Hyderabad airport funnel zone restrictions affect every parcel within 56 km of Rajiv Gandhi International Airport (RGIA, IATA: HYD, ICAO: VOHS) at Shamshabad, covering the entire HADA area of 458 sq km across 70 revenue villages in Ranga Reddy District. Under the Ministry of Civil Aviation Height Restriction Rules 2015, no structure within 56 km of RGIA's Aerodrome Reference Point can be built without a No Objection Certificate (NOC) from the Airports Authority of India (RGIA is an IFR-rated airport under International Civil Aviation Organization (ICAO) classification — the 20 km limit applies only to VFR airports). The AAI has published a Colour Coded Zoning Map (CCZM) specifically for Hyderabad-Shamshabad to show Permissible Top Elevation for each grid. This page explains zone-by-zone height caps, the corridors where land still offers development potential, and the exact checks your lawyer must run before any land transaction in this area.
Most buyers focus on title and miss the bigger problem: the air funnel itself. In Hyderabad, the funnel zone runs east-west aligned with RGIA's runways and extends outward roughly 34.5 km from the airport. Inside this corridor, permitted building height equals just 2% of your distance from the runway edge. Put plainly, a plot 1,000 metres from the runway end can support a structure of only 20 metres, regardless of what the HADA master plan zone allows for that land use.
The former HADA area (now administered by the Hyderabad Metropolitan Development Authority (HMDA) since 2008) has a master plan classifying land across ten categories, but the funnel cuts across several of them. The Institutional and Special Reservation Zone, for example, permits G+4 construction only in areas that do not fall within the direct flight path. The Recreational Zone caps everything at 10 metres regardless of location. Even in High Rise Promotion Zones (HRPZ), a plot inside the funnel corridor will face a hard height ceiling set by the ICAO Annex 14 Obstacle Limitation Surfaces calculation, not by the HADA zone code alone.
This table shows the height rules that apply across key surface types near RGIA:
Surface Type
Distance from Runway
Max Permitted Height
NOC Authority
Approach / Funnel Surface
0–500 m (runway strip)
No construction
AAI
Inner Horizontal Surface
Up to 4 km from aerodrome
45 m
AAI via NOCAS
Outer Horizontal Surface
4–15 km
Increases 1 m per 20 m of distance, max 300 m
AAI via NOCAS / CCZM
Peripheral Zone
15–20 km
No height cap, NOC still required
AAI
Surface Type
Distance from Runway
Max Permitted Height
NOC Authority
Approach / Funnel Surface
0–500 m (runway strip)
No construction
AAI
Inner Horizontal Surface
Up to 4 km from aerodrome
45 m
AAI via NOCAS
Outer Horizontal Surface
4–15 km
Increases 1 m per 20 m of distance, max 300 m
AAI via NOCAS / CCZM
Peripheral Zone
15–20 km
No height cap, NOC still required
AAI
Begumpet Airport compounds this problem. Commercial flights moved to RGIA in 2008, but the Ministry of Civil Aviation has confirmed it will not lift funnel restrictions around Begumpet because VIP, helicopter, and defence operations continue there. Colonies in Mahendra Hills, Shantiniketan, and Balamrai require an NOC for even a ground-floor structure on high-altitude plots. AAI's aerodrome safeguarding team issued notices to Anna Nagar residents in Secunderabad Cantonment as recently as September 2025, demanding height clearance documentation for existing buildings built over decades. The latest policy move came in September 2026, when the Civil Aviation Minister asked officials to simplify, automate and decentralise height NOCs, including giving applicants the permissible height at the planning stage in Hyderabad, Delhi and Mumbai. These are proposals; as of October 2026 the NOCAS process below still applies.
Before any land transaction within the HADA boundary, ask the seller for the survey number and run it through the AAI NOCAS portal at nocas2.aai.aero. If the Permissible Top Elevation on the CCZM is lower than what the broker is promising, that gap is your loss.
Height approval from the Airports Authority of India in Hyderabad is applied for online on AAI's NOC Application System (NOCAS). The portal is paperless, though scanned documents must be uploaded. The steps are the same whether you file yourself or through an AAI NOC consultant for building height clearance.
Step
What you do
What to keep ready
1. Check first
Use the NOCAS check-before-applying tool or the CCZM to see the approximate permissible top elevation (AMSL) for the site
Plot location and WGS-84 coordinates
2. Survey the site
Get the site elevation and WGS-84 coordinates of the prominent corners surveyed
A licensed surveyor approved by the local body, an AAI-empanelled private surveyor or the airport operator
3. Register and file
Create a NOCAS login and file in the owner's or lessee's name; entries must match the survey certificate, as they cannot be edited after submission
Ownership or lease papers, site plan
4. Upload documents
Upload the documents NOCAS lists for your structure type (building, crane, mast, chimney)
Coordinate and elevation certificate, location plan
5. Track
Track the application with the NOC ID; issued NOCs can be viewed publicly
NOC ID
6. Review or appeal
If the height granted is lower than you need, apply for review or appeal on NOCAS
Appeals go to the Ministry of Civil Aviation's Appellate Committee and are processed at AAI's corporate office in New Delhi
Step
What you do
What to keep ready
1. Check first
Use the NOCAS check-before-applying tool or the CCZM to see the approximate permissible top elevation (AMSL) for the site
Plot location and WGS-84 coordinates
2. Survey the site
Get the site elevation and WGS-84 coordinates of the prominent corners surveyed
A licensed surveyor approved by the local body, an AAI-empanelled private surveyor or the airport operator
3. Register and file
Create a NOCAS login and file in the owner's or lessee's name; entries must match the survey certificate, as they cannot be edited after submission
Ownership or lease papers, site plan
4. Upload documents
Upload the documents NOCAS lists for your structure type (building, crane, mast, chimney)
Coordinate and elevation certificate, location plan
5. Track
Track the application with the NOC ID; issued NOCs can be viewed publicly
NOC ID
6. Review or appeal
If the height granted is lower than you need, apply for review or appeal on NOCAS
Appeals go to the Ministry of Civil Aviation's Appellate Committee and are processed at AAI's corporate office in New Delhi
Some applications are settled automatically, for example a structure below the CCZM elevation, or one beyond a set distance from the airport and at or below a set height. The NOCAS portal does not state a fixed processing time for other applications. An NOC is valid for a fixed period, and revalidation is filed on NOCAS before it expires. A consultant can manage the survey and the filing, but only AAI issues the NOC, and only in the owner's or lessee's name.
People searching for a NOCAS map or an RGIA map usually want to know how high they can build on a plot near Rajiv Gandhi International Airport. AAI's tools on NOCAS answer that in different ways, and none of them replaces an issued NOC.
Map or record
What it shows
Who uses it
When an AAI NOC is still needed
Colour Coded Zoning Map (CCZM)
Grids around the airport, each coloured to a permissible top elevation (PTE) above mean sea level
Local bodies approving buildings up to the PTE; buyers screening a plot
Site in an approach, take-off or transitional area; height above the PTE (red grids); top elevation above 150 m
NOCAS check-before-applying tool
Approximate permissible top elevation for the coordinates you enter
Owners and consultants before filing
Always, for a final height
Issued NOC records
NOCs already granted and the height allowed
Anyone, without a login
Always; a neighbour's NOC does not cover your plot
1acre air funnel layer
Funnel and HADA overlay against survey numbers
Buyers shortlisting land
Always; it is not an AAI document
Map or record
What it shows
Who uses it
When an AAI NOC is still needed
Colour Coded Zoning Map (CCZM)
Grids around the airport, each coloured to a permissible top elevation (PTE) above mean sea level
Local bodies approving buildings up to the PTE; buyers screening a plot
Site in an approach, take-off or transitional area; height above the PTE (red grids); top elevation above 150 m
NOCAS check-before-applying tool
Approximate permissible top elevation for the coordinates you enter
Owners and consultants before filing
Always, for a final height
Issued NOC records
NOCs already granted and the height allowed
Anyone, without a login
Always; a neighbour's NOC does not cover your plot
1acre air funnel layer
Funnel and HADA overlay against survey numbers
Buyers shortlisting land
Always; it is not an AAI document
To read the CCZM, locate the plot by its WGS-84 coordinates, find its home grid and colour, and read the PTE from the legend. The PTE is measured above mean sea level, so subtract the site elevation to get the height allowed above ground. As an example, a PTE of 650 m on a site at 600 m allows about 50 m above ground. When a local body approves a building under the CCZM, it must certify on the sanction plan that the height is within the permissible elevation. Ask the seller or builder for that sanctioned plan.
The Hyderabad Airport Development Authority (HADA) planned the area around the airport at Shamshabad. Its master plan was notified under G.O.Ms.No.287 MA, dated 03.04.2008. Later that year the state dissolved HADA, HUDA, CDA and BPPA and merged them into the Hyderabad Metropolitan Development Authority (HMDA) under G.O.Ms.No.572 MA, dated 25.08.2008. HADA no longer exists as a body, but its master plan still decides zoning in part of its old area.
Document
Date
What it means for a plot
HADA Master Plan, G.O.Ms.No.287 MA
03.04.2008
Zoning for the erstwhile HADA area and the villages it covers
HMDA formation, G.O.Ms.No.571 and 572 MA
25.08.2008
HADA merged into HMDA; HMDA is the planning authority
Metropolitan Development Plan 2031, G.O.Ms.No.33 MA
24.01.2013
For about 185 sq km of the HADA plan area outside the Outer Ring Road Growth Corridor, land use zoning still follows the HADA Master Plan
HMR expansion, G.O.Ms.No.68
12.03.2025
HMDA region now about 10,472 sq km across 1,355 revenue villages
Future City Development Authority, G.O.Ms.No.69
12.03.2025
56 revenue villages in 7 mandals of Rangareddy district (765.28 sq km) now fall under FCDA, not HMDA
Document
Date
What it means for a plot
HADA Master Plan, G.O.Ms.No.287 MA
03.04.2008
Zoning for the erstwhile HADA area and the villages it covers
HMDA formation, G.O.Ms.No.571 and 572 MA
25.08.2008
HADA merged into HMDA; HMDA is the planning authority
Metropolitan Development Plan 2031, G.O.Ms.No.33 MA
24.01.2013
For about 185 sq km of the HADA plan area outside the Outer Ring Road Growth Corridor, land use zoning still follows the HADA Master Plan
HMR expansion, G.O.Ms.No.68
12.03.2025
HMDA region now about 10,472 sq km across 1,355 revenue villages
Future City Development Authority, G.O.Ms.No.69
12.03.2025
56 revenue villages in 7 mandals of Rangareddy district (765.28 sq km) now fall under FCDA, not HMDA
A plot near RGIA can therefore sit under three separate rules: the HADA zone in the 2008 master plan, the HMDA or FCDA approval process, and the AAI height limit, which applies on top of both. Ask the seller for the survey number and village, check the village against the schedule in G.O.Ms.No.287, and then check the height on NOCAS.
Not every parcel near the airport is a dead end. The opportunity lies in understanding exactly where the HADA zone ends and the funnel height restrictions ease.
Shamshabad itself has height restrictions baked into every title. Development there is real, but vertical ambiguity is constant. The genuinely freer investment zone starts beyond the HADA boundary, particularly once you pass ORR Exit 16 southward on NH-44. The 13-km stretch from Exit 16 toward Thimmapur is constrained by both the HADA zone and GO 111 (on the right flank protecting Himayat Sagar catchment area). Once you clear Thimmapur, the industrial-residential split becomes cleaner.
This table maps the key corridors by development character and funnel exposure:
Corridor / Locality
Zone Classification
Growth Driver
Funnel / Height Risk
Shamshabad (core HADA area)
HADA mixed HRPZ / Work Centre / Institutional
RGIA, GMR Aerocity (1,500 acres), NH-44
High — full HADA and CCZM rules apply
Tukkuguda
HADA boundary fringe
Telangana E-City (Fab City), ORR Exit 14
Moderate — verify CCZM grid before building
Thimmapur / Palamakula
HADA transition zone
Industrial corridor, logistics parks
Moderate — HADA limit applies, confirm boundary
Kothur (beyond HADA limits)
Outside HADA, beyond funnel zone
Industrial SEZ, Natco Pharma, Amazon warehouse, NH-44
Low — outside HADA, standard HMDA rules apply
Shadnagar
Outside HADA
Microsoft data centre, MMTS extension, ISRO NRSC
Low — check regional ring road alignment
Corridor / Locality
Zone Classification
Growth Driver
Funnel / Height Risk
Shamshabad (core HADA area)
HADA mixed HRPZ / Work Centre / Institutional
RGIA, GMR Aerocity (1,500 acres), NH-44
High — full HADA and CCZM rules apply
Tukkuguda
HADA boundary fringe
Telangana E-City (Fab City), ORR Exit 14
Moderate — verify CCZM grid before building
Thimmapur / Palamakula
HADA transition zone
Industrial corridor, logistics parks
Moderate — HADA limit applies, confirm boundary
Kothur (beyond HADA limits)
Outside HADA, beyond funnel zone
Industrial SEZ, Natco Pharma, Amazon warehouse, NH-44
Low — outside HADA, standard HMDA rules apply
Shadnagar
Outside HADA
Microsoft data centre, MMTS extension, ISRO NRSC
Low — check regional ring road alignment
The most misread corridor is Kothur. Because it sits 16 km from RGIA and outside HADA limits, it avoids both the HADA development regulations and the strictest funnel height caps. That does not mean it is unrestricted. Standard HMDA zoning, Telangana State Building Permission Approval and Self-certification System (TS-bPASS) approvals, and GO 111 checks on the right side of NH-44 still apply. However, for buyers who want airport-adjacent appreciation without the funnel ceiling overhead, Kothur and Shadnagar are where the arithmetic works.

Boundaries and numbers come from published state cadastral records. See all map layers.

View Hyderabad Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Hyderabad masterp...

Hyderabad ORR map: the Nehru Outer Ring Road route and exits by area, GO 111 and LRS status, then land checks for HMDA l...

View RRR alignment as a live map overlay – check land acquisition risk and plot proximity free on 1acre.in. Hyderabad Re...

View Hyderabad Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Hyderabad masterp...

Hyderabad ORR map: the Nehru Outer Ring Road route and exits by area, GO 111 and LRS status, then land checks for HMDA l...

View RRR alignment as a live map overlay – check land acquisition risk and plot proximity free on 1acre.in. Hyderabad Re...
The funnel zone is the approach and departure corridor aligned with RGIA's runways. Height limits inside it follow a 2% gradient rule: permitted height equals 2% of distance from the runway edge. It extends roughly 34.5 km east-west from the airport.
You do not need an NOC to buy, but you need one before construction. Any structure within 56 km of RGIA's Aerodrome Reference Point requires a height clearance NOC from AAI filed through the NOCAS (NOC Application System) portal, as RGIA is an IFR (Instrument Flight Rules)-rated airport.
The former HADA area — now under HMDA jurisdiction since 2008 — covers 458 sq km across 70 revenue villages in Ranga Reddy District around RGIA Shamshabad. Full village list: G.O.Ms. No. 287 (MA & UD dated 03.04.2008). Verify your survey number against HADA boundaries before transacting.
Inside the inner horizontal surface (within 4 km of the aerodrome), the cap is 45 m. In the approach funnel itself, height equals 2% of distance from the runway. Beyond 15 km, there is no fixed cap but an NOC is still mandatory.
Yes. Kothur falls outside HADA limits and beyond the strictest funnel surface. Standard HMDA zoning applies. It is one of the few NH-44 corridor locations where air funnel zone building rules do not constrain vertical development.
Visit nocas2.aai.aero, enter your World Geodetic System 1984 (WGS-84) coordinates and site elevation. The CCZM for Hyderabad-Shamshabad will show your Permissible Top Elevation — below 150 m, local bodies can clear permits directly. For a faster visual check, overlay your survey number on the 1acre Premium map (1acre.in/subscribe) to see funnel zone boundaries before approaching NOCAS.
The Colour Coded Zoning Map issued by AAI shows permissible height grids around RGIA. It delegates approval authority to GHMC or HMDA for structures below 150 m, avoiding the need for a full NOCAS application in most standard residential plots.
Only if your CCZM permissible top elevation covers your proposed structure and the local body approves it directly. For any structure above 15 m above ground level, an AAI height NOC via NOCAS is mandatory before construction starts.
The NOCAS portal does not state a fixed processing time. Applications for structures below the CCZM elevation, or beyond a set distance from the airport and at or below a set height, can be settled automatically by the system. Others go through AAI review. In September 2026 the Civil Aviation Minister asked officials to make the process time-bound, but no new timeline had been notified as of October 2026.
No. Owners can file on NOCAS themselves. What you do need is a site survey: the site elevation and WGS-84 coordinates must come from a licensed surveyor approved by the local body, an AAI-empanelled private surveyor or the airport operator. Many owners hire a consultant to manage the survey and filing, but only AAI issues the NOC, in the owner's or lessee's name.
NOCAS is AAI's online NOC Application System. Its map tools show the Colour Coded Zoning Maps of major airports and give an approximate permissible top elevation for coordinates you enter before applying. The figure is above mean sea level, so subtract your site elevation to get the height above ground. Treat it as a screen; only an issued NOC fixes the height for your plot.
No. HADA was dissolved and merged into HMDA under G.O.Ms.No.572 MA, dated 25.08.2008, so HMDA handles approvals. Zoning in part of the old HADA area still follows the HADA Master Plan notified under G.O.Ms.No.287 MA in April 2008. Villages moved into the Future City Development Authority in March 2025 now come under FCDA instead.
Source
Official Airports Authority of India (AAI) / Directorate General of Civil Aviation (DGCA) documents
Official Website
aai.aero
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
Polygon / MultiPolygon
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
April 2026
Status
Active
Anything wrong, outdated, or missing we want to hear it.