logo
Map-View
Buy Land
Sell Land
For Developers
Premium
map-view
Map
Sell
map-view Subscribe
Buy
developer-dashboard
For Developers
© 2026 - 1acre.in - All Rights Reserved
  • LinkedIn icon
  • Youtube icon
  • Instagram icon

© 2026 - 1acre.in - All Rights Reserved

LinkedIn iconYoutube iconInstagram icon
    Layers
    BIAAPA Masterplan 2021: North Bengaluru Airport Area Zone Check
    Bengaluru ASI Heritage Sites – AMASR Zone and Buffer Rules
    Bengaluru Air Funnel Zones: Building Height Restrictions
    Bengaluru BDA Masterplan Roads: RMP 2015 Road Zones
    Chikkaballapura Masterplan 2031: CUDA Zone Check and Land Use Guide
    Survey Numbers
    Bengaluru STRR (NH-948A) – Phase Status and Land-Buying Guide
    Nelamangala Masterplan 2031: BMRDA Zone Check and Land Use Guide
    Anekal Masterplan: Zone Check and Land Use Guide
    Hoskote Masterplan 2031: BMRDA Zone Check and Land Use Guide
    Home
    Karnataka
    Bengaluru BDA Masterplan 2015

    Bengaluru BDA Masterplan 2015

    BDA

    Masterplan
    Bengaluru BDA Masterplan 2015 map

    Overview

    The Bengaluru BDA masterplan zone classification under the Revised Master Plan 2015 (RMP 2015) is the single most consequential document before any land purchase in the city. Notified by the Government of Karnataka via G.O. No. UDD 540 BEM AA SE 2004 dated 22 June 2007, the RMP 2015 governs the Bangalore Development Authority's Local Planning Area (LPA) covering 1,306 sq km across 387 villages. It remains operative today, as the draft RMP 2031 was withdrawn by BDA in July 2020 after public opposition and has not been resubmitted or notified, and has not been notified. This page covers how zone codes work, where the fraud traps are, which corridors are zoned for growth, and how to use the 1acre Bengaluru Masterplan layer to evaluate any survey number before signing.

    Planning-status note (April 2026): in August 2025, BDA floated a global tender for the Revised Master Plan 2041 (RMP-2041), targeting mid-2026 completion; until RMP-2041 is officially notified, all land-use decisions remain governed by RMP 2015. Separately, the Greater Bengaluru Authority (GBA) was established in May 2025 as Bengaluru's apex urban body, and a proposal to transfer planning powers over approximately 800 sq km from BDA to GBA is pending a Karnataka Town and Country Planning Act amendment — until that amendment is notified, BDA remains the statutory planning authority for layout approvals and land-use decisions within its Local Planning Area. The 1,306 sq km LPA figure reflects the original RMP 2015 extent and may change once the transfer is notified.

    For plots in the Kempegowda International Airport area north of Bengaluru, see the BIAAPA Masterplan 2021 layer. For BDA's notified road-widening reservations across the city, see the Bengaluru Masterplan Roads layer.

    Illegal Layouts and the DC Conversion Trap in Bengaluru's BDA Zone

    The most dangerous mistake a land buyer makes in Bengaluru is buying a plotted layout on agricultural land that has never received DC conversion. DC conversion, formally a Conversion Certificate issued by the Deputy Commissioner, is the mandatory first step before any agricultural land can be legally subdivided and sold for residential use under the RMP 2015. Brokers routinely omit this fact, attract buyers with discounted prices, and by the time the Khata is blocked or the building plan is rejected, the promoter has disappeared.

    The scale of this problem is documented. BDA has identified 172 unauthorised layouts within its own jurisdiction, spread across approximately 3,109 acres. A 2024 BDA notification flagged 279 illegal layouts concentrated in Yelahanka, Anekal, Bengaluru South, and Bengaluru East taluks, covering over 27,000 individual plots. These layouts were developed without obtaining RMP 2015 land-use conversion approval. In many cases, developers laid concrete roads, drilled borewells, and raised electricity poles to create the appearance of a sanctioned development, while no park or Civic Amenity site was earmarked as required by BDA regulations.

    The zone codes below define what is and is not permitted. Each code determines the FAR, permitted uses, and whether a CLU (Change of Land Use) is required before construction.

    The table shows the principal RMP 2015 land-use categories applicable within the BDA's Local Planning Area.

    R

    Zone Name

    Residential (Main / Mixed)

    Residential Construction Permitted?

    Yes

    DC Conversion Required?

    No (if already converted)

    Commonly Misrepresented?

    Low

    C

    Zone Name

    Commercial (Central / Business / Mutation Corridor)

    Residential Construction Permitted?

    Ancillary only

    DC Conversion Required?

    CLU required for residential

    Commonly Misrepresented?

    Low

    I

    Zone Name

    Industrial (General / Hi-Tech)

    Residential Construction Permitted?

    No

    DC Conversion Required?

    CLU required

    Commonly Misrepresented?

    Medium

    AG

    Zone Name

    Agriculture

    Residential Construction Permitted?

    No

    DC Conversion Required?

    DC Conversion + CLU required

    Commonly Misrepresented?

    High

    OS

    Zone Name

    Open Space / Parks

    Residential Construction Permitted?

    No

    DC Conversion Required?

    Prohibited

    Commonly Misrepresented?

    High

    PSP

    Zone Name

    Public and Semi-Public

    Residential Construction Permitted?

    No

    DC Conversion Required?

    Authority permission required

    Commonly Misrepresented?

    Medium

    Zone Code

    Zone Name

    Residential Construction Permitted?

    DC Conversion Required?

    Commonly Misrepresented?

    R

    Residential (Main / Mixed)

    Yes

    No (if already converted)

    Low

    C

    Commercial (Central / Business / Mutation Corridor)

    Ancillary only

    CLU required for residential

    Low

    I

    Industrial (General / Hi-Tech)

    No

    CLU required

    Medium

    AG

    Agriculture

    No

    DC Conversion + CLU required

    High

    OS

    Open Space / Parks

    No

    Prohibited

    High

    PSP

    Public and Semi-Public

    No

    Authority permission required

    Medium

    A BDA official confirmed in 2024 that builders selling in flagged layouts had not followed "basic guidelines," with no required road widths, no footpaths, and no parks. Buyers in those layouts will be unable to get a building plan sanction, a Khata transfer, or a bank loan. If a broker cannot show you a valid DC Conversion Order and confirm the survey number is outside the BDA's illegal layout list, the transaction ends there.

    Growth Corridors Where the BDA Masterplan Zone Directly Affects Land Value

    Bengaluru's land market moves corridor by corridor, and the BDA zone classification under RMP 2015 is the underlying driver of which corridors have investable land and which are still locked in agricultural or open-space designations.

    The strongest current corridors are differentiated by both zone status and infrastructure triggers. North Bengaluru, particularly Yelahanka, Hebbal, Thanisandra, and Devanahalli, is zoned for a mix of residential, commercial, and Hi-Tech industrial land uses in the RMP 2015. The Devanahalli belt, anchored by Kempegowda International Airport and the proposed Namma Metro Blue Line expansion, has seen consistent price appreciation. East Bengaluru, covering Whitefield, Sarjapur Road, Varthur, and Panathur Road, sits on largely residential and some commercial zones under the RMP 2015 and benefits from direct access to the ITPL, Outer Ring Road IT corridor, and Metro Purple Line. South Bengaluru corridors including Kanakapura Road have gained materially from the Namma Metro Green Line extension. The Peripheral Ring Road (PRR), for which BDA was acquiring approximately 750 acres as of late 2024, will when complete restructure land values across East and South-East Bengaluru.

    The table below maps each corridor to its dominant zone type and primary risk factor.

    Sarjapur Road

    Dominant RMP 2015 Zone

    Residential (R), some Commercial

    Infrastructure Drivers

    ORR IT corridor; proposed Metro Yellow Line extension (Bommasandra–Sarjapur–Hoskote)

    Key Risk

    Rapid layout formation, verify DC conversion

    Devanahalli / Yelahanka

    Dominant RMP 2015 Zone

    Residential + Hi-Tech Industrial

    Infrastructure Drivers

    Airport, Metro Blue Line expansion

    Key Risk

    Some AG-zoned pockets sold as residential

    Whitefield / Panathur

    Dominant RMP 2015 Zone

    Residential + Commercial

    Infrastructure Drivers

    ITPL, Metro Purple Line

    Key Risk

    Peripheral survey numbers may still be AG zone

    Kanakapura Road

    Dominant RMP 2015 Zone

    Residential + Open Space

    Infrastructure Drivers

    Metro Green Line extension

    Key Risk

    OS and valley-zone plots still being sold

    Hesaraghatta / North fringe

    Dominant RMP 2015 Zone

    Agricultural (AG) dominant

    Infrastructure Drivers

    Long-term speculation

    Key Risk

    No CLU, no conversion; high fraud exposure

    Corridor

    Dominant RMP 2015 Zone

    Infrastructure Drivers

    Key Risk

    Sarjapur Road

    Residential (R), some Commercial

    ORR IT corridor; proposed Metro Yellow Line extension (Bommasandra–Sarjapur–Hoskote)

    Rapid layout formation, verify DC conversion

    Devanahalli / Yelahanka

    Residential + Hi-Tech Industrial

    Airport, Metro Blue Line expansion

    Some AG-zoned pockets sold as residential

    Whitefield / Panathur

    Residential + Commercial

    ITPL, Metro Purple Line

    Peripheral survey numbers may still be AG zone

    Kanakapura Road

    Residential + Open Space

    Metro Green Line extension

    OS and valley-zone plots still being sold

    Hesaraghatta / North fringe

    Agricultural (AG) dominant

    Long-term speculation

    No CLU, no conversion; high fraud exposure

    The corridor most misread by buyers is the Hesaraghatta and outer North Bengaluru fringe. Proximity to Yelahanka and BDA's proposed Shivaram Karanth Layout has created speculative pricing on land that remains classified AG under the RMP 2015, with no conversion in place. Buying AG-zoned land at residential prices without a CLU approval is a documented path to loss.

    Planning-status note (April 2026): Namma Metro Phase 3 (Aug 2024 Union Cabinet approval, construction expected to begin late 2025) serves JP Nagar–Kempapura and Hosahalli–Kadabagere corridors. The Hebbal–Sarjapur line is proposed Metro Yellow Line extension — still at proposal stage with an estimated completion around 2033. "Infrastructure Drivers" in this table reflect announced or under-construction projects, not speculative investment upside.

    Frequently Asked Questions

    What is the Bengaluru BDA masterplan zone and why does it matter before buying land?

    The BDA masterplan zone is the land-use classification under the Revised Master Plan 2015 across 1,306 sq km. It determines permitted construction, applicable FAR, and whether DC conversion or CLU is required. Buying without checking is the single largest source of legal disputes in Bengaluru real estate.

    Can I build a house on agricultural zone land in Bengaluru without DC conversion?

    No. Agricultural land under RMP 2015 requires a valid Conversion Certificate from the Deputy Commissioner, followed by a CLU approval through BDA. Layouts formed directly on AG land without these approvals are illegal, ineligible for Khata, building plan sanction, or bank loans.

    What is DC conversion and how long does it take in Bengaluru?

    DC conversion is the Deputy Commissioner's order permitting agricultural land to be used for residential or commercial purposes. Cases also needing a CLU through BDA typically take 6 to 9 months combined. Neither the layout nor individual plots can be legally sold until both orders are in hand.

    How do I check if a plot in Bengaluru is in the BDA illegal layouts list?

    The BDA's illegal layouts notification identifies layouts by village name, hobli, and survey number, published in Kannada. Match your survey number against BDA's notification carefully. Transliteration discrepancies in hobli or village names are known to occur; confirm directly with BDA if any survey number is ambiguous.

    What FAR can I get on a residential plot in the BDA zone?

    Group housing within BDA limits carries an FAR of 1.75 to 3.25, based on plot size and existing approach road width under RMP 2015. The 3.25 FAR requires roads above 30 metres. FAR is always calculated on the road width that actually exists at the time of sanction.

    Is the BDA Revised Master Plan 2031 in force for Bengaluru now?

    No. The draft RMP 2031 was withdrawn by BDA in July 2020 after public opposition and has not been resubmitted or notified. The RMP 2015, notified vide G.O. UDD 540 BEM AA SE 2004 dated 22 June 2007, remains the operative plan for all land-use decisions within the BDA Local Planning Area.

    Which Bengaluru corridors carry the highest risk of AG-zone fraud?

    The Hesaraghatta fringe, outer Yelahanka villages, and parts of Anekal carry the highest exposure. BDA's 2024 notification confirms the largest concentration of illegal layouts falls in Yelahanka, Anekal, Bengaluru South, and Bengaluru East taluks, often near proposed BDA layouts like Shivaram Karanth Layout.

    What is a Mutation Corridor and how does it affect FAR in Bengaluru?

    A Mutation Corridor is a C4 commercial designation under RMP 2015 applied to plots fronting specific major roads. Properties on designated corridors with approach roads above 30 metres are eligible for FAR up to 3.25. Confirm the road is specifically designated on the RMP 2015 zone map.

    Can I see the BDA Masterplan along with all the survey numbers?

    Yes. On the 1acre map, you can load the BDA Masterplan layer and the Survey Number layer together. This lets you see, at any location, both the masterplan zone and the individual survey numbers overlaid on satellite imagery — so you know exactly which zone your survey number falls in before committing. Both layers are available with a Premium subscription. Subscribe to 1acre Premium.

    Disclaimer

    Zoning and boundary information shown here is indicative. Users should verify details with Bangalore Development Authority (BDA) at kbda.karnataka.gov.in before any transaction or development decision. Note: the Greater Bengaluru Authority (GBA), established in May 2025, is expected to assume planning jurisdiction over approximately 800 sq km of the city once the Karnataka Town and Country Planning Act amendment is notified; until then, BDA remains the statutory planning authority within its Local Planning Area.

    Bengaluru BDA Masterplan 2015 is only accessible with Premium Subscription.

    Free layer preview
    Check 1acre Premium

    Data Source & Verification

    Source

    Official Bangalore Development Authority (BDA) documents

    Official Website

    kbda.karnataka.gov.in

    Coordinate Reference System

    EPSG:4326 (WGS 84)

    Geometry Type

    Polygon / MultiPolygon

    Data Format

    Vector (GeoJSON) + Raster Tiles

    Last Verified

    April 2026

    Status

    Active

    Table of Contents