logo
Map-View
Buy Land
Sell Land
For Developers
Premium
map-view
Map
Sell
map-view Subscribe
Buy
developer-dashboard
For Developers
© 2026 - 1acre.in - All Rights Reserved
  • LinkedIn icon
  • Youtube icon
  • Instagram icon

© 2026 - 1acre.in - All Rights Reserved

LinkedIn iconYoutube iconInstagram icon
    Layers
    BIAAPA Masterplan 2021: North Bengaluru Airport Area Zone Check
    Bengaluru ASI Heritage Sites – AMASR Zone and Buffer Rules
    Bengaluru Air Funnel Zones: Building Height Restrictions
    Bengaluru BDA Masterplan Roads: RMP 2015 Road Zones
    Chikkaballapura Masterplan 2031: CUDA Zone Check and Land Use Guide
    Survey Numbers
    Nelamangala Masterplan 2031: BMRDA Zone Check and Land Use Guide
    Anekal Masterplan: Zone Check and Land Use Guide
    Hoskote Masterplan 2031: BMRDA Zone Check and Land Use Guide
    Bengaluru BDA Masterplan 2015
    Home
    Karnataka
    Bengaluru STRR (NH-948A) – Phase Status and Land-Buying Guide

    Bengaluru STRR (NH-948A) – Phase Status and Land-Buying Guide

    NHAI

    Road
    Bengaluru STRR (NH-948A) – Phase Status and Land-Buying Guide map

    Overview

    Bengaluru STRR land buying decisions require knowing which of the three phases is operational, which is legally frozen, and which localities sit inside the 1,019 sq km STRR Planning Authority jurisdiction. The Satellite Town Ring Road (NH-948A) is a 280.8 km access-controlled expressway under NHAI connecting 12 satellite towns under the Bharatmala Pariyojana. Phase 1 (Dobaspete to Hoskote, 80 km) was inaugurated on March 11, 2024 at a combined cost of over ₹2,750 crore (per NHAI award figures; verify against contract notification). Phase 2 is on hold. This page covers what that hold means for plots in and around Kanakapura and Anekal, and which corridors carry verified title and conversion status.

    Phase II is on Hold Because of Bannerghatta: What That Means for Plots Near Anekal and Kanakapura

    Phase 2 of the STRR, the 56 km section that passes through the eco-sensitive zone (ESZ) of Bannerghatta National Park (km 95.525 to km 138.0), is officially on hold. NHAI has confirmed this publicly. The alignment requires a 3.85 km elevated viaduct through the park's core zone plus ~2 km through the buffer (per Citizen Matters / NHAI feasibility), with a 28.5 m right-of-way, plus the diversion of 11 hectares of forest from the core zone and 5.7 hectares from the buffer zone. Forest clearance from the Forest Conservation Authority was still pending at the time of writing; MoEFCC had issued terms of reference but the final forest diversion approval had not been granted.

    This affects buyers in the Anekal, Kanakapura, and south-western STRR corridor directly. The upside thesis for these localities is real: Phase 3 (western packages: Somakkanamutta to Kunigal, Kunigal to Thattekere, Thattekere to Bagganadoddi) is being executed ahead of Phase 2. But a buyer purchasing agricultural land in the Anekal-Attibele belt on the assumption that Phase 2 will be operational by a specific date is carrying regulatory risk that is not priced into current broker conversations.

    The land title risk along the full STRR corridor is a separate and equally serious issue. The STRR passes through 331 villages. Agricultural land near STRR interchanges requires DC conversion before it can be used for residential or commercial development. A Gram Panchayat layout approval is not a substitute for DC conversion. Under Karnataka law, the Gram Panchayat has no authority to sanction a layout on unconverted agricultural land; any such approval is legally invalid and does not provide A-Khata status or bank loan eligibility.

    The Karnataka Land Revenue (Amendment) Rules, 2025,notified in September 2025 and finalized on 23 December 2025 after public consultation, modernised the conversion process but did not change the fundamental requirement: agricultural land must carry a valid DC conversion order before any non-agricultural use or layout development.

    Phase 1 (Pkg 1)

    Section

    Dobaspete to Doddaballapur bypass

    Length

    42 km

    Status (early 2026)

    Inaugurated March 2024 (toll collection from June 2024)

    Primary Buyer Risk

    Plots without DC conversion or BMRDA approval

    Phase 1 (Pkg 2)

    Section

    Doddaballapur to Hoskote

    Length

    37.6 km

    Status (early 2026)

    Inaugurated March 2024 (toll collection from Nov 2023)

    Primary Buyer Risk

    Same as above

    Phase 2

    Section

    Bannerghatta National Park ESZ section

    Length

    56 km

    Status (early 2026)

    On hold; MoEF&CC and National Wildlife Board cleared, Forest Conservation Authority (FCA) clearance pending

    Primary Buyer Risk

    Corridor completion timeline uncertain; price expectations not anchored

    Phase 3 (5 pkgs)

    Section

    Somakkanamutta to Ramanagara, Kunigal to Thattekere area

    Length

    144 km

    Status (early 2026)

    Tenders issued Sept 2024; ₹4,750 crore

    Primary Buyer Risk

    Agricultural land without conversion; some parcels in acquisition zone

    Phase

    Section

    Length

    Status (early 2026)

    Primary Buyer Risk

    Phase 1 (Pkg 1)

    Dobaspete to Doddaballapur bypass

    42 km

    Inaugurated March 2024 (toll collection from June 2024)

    Plots without DC conversion or BMRDA approval

    Phase 1 (Pkg 2)

    Doddaballapur to Hoskote

    37.6 km

    Inaugurated March 2024 (toll collection from Nov 2023)

    Same as above

    Phase 2

    Bannerghatta National Park ESZ section

    56 km

    On hold; MoEF&CC and National Wildlife Board cleared, Forest Conservation Authority (FCA) clearance pending

    Corridor completion timeline uncertain; price expectations not anchored

    Phase 3 (5 pkgs)

    Somakkanamutta to Ramanagara, Kunigal to Thattekere area

    144 km

    Tenders issued Sept 2024; ₹4,750 crore

    Agricultural land without conversion; some parcels in acquisition zone

    The practical rule for Bengaluru STRR land buying is this: proximity to an STRR interchange does not give agricultural land residential use rights. DC conversion does.

    Devanahalli, Hoskote, Doddaballapur and Sarjapur: How STRR Phase Status Affects Plot Decisions

    The STRR Planning Authority, set up by the Karnataka government in 2016, covers a planning area of 1,019 sq km across the 12 satellite towns. Within this jurisdiction, layout approvals flow through local planning authorities under BMRDA, including Anekal, Hoskote, Kanakapura, Nelamangala, and Ramanagara, not through Gram Panchayats. For Bengaluru STRR land buying, the approval chain to verify is: DC conversion order, local planning authority layout sanction, and RERA registration for plotted developments with 8 or more plots.

    The four corridors with the strongest sourced investment rationale are Devanahalli (north), Hoskote (east), Doddaballapur (north-west), and Sarjapur (south-east). Devanahalli carries airport-led demand from Kempegowda International Airport plus the Aerospace Park and ITIR designation. The NH-44 expansion around Devanahalli links directly to the STRR Phase 1 operational section. Hoskote is the eastern terminus of operational Phase 1 and connects to the Bengaluru-Chennai Expressway (NE-7), making it a logistics and industrial hub. Doddaballapur benefits from both the operational STRR bypass and an established textile industry base. Godrej Properties acquired a 48-acre parcel near the STRR in this belt in 2025 for a plotted residential development with approximately 1.1 million sq ft of development potential. Sarjapur is the south-eastern node: an established IT residential market that gains from STRR decongesting the ORR.

    Devanahalli

    STRR Section

    Phase 1 (operational)

    Infrastructure & Economic Drivers

    Airport, Aerospace Park, ITIR

    Current Approval Route

    BIAAPA layout approval; BDA for some pockets

    Key Risk

    Hi-tech zone acquisition risk; check master plan

    Hoskote

    STRR Section

    Phase 1 (operational)

    Infrastructure & Economic Drivers

    Logistics, Bengaluru-Chennai Expressway, industrial

    Current Approval Route

    Hoskote Planning Authority under BMRDA

    Key Risk

    Agricultural plots without conversion widely marketed

    Doddaballapur

    STRR Section

    Phase 1 (operational)

    Infrastructure & Economic Drivers

    Textile industry, logistics, Multi-Modal Logistics Park at Dobaspete

    Current Approval Route

    BMRDA local planning authority

    Key Risk

    Revenue sites and Gram Panchayat layouts still common

    Sarjapur

    STRR Section

    Phase 3 (under construction)

    Infrastructure & Economic Drivers

    IT residential spillover from Whitefield; ORR decongestion

    Current Approval Route

    BMRDA, Anekal Planning Authority

    Key Risk

    Phase 3 completion timeline tied to Bannerghatta clearance

    Corridor

    STRR Section

    Infrastructure & Economic Drivers

    Current Approval Route

    Key Risk

    Devanahalli

    Phase 1 (operational)

    Airport, Aerospace Park, ITIR

    BIAAPA layout approval; BDA for some pockets

    Hi-tech zone acquisition risk; check master plan

    Hoskote

    Phase 1 (operational)

    Logistics, Bengaluru-Chennai Expressway, industrial

    Hoskote Planning Authority under BMRDA

    Agricultural plots without conversion widely marketed

    Doddaballapur

    Phase 1 (operational)

    Textile industry, logistics, Multi-Modal Logistics Park at Dobaspete

    BMRDA local planning authority

    Revenue sites and Gram Panchayat layouts still common

    Sarjapur

    Phase 3 (under construction)

    IT residential spillover from Whitefield; ORR decongestion

    BMRDA, Anekal Planning Authority

    Phase 3 completion timeline tied to Bannerghatta clearance

    Sarjapur is the most commonly misread corridor. Buyers price Sarjapur plots at STRR-connectivity valuations even though the relevant STRR section (Phase 3 southern package near Attibele and Anekal) is still under construction and the adjacent Phase 2 Bannerghatta section remains on hold. The ORR already serves Sarjapur directly. STRR adds a second connectivity layer once Phase 3 is complete, but that completion depends on resolution of the Bannerghatta clearance issue.

    Frequently Asked Questions

    What is the Bengaluru STRR and why does it matter for land buying near satellite towns?

    The STRR (NH-948A) is a 280.8 km NHAI access-controlled expressway connecting 12 satellite towns around Bengaluru under Bharatmala Pariyojana. Phase 1 (80 km, Dobaspete to Hoskote) opened in March 2024. The STRR Planning Authority governs a 1,019 sq km planning jurisdiction — all layout approvals within this zone require sanction from the relevant local planning authority, not gram panchayats. Check whether your survey number falls inside the STRR corridor or right-of-way before any payment. View the STRR alignment on 1acre Premium.

    Which sections of the Bengaluru STRR are operational and which are under construction?

    Phase 1 (Dobaspete to Hoskote, 80 km, inaugurated March 2024) is operational with tolls collected. Phase 2 (56 km through Bannerghatta National Park's core zone) is on hold pending forest clearance — no construction date is confirmed. Phase 3 (144 km western section, 5 packages, tenders issued September 2024 at ₹4,750 crore) is mostly progressing, but Package 4 (Thattekere–Bagganadoddi, 8.34 km through Bannerghatta) also requires forest clearance and carries the same environmental hold risk as Phase 2. Full project completion (excluding Phase 2 and Package 4) is targeted for 2026–2027.

    Why is STRR Phase II on hold and what does it mean for land near Anekal?

    Phase 2 requires a 3.85 km elevated stretch through Bannerghatta National Park's core zone plus ~2 km through the buffer, diverting 11 hectares core + 5.7 hectares buffer. MoEF&CC and the National Wildlife Board have cleared the project; Forest Conservation Authority (FCA) approval is the remaining hurdle. Phase 3 Package 4 (Thattekere–Bagganadoddi, 8.34 km, ₹1,018 cr) also passes through the park with separate clearance pending — buyers near Anekal should not price on either Phase 2 or Phase 3 completion. Note: Phase 3 Package 4 (Thattekere–Bagganadoddi, 8.34 km) also passes through Bannerghatta National Park with forest clearance pending — plots near Anekal should not price in Phase 3 completion assumptions either, until this clearance is confirmed.

    Is DC conversion mandatory before buying agricultural land near the STRR?

    Yes. Gram Panchayat approval on unconverted agricultural land is legally invalid under Karnataka law. A valid DC conversion order is mandatory before any residential use. Without it, the plot has no A-Khata eligibility and banks typically refuse loans. Use the 1acre Premium STRR layer (https://1acre.in/subscribe) to verify your survey number's conversion and BMRDA layout-approval status before transacting.

    Which STRR corridors have the strongest investment rationale for Bengaluru land buyers?

    Devanahalli, Hoskote, and Doddaballapur all have operational Phase 1 STRR connectivity with documented industrial and logistics employment anchors — Airport/Aerospace Park, NE-7 Expressway, and Multi-Modal Logistics Park respectively. These corridors carry lower infrastructure uncertainty than Phase 3 or Phase 2 zones. Zone verification, DC conversion status, and LPA layout sanction remain mandatory regardless of corridor — STRR connectivity does not change agricultural land's conversion requirements or zoning.

    What approvals must a plotted layout near STRR carry to be legally secure?

    A layout needs DC conversion, a sanctioned plan from the relevant local planning authority under BMRDA (Hoskote, Anekal, or Nelamangala), and RERA registration for developments of 8 or more plots.

    What is the STRR Planning Authority and which areas does it cover?

    Karnataka set up the STRR Planning Authority in 2016. Its jurisdiction covers 1,019 sq km across 12 satellite towns. Layout approvals within this area must go through local planning authorities under BMRDA, not directly through Gram Panchayats. For layout approvals, approach the relevant local planning authority for your corridor — Hoskote Planning Authority (east), Anekal Planning Authority (south-east), Nelamangala Planning Authority (west), or BIAAPA (north around Devanahalli).

    Disclaimer

    Alignment and corridor information shown here is indicative. Users should verify details with NHAI (National Highways Authority of India) at nhai.gov.in or the relevant local planning authority before any transaction or development decision.

    Bengaluru STRR (NH-948A) – Phase Status and Land-Buying Guide is only accessible with Premium Subscription.

    Free layer preview
    Check 1acre Premium

    Data Source & Verification

    Source

    NHAI — Bharatmala Pariyojana project documents

    Official Website

    nhai.gov.in

    Coordinate Reference System

    EPSG:4326 (WGS 84)

    Geometry Type

    Polygon / MultiPolygon

    Data Format

    Vector (GeoJSON) + Raster Tiles

    Last Verified

    April 2026

    Status

    Active

    Table of Contents