logo
Map-View
Buy Land
Sell Land
For Developers
Premium
map-view
Map
Sell
map-view Subscribe
Buy
developer-dashboard
For Developers
© 2026 - 1acre.in - All Rights Reserved
  • LinkedIn icon
  • Youtube icon
  • Instagram icon

© 2026 - 1acre.in - All Rights Reserved

LinkedIn iconYoutube iconInstagram icon
    Layers
    Nuh Masterplan 2031: DTCP Zone Check and Land Use Guide
    Jhajjar Masterplan 2031: DTCP Zone Check and Land Use Guide
    Meerut MDA Masterplan 2031: Zone Check and Land Use Guide
    Hodal Masterplan 2031: DTCP Zone Check and Land Use Guide
    Rewari Masterplan 2031: DTCP Zone Check and Land Use Guide
    Gohana Masterplan 2041: DTCP Zone Check and Land Use Guide
    Greater Bhiwadi BIDA Masterplan 2031: Zone Check and Land Use Guide
    Alwar UIT Masterplan 2031: Zone Check and Land Use Guide
    Noida (Jewar) Air Funnel Zones: Building Height Restrictions
    Delhi Air Funnel Zones: Building Height Restrictions
    Faridabad Masterplan 2031: Zone Check and Land Use Guide
    Yamuna Expressway Masterplan: YEIDA Zone Check and Land Use Guide
    Greater Noida Masterplan: Zone Check and Land Use Guide
    Noida Master Plan 2031: Zone Check and Land Use Guide
    Gurugram Masterplan 2031: Zone Check and Land Use Guide
    Sonipat Masterplan: Zone Check and Land Use Guide
    Ghaziabad GDA Masterplan: Zone Check and Land Use Guide
    Arogya Dham Badsa Masterplan: Zone Check and Land Use Guide
    Baghpat Baraut Khekra Masterplan: Zone Check and Land Use Guide
    Loni GDA Masterplan: Zone Check and Land Use Guide
    Palwal Masterplan 2031: DTCP Zone Check and Land Use Guide
    Prithla Masterplan 2031: DTCP Zone Check and Land Use Guide
    Dharuhera Masterplan 2031: DTCP Zone Check and Land Use Guide
    Kharkhauda Masterplan 2041: DTCP Zone Check and Land Use Guide
    Delhi Master Plan 2041: DDA Zone Check and Land Use Guide
    Home
    Delhi Ncr
    Modinagar GDA Masterplan: Zone Check and Land Use Guide

    Modinagar GDA Masterplan: Zone Check and Land Use Guide

    GDA-2031

    Masterplan
    Modinagar GDA Masterplan: Zone Check and Land Use Guide map

    Overview

    The Modinagar masterplan 2031 land zone plan is a GDA-prepared, GIS-based document covering 6,874.9 hectares across the Modinagar and Muradnagar planning area. The Ghaziabad Development Authority has board-approved the draft, but the UP government's gazette notification is still pending, which means the plan is not yet legally enforceable. It designates residential, commercial, industrial, recreational, and transit-oriented development zones, with TOD zones mapped within 1.5 km of both operational RRTS stations. This layer requires a Premium subscription on 1acre. This page covers zone rules, active demolition risks, and corridors with documented infrastructure backing.

    Unauthorized colonies in Modinagar: why GDA's demolition drive should change how you do due diligence

    The biggest risk in Modinagar is not a forged document. It is a layout plotted and sold without GDA sanction, sitting on a Khasra number where no development permission was ever granted. In May 2025, GDA's enforcement zone-2 team demolished a 50-bigha unauthorized colony on Khasra numbers 839 and 840 in Didauli village, using bulldozers to clear roads, homes, and boundary walls. The authority filed FIRs against the primary accused and warned that any future construction on such parcels would result in further criminal action.

    GDA publishes its unauthorized colony list at gdaghaziabad.in, updated as recently as June 2025. Check your colony name and Khasra number against this list before anything else.

    The table below shows zone types in the Modinagar masterplan 2031 draft and what each means for a buyer's buildability.

    Residential

    Permitted Use

    Housing on GDA-licensed layouts

    CLU Required?

    No, if licensed colony

    Commonly Misrepresented?

    No

    Mixed Use / Commercial

    Permitted Use

    Residential plus ground-floor commercial

    CLU Required?

    No, if licensed

    Commonly Misrepresented?

    Yes, sold as pure residential

    TOD Zone (within 1.5 km of RRTS stations)

    Permitted Use

    Residential and commercial, FAR up to 5

    CLU Required?

    No, if licensed and notified

    Commonly Misrepresented?

    Yes, sold as immediately buildable

    Industrial

    Permitted Use

    Manufacturing and ancillary uses only

    CLU Required?

    Yes, for non-industrial use

    Commonly Misrepresented?

    No

    Recreational / Green

    Permitted Use

    Parks and open space, no residential

    CLU Required?

    Yes, always

    Commonly Misrepresented?

    Frequently sold as land with future upside

    Agricultural

    Permitted Use

    Farming only

    CLU Required?

    Yes, full CLU required

    Commonly Misrepresented?

    Very frequently

    Zone Type (Modinagar Masterplan 2031 Draft)

    Permitted Use

    CLU Required?

    Commonly Misrepresented?

    Residential

    Housing on GDA-licensed layouts

    No, if licensed colony

    No

    Mixed Use / Commercial

    Residential plus ground-floor commercial

    No, if licensed

    Yes, sold as pure residential

    TOD Zone (within 1.5 km of RRTS stations)

    Residential and commercial, FAR up to 5

    No, if licensed and notified

    Yes, sold as immediately buildable

    Industrial

    Manufacturing and ancillary uses only

    Yes, for non-industrial use

    No

    Recreational / Green

    Parks and open space, no residential

    Yes, always

    Frequently sold as land with future upside

    Agricultural

    Farming only

    Yes, full CLU required

    Very frequently

    One fact no broker will volunteer: even land correctly mapped inside a TOD zone cannot be developed at FAR 5 until the UP government issues the gazette notification. That notification had not been issued as of May 2025.

    Modinagar South, Modinagar North, and which corridors have real backing from RRTS and NCRTC

    Two RRTS stations are now operational in Modinagar. Both Modinagar South and Modinagar North were inaugurated on 7 March 2024 as part of the 17 km Duhai–Modinagar North extension. The GDA masterplan draft designates TOD zones within 1.5 km of each station, and NCRTC has already invited commercial lease bids for 4,543 sq m at Modinagar South and 5,180 sq m at Modinagar North. These are the only two corridors with both operational transit and documented government commercial leasing on record.

    The table below maps the active corridors against their planning status and known risks.

    Within 1.5 km of Modinagar South RRTS station

    Masterplan 2031 Zone

    TOD Zone, Mixed Use, FAR 5 (proposed)

    Growth Driver

    Operational RRTS; NCRTC commercial lease bids invited Dec 2024

    Known Risk

    FAR 5 not enforceable until UP gazette notification

    Within 1.5 km of Modinagar North RRTS station

    Masterplan 2031 Zone

    TOD Zone, Mixed Use, FAR 5 (proposed)

    Growth Driver

    Operational RRTS; SRM University proximity at 2.8 km

    Known Risk

    Same gazette risk; verify colony license status separately

    NH-58 / Delhi–Meerut Road corridor

    Masterplan 2031 Zone

    Residential and Mixed Use

    Growth Driver

    RRTS alignment follows NH-58; transit-facing frontage

    Known Risk

    Unauthorized layouts present beyond 1.5 km station zone

    Didauli and surrounding village fringe

    Masterplan 2031 Zone

    Agricultural / Residential fringe

    Growth Driver

    None documented

    Known Risk

    Active demolition orders; GDA FIRs filed May 2025

    Industrial zone parcels, Modinagar

    Masterplan 2031 Zone

    Industrial

    Growth Driver

    Existing industrial base

    Known Risk

    Full CLU required for residential conversion; not routine

    Corridor / Locality

    Masterplan 2031 Zone

    Growth Driver

    Known Risk

    Within 1.5 km of Modinagar South RRTS station

    TOD Zone, Mixed Use, FAR 5 (proposed)

    Operational RRTS; NCRTC commercial lease bids invited Dec 2024

    FAR 5 not enforceable until UP gazette notification

    Within 1.5 km of Modinagar North RRTS station

    TOD Zone, Mixed Use, FAR 5 (proposed)

    Operational RRTS; SRM University proximity at 2.8 km

    Same gazette risk; verify colony license status separately

    NH-58 / Delhi–Meerut Road corridor

    Residential and Mixed Use

    RRTS alignment follows NH-58; transit-facing frontage

    Unauthorized layouts present beyond 1.5 km station zone

    Didauli and surrounding village fringe

    Agricultural / Residential fringe

    None documented

    Active demolition orders; GDA FIRs filed May 2025

    Industrial zone parcels, Modinagar

    Industrial

    Existing industrial base

    Full CLU required for residential conversion; not routine

    The most misread corridor is NH-58 frontage beyond the two station influence zones. Sellers market it as "RRTS corridor land" at TOD pricing. Parcels more than 1.5 km from either station fall outside the designated TOD zone in the masterplan draft. Check the satellite map before accepting any price.

    Frequently Asked Questions

    What is the Modinagar masterplan 2031 land zone plan?

    It is a GDA-prepared, GIS-based land-use plan covering 6,874.9 hectares in Modinagar and Muradnagar. It designates residential, commercial, TOD, industrial, and agricultural zones. The board approved the draft; UP government gazette notification is still pending as of May 2025.

    Is the GDA Modinagar masterplan 2031 draft approved or legally enforceable?

    GDA board-approved, but not yet legally enforceable. The UP government must issue a gazette notification before the plan takes effect. Until then, the existing Master Plan 2021 governs all development approvals in Modinagar.

    How do I check which zone my plot falls in under the GDA masterplan?

    Download the GIS-based Modinagar masterplan 2031 draft from gdaghaziabad.in, or use 1acre's Premium map layer to overlay zone classifications on satellite imagery. Agricultural zone classification means a full CLU from GDA is required before any construction.

    What is a TOD zone in the GDA masterplan and what FAR does it allow in Modinagar?

    A TOD zone covers land within 1.5 km of each RRTS station. The GDA masterplan 2031 draft proposes FAR 5 for mixed residential and commercial use in these zones. That FAR becomes enforceable only after UP issues the gazette notification.

    Can I build on agricultural land in Modinagar without a CLU from GDA?

    No. Agricultural land in the Modinagar masterplan 2031 requires a Change of Land Use from GDA before any construction. Buying on a broker's promise of future CLU approval carries full regulatory risk with no guaranteed timeline.

    How do I verify whether a colony in Modinagar is authorized by GDA?

    GDA's unauthorized colony list at gdaghaziabad.in was updated June 2025. Cross-check your colony name and Khasra number against this list. In May 2025, GDA demolished an entire 50-bigha unauthorized layout in Didauli village and filed FIRs.

    Which Modinagar areas near RRTS stations have the strongest land investment backing?

    The 1.5 km influence zones around Modinagar South and North RRTS stations have both a TOD masterplan designation and active NCRTC commercial leasing at the stations. These are the only Modinagar corridors with operational transit and formal government commercial intent on record.

    Disclaimer

    Zoning and boundary information shown here is indicative. Users should verify details with Modinagar Development Authority or relevant local planning authorities before any transaction or development decision.

    Modinagar GDA Masterplan: Zone Check and Land Use Guide is only accessible with Premium Subscription.

    Free layer preview
    Check 1acre Premium

    Data Source & Verification

    Source

    Official Ghaziabad Development Authority (GDA) – Modinagar documents

    Official Website

    gdaghaziabad.in

    Coordinate Reference System

    EPSG:4326 (WGS 84)

    Geometry Type

    Polygon / MultiPolygon

    Data Format

    Vector (GeoJSON) + Raster Tiles

    Last Verified

    2026

    Status

    Active

    Table of Contents