logo
Map-View
Buy Land
Sell Land
For Developers
Premium
© 2026 - 1acre.in - All Rights Reserved
  • LinkedIn icon
  • Youtube icon
  • Instagram icon

© 2026 - 1acre.in - All Rights Reserved

LinkedIn iconYoutube iconInstagram icon
    Layers
    Kanpur Ring Road
    Prayagraj Ring Road
    Ayodhya Ring Road
    Gorakhpur - Siliguri Expressway
    Ghazipur - Ballia Expressway
    Kanpur - Kabrai Highway
    Ambala - Shamli Expressway
    Varanasi - Kolkata Expressway
    Lucknow - Kanpur Expressway
    Ganga Expressway
    Ayodhya Air Funnel Zones
    Lucknow Air Funnel Zones
    Ayodhya Masterplan
    Varanasi Masterplan
    Lucknow Masterplan
    Home
    Uttar Pradesh
    Agra - Gwalior Expressway

    Agra - Gwalior Expressway

    NHAI

    Other
    Agra - Gwalior Expressway map

    Overview

    The Agra Gwalior Expressway is an 88.4-km, six-lane greenfield corridor under Bharatmala Pariyojana Phase 2, connecting Deri village on Agra's Inner Ring Road to Susera village on the Gwalior Bypass. NHAI awarded the contract to GR Infraprojects Ltd on DBFOT mode in March 2025, valued at Rs 4,262.78 crore. Land has been acquired from 65 villages across UP, Rajasthan, and MP. The project targets completion within 910 days of the appointed date, pointing to 2028. This Premium layer on 1acre maps the DPR alignment so buyers can verify whether any specific survey number falls inside the notified 60-meter corridor.

    Section 3A Notices Are Live: What Agra Gwalior Expressway Land Buyers in Morena and Dholpur Must Check Before Purchasing

    The Agra Gwalior Expressway land corridor carries Section 3A notices under the National Highways Act, 1956, across all three states on its route, making this one of the few Bharatmala Phase 2 projects where acquisition is legally activated before physical construction begins. In Agra district alone, NHAI notified 117.83 hectares across 15 villages in Sadar, Kheragarh, and Fatehabad tehsils. Once a Section 3A notice attaches to a khasra number, the owner cannot legally transfer that land; any registered sale deed executed after notice service is voidable.

    Acquisition is confirmed complete across 65 villages: 14 in UP (Agra), 18 in Rajasthan (Dholpur), and 30 in MP (Morena). The 60-meter ROW is the base corridor width. Near bridge approaches and river crossings (eight major bridges, 23 minor bridges, six flyovers, five elevated viaducts), the effective construction footprint extends beyond that base.

    The table below shows the corridor by state, district, and km range formally under acquisition:

    Uttar Pradesh

    District

    Agra

    Km Range

    0 to 20.2

    Villages Acquired

    14

    Key Tehsils

    Sadar, Kheragarh, Fatehabad

    Rajasthan

    District

    Dholpur

    Km Range

    20.2 to 47.2

    Villages Acquired

    18

    Key Tehsils

    Rajakheda area

    Madhya Pradesh

    District

    Morena

    Km Range

    47.2 to 88.25

    Villages Acquired

    30

    Key Tehsils

    Rajakheda (Morena side)

    Madhya Pradesh

    District

    Gwalior

    Km Range

    88.25 to 88.4

    Villages Acquired

    Susera village (terminus)

    Key Tehsils

    Gwalior bypass

    State

    District

    Km Range

    Villages Acquired

    Key Tehsils

    Uttar Pradesh

    Agra

    0 to 20.2

    14

    Sadar, Kheragarh, Fatehabad

    Rajasthan

    Dholpur

    20.2 to 47.2

    18

    Rajakheda area

    Madhya Pradesh

    Morena

    47.2 to 88.25

    30

    Rajakheda (Morena side)

    Madhya Pradesh

    Gwalior

    88.25 to 88.4

    Susera village (terminus)

    Gwalior bypass

    The risk no competing page addresses directly: this project was originally tendered as three EPC packages in December 2023 and all three were cancelled in January 2024. It was relaunched on DBFOT mode; GR Infraprojects Ltd was declared preferred bidder on March 13, 2025, a 15-month restructuring gap. Alignment maps from the 2023 pre-bid period still circulate through broker networks in Morena and Dholpur. NHAI has not published the post-restructuring alignment publicly; the pre-feasibility was prepared by LEA Associates South Asia, and the full DPR is not downloadable from any official NHAI portal. Verify survey numbers against the current NHAI Section 3A notification, not any document dated before March 2025.

    Gwalior Bypass to Morena: Which Districts Along the Agra Gwalior Expressway Corridor Hold Real Land Value

    The Gwalior district accounts for just 150 meters of this 88.4-km alignment; Morena holds 41 km and Dholpur holds 27 km. Brokers near Susera village and Nirawali Tiraha are pricing plots at expressway-adjacent premiums before construction has started, and the four to five entry/exit loops planned every 20-25 km in Morena, Dholpur, and Agra define which sub-corridor parcels gain access value; that map looks different from what most broker pitches show.

    The table below shows the primary micro-markets along the route, with the realistic land signal and key risk at each:

    Deri village / Inner Ring Road

    District

    Agra

    State

    UP

    Land Signal

    Established market; limited new upside

    Key Risk

    14 villages already in Section 3A

    Rajakheda fringe

    District

    Dholpur

    State

    Rajasthan

    Land Signal

    Transit zone; thin land market

    Key Risk

    No urban demand anchor

    Morena city fringe / NH-552 junction

    District

    Morena

    State

    MP

    Land Signal

    Sharpest connectivity gain; two-corridor node

    Key Risk

    Construction not yet commenced

    Susera village / Nirawali Tiraha

    District

    Gwalior

    State

    MP

    Land Signal

    Bypass-adjacent; premium already applied

    Key Risk

    Overpriced for current project stage

    Corridor

    District

    State

    Land Signal

    Key Risk

    Deri village / Inner Ring Road

    Agra

    UP

    Established market; limited new upside

    14 villages already in Section 3A

    Rajakheda fringe

    Dholpur

    Rajasthan

    Transit zone; thin land market

    No urban demand anchor

    Morena city fringe / NH-552 junction

    Morena

    MP

    Sharpest connectivity gain; two-corridor node

    Construction not yet commenced

    Susera village / Nirawali Tiraha

    Gwalior

    MP

    Bypass-adjacent; premium already applied

    Overpriced for current project stage

    Morena closes the real connectivity gap. The district depends entirely on the old Gwalior-Morena-Dholpur-Agra road, which this expressway decongests directly. The NH-552 junction inside Morena is also the planned interchange with the proposed 408.77-km Chambal Expressway, creating a two-corridor node when both projects are operational. The contract further includes a cable-stayed bridge over the Chambal River, the only such structure on the alignment, concentrating engineering weight on this section. The DBFOT scope also requires strengthening of the existing NH-44 Agra-Gwalior section, which benefits Morena logistics before the greenfield lanes open. Design speed is 100 km/h, lower than India's newer 120 km/h corridors, so commercial uplift near interchanges will develop more gradually than on higher-speed routes. Physical construction had not commenced as of the March 2025 contract award; track NHAI's formal appointed date notification before treating the 2028 target as confirmed.

    Frequently Asked Questions

    Is it safe to buy Agra Gwalior Expressway land near the notified corridor?

    No. Section 3A notices are served across 65 villages in UP, Rajasthan, and MP. Verify the current NHAI notification for your khasra number. Any transfer of land inside the notified zone after Section 3A service is voidable under the National Highways Act, 1956.

    How long is the Agra-Gwalior Expressway and which districts does it pass through?

    The expressway is 88.4 km long. It passes through Agra district in UP (20.2 km), Dholpur in Rajasthan (27 km), and Morena and Gwalior in MP, with Morena holding the largest stretch at roughly 41 km of the alignment.

    What is the total cost of the Agra-Gwalior Expressway?

    The NHAI contract awarded in March 2025 is valued at Rs 4,262.78 crore on DBFOT mode. Earlier estimates of Rs 2,497 crore referred to the cancelled 2023 EPC packages and do not reflect the current contracted project scope.

    Who is building the Agra-Gwalior Expressway and under what model?

    GR Infraprojects Ltd was declared NHAI's preferred bidder on March 13, 2025. The project is on DBFOT mode under BOT (Toll) with a 20-year concession period, including a 910-day construction window from the appointed date.

    When will the Agra-Gwalior Expressway be completed?

    The contract specifies 910 days from the appointed date, targeting 2028. The appointed date is set after formal contract signing, not from the preferred bidder declaration. Track NHAI's commencement notification for the confirmed start point.

    Is the Agra-Gwalior Expressway part of Bharatmala Pariyojana?

    Yes. The expressway is under Bharatmala Pariyojana Phase 2, with the DPR prepared by LEA Associates South Asia Pvt. Ltd. NHAI under MoRTH is the executing authority. The full DPR is not publicly available on NHAI's portal.

    Which major highways will the Agra-Gwalior Expressway connect with?

    It connects to the Agra-Lucknow Expressway at the Agra terminus and has a planned interchange with the proposed 408.77-km Chambal Expressway inside Morena district. The contract also overlays and strengthens the existing NH-44 Agra-Gwalior section.

    Why were the original Agra-Gwalior Expressway tenders cancelled in 2024?

    NHAI invited three EPC packages in December 2023 and cancelled all three in January 2024, then restructured on DBFOT mode. This 15-month gap means any alignment map dated before March 2025 may not reflect the final contracted route.

    Disclaimer

    Alignment and corridor information shown here is indicative. Users should verify details with National Highways Authority of India (NHAI) and the relevant state authorities before any transaction or investment decision.

    Data Source & Verification

    Source

    Official National Highways Authority of India (NHAI) documents

    Official Website

    www.nhai.gov.in

    Coordinate Reference System

    EPSG:4326 (WGS 84)

    Geometry Type

    LineString / MultiLineString

    Data Format

    Vector (GeoJSON) + Raster Tiles

    Last Verified

    2026

    Status

    Active