The Nehru Outer Ring Road, better known as the Hyderabad ORR, is a 158 km, 8-lane access-controlled expressway encircling Hyderabad, with two-lane service roads on both sides. It is fully operational and administered by HMDA through the Hyderabad Growth Corridor Limited (HGCL); since 12 August 2023, IRB Golconda Expressway has collected tolls and operated it under a 30-year toll-operate-transfer concession from HMDA. It links Rajiv Gandhi International Airport at Shamshabad with the western IT and financial district, the northern pharma-biotech belt, and the south-eastern aerospace and hardware clusters. Its interchange network has expanded beyond the original 19: Narsingi opened as the 20th interchange in July 2023, and more access points have been added or proposed since. For a land buyer, the ORR is not one market. Whether a plot is buildable, bankable, and resaleable is decided by three things most brokers skip: the Multi-Purpose Use Zone that HMDA applies to the Growth Corridor along the 1 km belt on either side of the road, the gap between a Gram Panchayat layout and an HMDA-sanctioned (LP) layout, and lake Full Tank Level (FTL) and catchment restrictions in the western fringe. This page covers the ORR route map and exits, the status of GO 111 and LRS as of October 2026, the approval chain that separates a legal plot from a regularisation gamble, and the radial corridors where land value is grounded in real infrastructure rather than proximity alone.
The Hyderabad ORR map is a closed loop of 158 km, built in stages between November 2008 and July 2016, that crosses the main highways leaving the city, including NH 44, NH 65, NH 161, NH 163 and NH 765. Vehicles can join or leave only at interchanges, and two- and three-wheelers are not allowed on the main carriageway. In Telugu, the road is ఔటర్ రింగ్ రోడ్ (Outer Ring Road), and the ORR route map below lists its interchanges by area. Exit numbers run around the ring and appear on ORR signage. The table gives the numbers confirmed in published reports and names the other interchanges by locality.
Area
Interchange or exit
Exit number
West
Gachibowli, Nanakramguda (Financial District)
Not confirmed
West
Narsingi (20th interchange, opened July 2023)
18A
West
Kokapet
Not confirmed
North-west
Patancheru (Muttangi junction)
3
North
Dommarapochampalli
Not confirmed
North
Medchal (Kandlakoya junction, NH 44)
Not confirmed
North
Shamirpet (SH 1)
7
East
Keesara; Ghatkesar (Annojiguda junction)
Not confirmed
East
Taramatipet
10
East
Pedda Amberpet
11
South-east
Bongloor
Not confirmed
South-east
Tukkuguda
14
South
Pedda Golconda
15
South
Shamshabad (airport)
16
South-west
TSPA junction (Rajendranagar)
18
Area
Interchange or exit
Exit number
West
Gachibowli, Nanakramguda (Financial District)
Not confirmed
West
Narsingi (20th interchange, opened July 2023)
18A
West
Kokapet
Not confirmed
North-west
Patancheru (Muttangi junction)
3
North
Dommarapochampalli
Not confirmed
North
Medchal (Kandlakoya junction, NH 44)
Not confirmed
North
Shamirpet (SH 1)
7
East
Keesara; Ghatkesar (Annojiguda junction)
Not confirmed
East
Taramatipet
10
East
Pedda Amberpet
11
South-east
Bongloor
Not confirmed
South-east
Tukkuguda
14
South
Pedda Golconda
15
South
Shamshabad (airport)
16
South-west
TSPA junction (Rajendranagar)
18
For a plot, the useful question is not the distance to the ORR but the distance to the nearest interchange, because the carriageway has no direct access in between. Use the ORR alignment on the 1acre map layer to measure both, and check whether the plot also falls in the 1 km Growth Corridor.
Several rules that decide whether ORR land can be built on have changed or are pending. The latest verifiable position on each is below. GO 111, which since 1996 has restricted development in 84 villages in the catchment of Osman Sagar and Himayat Sagar, is still in force. The previous government's Cabinet decided on 18 May 2023 to repeal it, but the decision was challenged in the High Court and never implemented, and the state told the court in September 2023 that GO 111 would stay until an expert committee reported. In August 2026, reports said the high-power committee's recommendations were ready to go before the Cabinet. They include starting with regulated development in about eight villages inside the ORR and raising permitted built-up area from 10% to 40%. No Cabinet decision had been reported in the sources found. A separate PIL on new construction in the buffer zone is before the Telangana High Court.
Item
Status
Latest update
GO 111 (twin reservoir catchment)
In force; repeal proposal awaiting Cabinet
August 2026
LRS (layouts applied for in 2020)
25% fee rebate extended to 30 November 2026
August 2026
ORR tolling and operation
IRB Golconda Expressway, 30-year concession from HMDA
Tolling from 12 August 2023
Regional Ring Road
HMDA primary notification of the 100 m alignment, 163 villages in 8 districts
August 2025
Item
Status
Latest update
GO 111 (twin reservoir catchment)
In force; repeal proposal awaiting Cabinet
August 2026
LRS (layouts applied for in 2020)
25% fee rebate extended to 30 November 2026
August 2026
ORR tolling and operation
IRB Golconda Expressway, 30-year concession from HMDA
Tolling from 12 August 2023
Regional Ring Road
HMDA primary notification of the 100 m alignment, 163 villages in 8 districts
August 2025
An LRS rebate is a payment window, not an approval. A plot in a Gram Panchayat layout is regularised only when the proceedings are issued.
Most plots sold along the ORR fall into one of two camps: HMDA-approved layouts with a Layout Permission (LP) number, and Gram Panchayat (GP) layouts approved only by the village panchayat. They look identical in a brochure. They are not the same asset. A GP layout without HMDA sanction is not eligible for a bank loan, cannot guarantee released (mortgage-free) plots, and depends on the Layout Regularisation Scheme (LRS) to become legitimate, a process that is still pending for a large backlog of applications. As of August 2026, the state had extended the 25% LRS fee rebate for 2020 applicants to 30 November 2026, but paying the fee does not by itself regularise a plot. The other recurring failure is the land record itself. Telangana's land records portal Bhu Bharati (formerly Dharani) shows ownership and extent, but an entry there does not confirm zoning, layout approval, or that the plot sits outside a lake buffer. Government assigned lands, allotted to the landless poor, cannot be legally sold, and several pockets near the ORR carry assigned-land litigation. The table below shows the document chain that separates a legally transactable plot from one that fails at financing or registration.
Document
What It Confirms
What It Does Not Confirm
HMDA Layout Permission (LP) number
Layout sanctioned by HMDA; mortgage plots released to buyers
That a specific plot is free of litigation or assigned-land status
Bhu Bharati (Dharani) passbook
Ownership and extent in the state land record
Zoning, layout sanction, or buildability
NALA conversion order
Agricultural land converted to non-agricultural use
HMDA layout sanction or building permission
LRS proceedings (for a GP plot)
An application to regularise an unapproved layout
A completed, guaranteed regularisation
FTL and buffer certificate (lakes)
Plot lies outside the Full Tank Level and buffer zone
Plot-level title; confirm the survey number, not just the layout
Document
What It Confirms
What It Does Not Confirm
HMDA Layout Permission (LP) number
Layout sanctioned by HMDA; mortgage plots released to buyers
That a specific plot is free of litigation or assigned-land status
Bhu Bharati (Dharani) passbook
Ownership and extent in the state land record
Zoning, layout sanction, or buildability
NALA conversion order
Agricultural land converted to non-agricultural use
HMDA layout sanction or building permission
LRS proceedings (for a GP plot)
An application to regularise an unapproved layout
A completed, guaranteed regularisation
FTL and buffer certificate (lakes)
Plot lies outside the Full Tank Level and buffer zone
Plot-level title; confirm the survey number, not just the layout
If a seller cannot produce the HMDA LP number and a clean Bhu Bharati record for your specific survey number, the price is irrelevant; you are buying a regularisation risk, not a plot.
The ORR is a ring, and each radial behaves differently depending on its employment anchor and its zoning. Inside the 1 km Growth Corridor, HMDA's Multi-Purpose Use Zone allows a mix of residential, commercial and institutional development; beyond it, the general master-plan zoning and Gram Panchayat layouts dominate. The table maps the major corridors to the infrastructure that actually drives demand and the specific risk that follows each.
Corridor (ORR exits)
Confirmed Anchor
Zone / Status
Primary Buyer Risk
West - Kokapet, Narsingi, Tellapur, Financial District
IT and financial hub; HMDA Neopolis land auctions
Largely HMDA-sanctioned; premium pricing
High entry cost; western fringe near the lake catchment, check GO restrictions
North-West - Patancheru, Bachupally, Nizampet
Established residential; Patancheru industrial belt
Mix of HMDA and older GP layouts
Industrial-pollution legacy near Patancheru; verify layout approval
North - Kompally, Medchal, Shamirpet
Genome Valley biotech cluster at Shamirpet
Fast-growing; many GP layouts
GP plots without HMDA LP; LRS dependence
East - Ghatkesar, Pocharam, Uppal
IT campuses including Infosys at Pocharam; Warangal highway
Mixed residential and industrial
Unapproved ventures marketed as IT-adjacent
South-East - Adibatla, Tukkuguda, Maheshwaram
Aerospace SEZ (TCS Adibatla), Hardware Park, Fab City
Industrial and SEZ with a residential fringe
Assigned-land and SEZ-acquisition pockets
South - Shamshabad, Shadnagar, Mucherla
RGIA airport; proposed Pharma City and Regional Ring Road
Long-horizon; partly notified for acquisition
Airport air-funnel zoning; long gestation
Corridor (ORR exits)
Confirmed Anchor
Zone / Status
Primary Buyer Risk
West - Kokapet, Narsingi, Tellapur, Financial District
IT and financial hub; HMDA Neopolis land auctions
Largely HMDA-sanctioned; premium pricing
High entry cost; western fringe near the lake catchment, check GO restrictions
North-West - Patancheru, Bachupally, Nizampet
Established residential; Patancheru industrial belt
Mix of HMDA and older GP layouts
Industrial-pollution legacy near Patancheru; verify layout approval
North - Kompally, Medchal, Shamirpet
Genome Valley biotech cluster at Shamirpet
Fast-growing; many GP layouts
GP plots without HMDA LP; LRS dependence
East - Ghatkesar, Pocharam, Uppal
IT campuses including Infosys at Pocharam; Warangal highway
Mixed residential and industrial
Unapproved ventures marketed as IT-adjacent
South-East - Adibatla, Tukkuguda, Maheshwaram
Aerospace SEZ (TCS Adibatla), Hardware Park, Fab City
Industrial and SEZ with a residential fringe
Assigned-land and SEZ-acquisition pockets
South - Shamshabad, Shadnagar, Mucherla
RGIA airport; proposed Pharma City and Regional Ring Road
Long-horizon; partly notified for acquisition
Airport air-funnel zoning; long gestation
The most misread fringe is the western catchment around Gandipet, Osman Sagar and Himayat Sagar, historically protected under GO 111. The government moved to repeal GO 111 in 2022, and a Cabinet decision of May 2023 to repeal it was never implemented after it was challenged in court. As of August 2026, a high-power committee's proposal to open regulated development in phases, starting with about eight villages inside the ORR, was awaiting a Cabinet decision. Do not buy GO 111 land about to open up on a broker's word; confirm the current notified status for the exact village before paying any advance.
This page is based on official HMDA material, the ORR concessionaire's stock exchange filing and established news reports, read in October 2026. Court and Cabinet developments on GO 111 are taken from news reports because the government has not published a new order. ORR exit numbers are given only where a published report confirms them; the rest are named by locality. Facts that could not be confirmed were left out.
* IRB Infrastructure filing to BSE (August 2023): Nehru Outer Ring Road, 158 km, 8 lanes, 30-year TOT concession, Rs 7,380 crore, tolling from 12 August 2023 * HMDA website: metropolitan region extended up to the Regional Ring Road; LRS help desk * Siasat (31 August 2025): HMDA primary notification of the Regional Ring Road alignment * Deccan Chronicle (2 July 2023): Narsingi as the 20th ORR interchange * Deccan Chronicle (11 November 2025): ORR exit numbers for Patancheru, Shamirpet, Taramatipet, Pedda Amberpet, Tukkuguda, Pedda Golconda, Shamshabad, TSPA and Narsingi * Wikipedia, Outer Ring Road, Hyderabad: opening stages, interchange names, connecting national highways * Deccan Chronicle (7 August 2026) and Hyderabad Mail (8 August 2026): GO 111 history, high-power committee proposals, Cabinet status * Siasat (12 December 2025) and Telangana Today (2 May 2025): High Court PIL on construction in the GO 111 buffer zone * Deccan Chronicle (1 August 2026): LRS rebate deadline extended to 30 November

Boundaries and numbers come from published state cadastral records. See all map layers.

View Hyderabad Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Hyderabad masterp...

View RRR alignment as a live map overlay – check land acquisition risk and plot proximity free on 1acre.in. Hyderabad Re...

Hyderabad metro map with all 3 lines and stations, plus Phase 2 and future corridors with October 2026 status. Then chec...

View Hyderabad Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Hyderabad masterp...

View RRR alignment as a live map overlay – check land acquisition risk and plot proximity free on 1acre.in. Hyderabad Re...

Hyderabad metro map with all 3 lines and stations, plus Phase 2 and future corridors with October 2026 status. Then chec...
Only in an HMDA-approved (LP-numbered) layout with a clean Bhu Bharati (Dharani) record and an FTL or buffer clearance for the specific survey number. Gram Panchayat plots without HMDA sanction are not bank-financeable and depend on LRS regularisation.
HMDA designates the 1 km belt on either side of the ORR as a Growth Corridor, zoned as a Multi-Purpose Use Zone in the master plan. That zone permits a mix of uses, residential, commercial, institutional and select others, rather than a single use, which is what makes corridor land attractive. But multi-purpose is not anything-goes: permitted activities, road-width requirements and setbacks are specified, so confirm the exact use your plot allows before assuming construction is sanctioned.
A GP layout is approved only by the village panchayat; an HMDA plot has a sanctioned Layout Permission (LP) number with released, mortgage-free plots. Banks finance HMDA layouts; most GP layouts require LRS regularisation before they are legally and financially safe.
LRS is the Layout Regularisation Scheme for unapproved layouts. An LRS application is not a completed regularisation; buying an LRS-pending plot means inheriting the risk that it is never approved. Treat LRS applied as a caution, not a clearance. As of August 2026, the 25% fee rebate for 2020 applicants runs to 30 November 2026; paying the fee does not complete the regularisation.
Yes. GO 111 protected the Osman Sagar and Himayat Sagar catchment. Its repeal was announced in 2022 and decided by the Cabinet in May 2023, but it was challenged in court and never implemented, so GO 111 still applies. As of August 2026, a committee's plan to open about eight villages inside the ORR first was awaiting a Cabinet decision. Verify the notified status for the exact village before transacting in Gandipet, Shankarpally or the western fringe.
Telangana's portal is now Bhu Bharati, the renamed Dharani system. Pull the passbook and survey-number record there, and cross-check ownership, extent, and that the land is not assigned or under prohibition.
The western IT and financial belt (Kokapet, Narsingi, Tellapur) has the deepest confirmed infrastructure but the highest prices. The south-east (Adibatla, Tukkuguda) is anchored by aerospace and hardware clusters. The north (Kompally, Shamirpet) rides Genome Valley. Each still requires HMDA-layout verification at the plot level.
Banks finance plots in HMDA-sanctioned layouts with a clear title and released status. Pure agricultural land, assigned land, and unregularised GP plots are generally not eligible.
Yes. Nehru Outer Ring Road is the official name of the Hyderabad Outer Ring Road, the 158 km, 8-lane ring road around the city. HMDA owns it through the Hyderabad Growth Corridor Limited, and since August 2023 IRB Golconda Expressway has collected its tolls under a 30-year concession. Signs, maps and searches use ORR, Nehru ORR and Hyderabad ORR for the same road.
The ORR is 158 km long. It started with 19 interchanges; Narsingi opened as the 20th in July 2023, and more access points have been added or proposed since. Exits are numbered around the ring, for example Exit 3 at Patancheru, Exit 7 at Shamirpet and Exit 16 at Shamshabad. Confirm the current count on the ORR signage, as new exits are still being built.
Patancheru is Exit 3, at the Muttangi junction in the north-west. Medchal is served by the Kandlakoya junction on NH 44 in the north. Patancheru has an industrial-pollution legacy and Medchal has many Gram Panchayat layouts, so for plots near either exit confirm the HMDA Layout Permission number and the Bhu Bharati record for the survey number.
The ORR is access-controlled, so you can join it only at an interchange. Find your area in the exit table on this page, then use a navigation app from your location to that interchange. For land, measure the distance from the plot to the nearest interchange, not to the road itself, because a plot beside the carriageway may be several kilometres from an entry.
Source
Official Hyderabad Metropolitan Development Authority (HMDA) documents
Official Website
www.hmda.gov.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
LineString / MultiLineString
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
2026
Status
Operational
Anything wrong, outdated, or missing we want to hear it.