Agra - Gwalior Expressway

NHAI

Expressway
Agra - Gwalior Expressway map

Overview

The Agra Gwalior Expressway is an 88.4-km, six-lane greenfield corridor under Bharatmala Pariyojana Phase 2, connecting Deori village on Agra's Inner Ring Road to Susera village on the Gwalior Bypass. National Highways Authority of India (NHAI) awarded the contract to GR Infraprojects Ltd on DBFOT (Design, Build, Finance, Operate, Transfer) mode in March 2025, with a Total Capital Cost of Rs 4,613 crore (including land acquisition costs) per the NHAI concession agreement signed 30 April 2025. Land has been acquired from 65 villages across UP, Rajasthan, and MP. The project targets completion within 910 days of the appointed date, pointing to 2028. This Premium layer on 1acre maps the DPR alignment so buyers can verify whether any specific survey number falls inside the notified 60-meter corridor.

The alignment passes through the National Chambal Wildlife Sanctuary in the Morena section, which adds construction complexity and land-sensitivity considerations near the sanctuary boundary.

Section 3A Notices Are Live: What Agra Gwalior Expressway Land Buyers in Morena and Dholpur Must Check Before Purchasing

The Agra Gwalior Expressway land corridor carries Section 3A notices under the National Highways Act, 1956, across all three states on its route, making this one of the few Bharatmala Phase 2 projects where acquisition is legally activated before physical construction begins. In Agra district alone, NHAI notified 117.83 hectares across 15 villages in Sadar, Kheragarh, and Fatehabad tehsils. Once a Section 3A notice attaches to a khasra number, the owner cannot legally transfer that land; any registered sale deed executed after notice service is voidable.

Acquisition is confirmed complete across 65 villages: 14 in UP (Agra), 18 in Rajasthan (Dholpur), and 30 in MP (Morena). The 60-meter ROW is the base corridor width. Near bridge approaches and river crossings (eight major bridges, 23 minor bridges, six flyovers, five elevated viaducts), the effective construction footprint extends beyond that base.

The table below shows the corridor by state, district, and km range formally under acquisition:

Uttar Pradesh

District

Agra

Km Range

0 to 20.2

Villages Acquired

14

Key Tehsils

Sadar, Kheragarh, Fatehabad

Rajasthan

District

Dholpur

Km Range

20.2 to 47.2

Villages Acquired

18

Key Tehsils

Rajakheda area

Madhya Pradesh

District

Morena

Km Range

47.2 to 88.25

Villages Acquired

30

Key Tehsils

Rajakheda (Morena side)

Madhya Pradesh

District

Gwalior

Km Range

88.25 to 88.4

Villages Acquired

Susera village (terminus)

Key Tehsils

Gwalior bypass

The risk no competing page addresses directly: this project was originally tendered as three EPC packages in December 2023 and all three were cancelled in January 2024. It was relaunched on DBFOT mode; GR Infraprojects Ltd was declared preferred bidder on March 13, 2025, a 15-month restructuring gap. Alignment maps from the 2023 pre-bid period still circulate through broker networks in Morena and Dholpur. NHAI has not published the post-restructuring alignment publicly; the pre-feasibility was prepared by LEA Associates South Asia, and the full DPR is not downloadable from any official NHAI portal. Verify survey numbers against the current NHAI Section 3A notification, not any document dated before March 2025.

Gwalior Bypass to Morena: Which Districts Along the Agra Gwalior Expressway Corridor Hold Real Land Value

The Gwalior district accounts for just 150 meters of this 88.4-km alignment; Morena holds 41 km and Dholpur holds 27 km. Brokers near Susera village and Nirawali Tiraha are pricing plots at expressway-adjacent premiums before construction has started, and the four to five entry/exit loops planned every 20-25 km in Morena, Dholpur, and Agra define which sub-corridor parcels gain access value; that map looks different from what most broker pitches show.

The table below shows the primary micro-markets along the route, with the realistic land signal and key risk at each:

Deori village / Inner Ring Road

District

Agra

State

UP

Land Signal

Established market; limited new upside

Key Risk

14 villages already in Section 3A

Rajakheda fringe

District

Dholpur

State

Rajasthan

Land Signal

Transit zone; thin land market

Key Risk

No urban demand anchor

Morena city fringe / NH-552 junction

District

Morena

State

MP

Land Signal

Sharpest connectivity gain; two-corridor node

Key Risk

Construction not yet commenced

Susera village / Nirawali Tiraha

District

Gwalior

State

MP

Land Signal

Bypass-adjacent; premium already applied

Key Risk

Overpriced for current project stage

Morena closes the real connectivity gap. The district depends entirely on the old Gwalior-Morena-Dholpur-Agra road, which this expressway decongests directly. The NH-552 junction inside Morena is also the planned interchange with the proposed 408.77-km Chambal Expressway, creating a two-corridor node when both projects are operational. The contract further includes a cable-stayed bridge over the Chambal River, the only such structure on the alignment, concentrating engineering weight on this section. The DBFOT scope also requires strengthening of the existing NH-44 Agra-Gwalior section, which benefits Morena logistics before the greenfield lanes open. Design speed is 100 km/h, lower than India's newer 120 km/h corridors, so commercial uplift near interchanges will develop more gradually than on higher-speed routes. Physical construction had not commenced as of the March 2025 contract award; track NHAI's formal appointed date notification before treating the 2028 target as confirmed.

Data Source & Verification

Source

Official National Highways Authority of India (NHAI) documents

Official Website

www.nhai.gov.in

Coordinate Reference System

EPSG:4326 (WGS 84)

Geometry Type

LineString / MultiLineString

Data Format

Vector (GeoJSON) + Raster Tiles

Last Verified

April 2026

Status

Active

Disclaimer: Alignment and corridor information shown here is indicative. Users should verify details with National Highways Authority of India (NHAI) and the relevant state authorities before any transaction or investment decision.

Frequently Asked Questions

Explore Uttar Pradesh on Map

Verified Lands for sale, Layers & Tools on one single map.

Go to Map

Was this layer helpful?

Anything wrong, outdated, or missing — we want to hear it.