravati link is not part of the approved Phase 1. It is planned as a separate phase from PNBS to the Amaravati Reservoir station in the new capital area.
Item
Detail as reported
Route
PNBS to Amaravati Reservoir, via the Krishna Canal Junction, Undavalli and Uddandrayunipalem areas
Length
About 27.8 km
Structure
About 4.7 km elevated, about 23.1 km underground
Stations
18, 16 of them underground
Status
Planning stage; no approved cost or timeline as of October 2026
Item
Detail as reported
Route
PNBS to Amaravati Reservoir, via the Krishna Canal Junction, Undavalli and Uddandrayunipalem areas
Length
About 27.8 km
Structure
About 4.7 km elevated, about 23.1 km underground
Stations
18, 16 of them underground
Status
Planning stage; no approved cost or timeline as of October 2026
Searches for an Amaravati metro map usually expect a working line. There is none yet, and most of this phase is designed to run underground. Land near Amaravati should be judged on the capital region plan and CRDA approvals, not on a metro station that has no approved budget.
For plots between Vijayawada and Amaravati, check two things. First, whether the plot falls in the CRDA area and which zone the capital region plan gives it. Second, whether the alignment passes close enough to matter, which only becomes certain once a detailed design for this phase is approved and published by APMRC.

Boundaries and numbers come from published state cadastral records. See all map layers.

View the Vijayawada Highway - Hyd-Vijayawada, NH-65 corridor on a live map overlay – check zoning, approvals and acquisi...

See the Amaravati LPS map, APCRDA villages list, capital area and Phase 2 land pooling status, then check any plot's mas...

View Kakinada Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Kakinada masterpla...

View the Vijayawada Highway - Hyd-Vijayawada, NH-65 corridor on a live map overlay – check zoning, approvals and acquisi...

See the Amaravati LPS map, APCRDA villages list, capital area and Phase 2 land pooling status, then check any plot's mas...

View Kakinada Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Kakinada masterpla...
Yes, for plots outside the 91-acre acquisition zone, but proceed cautiously. Station positions are not all published; individual station locations along both corridors have not been officially notified. Price metro adjacency only against confirmed station coordinates, not broker-projected ones. Use 1acre's Premium map layer (https://1acre.in/subscribe) to overlay the confirmed LRT alignment on your survey number before assessing any metro-adjacent premium.
Phase 1 covers two corridors: Gannavaram to PNBS (25.9 km, 22 stations) and PNBS to Penamaluru (12.76 km, 12 stations), totalling 38.4 km across NTR and Krishna districts, all elevated except for one underground station. French consultancy firm SYSTRA has been appointed as technical advisor. The civil contract is on EPC (Engineering, Procurement, and Construction) basis with a 30-month overall completion period.
Phase 1 has 33 stations per the APMRCL civil tender (1 underground + 32 elevated), across the Gannavaram and Penamaluru corridors. Civil construction bids were invited in July 2025 on EPC basis, and the bid deadline was extended to 14 October 2025. As of October 2026, no contract award or construction start had been announced, and the detailed project reports were with the Union Finance Ministry for appraisal (reported August 2026). No confirmed groundbreaking date has been officially announced.
Phase 1 is approved at Rs 11,009 crore, including Rs 1,152 crore for land acquisition of 91 acres. The funding pattern was not final as of October 2026: a February 2026 report described 40% central funding with the rest from lenders, while an August 2026 report described 20% each from the Centre and the state and 60% from loans. The state has also requested 100% central funding.
No. Land acquisition orders were issued to the NTR district collector on January 30, 2025, instructing submission of details for legal gazette notification. Formal acquisition notifications had not been published as of mid-2025. The process is active but incomplete. The Asian Infrastructure Investment Bank (AIIB) has reportedly shown interest in financing a portion of the project cost beyond the 50:50 Centre-State share, which would add a third funding source to the project. Use 1acre's Premium map layer (https://1acre.in/subscribe) to overlay the confirmed LRT alignment on your survey number before assessing any metro-adjacent premium.
A Phase 2 extension from PNBS to Amaravati's Reservoir Station is planned. Published reports put it at about 27.8 km with 18 stations, 16 of them underground. Phase 2 is still at the planning stage; no cost or timeline is confirmed for this extension as of October 2026.
The DMRC-executed Phase 1 was cancelled in 2015 due to high cost and low ridership projections under the new Metro Rail Policy. The revised LRT plan was shelved by the YSRCP government in 2019. TDP's return to power in 2024 revived the project; the Andhra Pradesh government approved the Phase 1 DPR in December 2024, and central clearance was still in progress in August 2026.
Benz Circle will feature a unique double-deck flyover structure, which changes the street-level access profile of the junction during a 30-month construction window. Ground-floor commercial properties facing Benz Circle face disruption before gaining metro-driven demand; price that disruption into any near-term purchase.
Not yet. As of October 2026 Vijayawada has no operating metro. Phase 1 of the Vijayawada Metro LRT, 38.4 km in two corridors from PNBS to Gannavaram and to Penamaluru, has been approved by the state, and civil bids were invited in July 2025. Central appraisal was still in progress in August 2026, and no construction contract had been announced.
There is no official opening date. The civil contract allows 30 months from the start of work, but no contract had been awarded as of October 2026. A February 2026 report said services were expected to start in stages from 2029. Treat any opening year as an estimate until APMRCL announces the contract award and a start date.
The approved Phase 1 route runs from PNBS to Gannavaram and Vijayawada Airport (25.9 km) and from PNBS to Penamaluru through Benz Circle (12.76 km). APMRC has not published a final station-level map. You can view the corridor alignment on the 1acre map layer and check how far a survey number sits from it, then confirm station positions with APMRC.
Phase 1 has 33 distinct stations. The PNBS to Penamaluru line has 12, reported as PNBS, Museum, IG Stadium, DV Manor, Benz Circle, Autonagar Gate, Ravindra Bharati School, Gayatri Junior College, Law College, Tadigadapa, Poranki and Penamaluru. The PNBS to Gannavaram line has 22, of which 13 have published names. Names may change at the design stage.
Source
Official Andhra Pradesh Metro Rail Corporation documents
Official Website
apmetrorail.ap.gov.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
LineString / MultiLineString
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
May 2026
Status
Active
Anything wrong, outdated, or missing we want to hear it.