Lucknow Kanpur Expressway Preview
Try the Lucknow - Kanpur Expressway on the map
Sign in once and explore the layer for a full day.

Lucknow Kanpur Expressway Preview
Try the Lucknow - Kanpur Expressway on the map
Sign in once with your mobile number and explore the layer for a full day.
The Lucknow Kanpur Expressway, officially designated National Expressway 6 (NE-6) and also called the Awadh Expressway, is a 63-kilometre, six-lane access-controlled road connecting Shaheed Path in Lucknow to Azad Chauraha near Kanpur's Ganga Bridge. It was inaugurated on 13 July 2026 and opened to public traffic on 14 July 2026. Notified in the Gazette of India in December 2020 and built by NHAI (National Highways Authority of India) at a project cost of approximately Rs 4,700 crore, the corridor cuts through 42 villages across Lucknow and Unnao districts. This page maps the expressway's alignment on 1acre's GIS layer, lists its entry and exit points, gives the latest opening, toll and repair status as of October 2026, explains how it differs from the old NH-27 highway, identifies the active growth pockets along the Lucknow Kanpur Expressway land corridor, and flags the on-ground risks buyers are encountering right now.
The Awadh Expressway route runs from Shaheed Path in Lucknow, near Amausi and the airport, through Banthara and Bani, across Unnao district, to Azad Chauraha near the Shuklaganj bypass and the Ganga bridge into Kanpur. NHAI built it in two packages: Package 1 (17.52 km) from Shaheed Path to the Sahib river bridge, which carries the elevated section through Amausi, and Package 2 (45.24 km), the greenfield stretch through Unnao. In the Kanpur to Lucknow direction you join at Azad Chauraha and leave at Shaheed Path; from Lucknow the direction is reversed. The road is access-controlled, so vehicles can join or leave it only at its entry and exit points. The opening details published in July 2026 list six:
Entry and exit point
District
Notes
Darogakheda
Lucknow
Lucknow district
Bani
Lucknow
Near the end of the elevated section
Haroni
Lucknow
Lucknow district
Ajgain
Unnao
Mid-corridor
Amarpass
Unnao
Earlier NHAI lists named a Lalganj point at Amrasas village
Azad Chowk (Azad Chauraha)
Kanpur
Kanpur end, near the Shuklaganj bypass and Ganga bridge
Entry and exit point
District
Notes
Darogakheda
Lucknow
Lucknow district
Bani
Lucknow
Near the end of the elevated section
Haroni
Lucknow
Lucknow district
Ajgain
Unnao
Mid-corridor
Amarpass
Unnao
Earlier NHAI lists named a Lalganj point at Amrasas village
Azad Chowk (Azad Chauraha)
Kanpur
Kanpur end, near the Shuklaganj bypass and Ganga bridge
Beyond the two ends, the expressway links with the Kanpur Outer Ring Road at the Kanpur end, the existing Kanpur-Lucknow highway (NH-27) and the Unnao-Lalganj highway. The project has 3 major bridges, 28 minor bridges, 38 underpasses and 6 flyovers. To check how far a plot sits from the alignment and the nearest access point, view the route on the 1acre map layer.
The Lucknow Kanpur Expressway was inaugurated on 13 July 2026 at Km 49 in Unnao by Defence Minister Rajnath Singh, Union Road Transport Minister Nitin Gadkari and Chief Minister Yogi Adityanath, and opened to public traffic at 8 am on 14 July 2026. It is six-lane, expandable to eight, with speed limits of 120 km/h for cars and 80 km/h for heavy vehicles. Two-wheelers and three-wheelers are not allowed. Tolling is barrier-free multi-lane free flow, using FASTag and number plate cameras, so there are no conventional toll plazas. Problems surfaced within weeks. On 26 July 2026 a stretch near Km 64 in the Korari area of Unnao slipped after rain. NHAI suspended toll collection from 5 August until repairs were complete, made the concessionaire pay for them, removed and debarred three supervising engineers, and set up an expert committee led by IIT Kharagpur. On the night of 13 September a slab section of the elevated road near Banthara (Km 14.4) failed on the Kanpur-to-Lucknow carriageway. The span was replaced and the lane reopened on 29 September 2026. As of that report, travel was still toll-free and no date had been announced for tolls to resume.
Item
Status
Latest update
Greenfield section (Package 2, Unnao)
Open; patch repairs and overlay after rain damage
Repairs from July 2026; overlay planned for late September 2026
Elevated section (Package 1, Lucknow)
Open; damaged span near Banthara replaced
Lane reopened 29 September 2026
Toll
Car toll revised to Rs 285 one way in July 2026; collection suspended
Suspended since 5 August 2026
Expert review
IIT Kharagpur committee report awaited
Awaited as of September 2026
Item
Status
Latest update
Greenfield section (Package 2, Unnao)
Open; patch repairs and overlay after rain damage
Repairs from July 2026; overlay planned for late September 2026
Elevated section (Package 1, Lucknow)
Open; damaged span near Banthara replaced
Lane reopened 29 September 2026
Toll
Car toll revised to Rs 285 one way in July 2026; collection suspended
Suspended since 5 August 2026
Expert review
IIT Kharagpur committee report awaited
Awaited as of September 2026
Searches for the Lucknow highway or the Kanpur Lucknow highway often mean NH-27, the older road between the two cities, not the new expressway. They are separate roads. The expressway is National Expressway 6, an access-controlled road notified by the Centre in December 2020, built for a 35 to 45 minute trip. NH-27 is the existing national highway, an 80 km trip that took about two to three hours at busy times, with its own toll plaza at Nawabganj.
—
Lucknow Kanpur Expressway (NE-6)
Kanpur Lucknow highway (NH-27)
Type
National expressway, access-controlled
National highway
Length between the cities
63 km
About 80 km
Typical travel time
35 to 45 minutes
Two to three hours at busy times
Car toll, one way
Rs 285 (collection suspended since 5 August 2026)
Rs 100 at Nawabganj (from July 2026)
Where vehicles can join
Only at entry and exit points
Along the road
Two- and three-wheelers
Not allowed
Not restricted by the expressway rules
—
Lucknow Kanpur Expressway (NE-6)
Kanpur Lucknow highway (NH-27)
Type
National expressway, access-controlled
National highway
Length between the cities
63 km
About 80 km
Typical travel time
35 to 45 minutes
Two to three hours at busy times
Car toll, one way
Rs 285 (collection suspended since 5 August 2026)
Rs 100 at Nawabganj (from July 2026)
Where vehicles can join
Only at entry and exit points
Along the road
Two- and three-wheelers
Not allowed
Not restricted by the expressway rules
For land buyers, the difference matters. A plot with frontage on NH-27 has direct road access. A plot beside the expressway may have none, because the nearest ramp can be several kilometres away. Before paying a premium for expressway proximity, confirm which road actually serves the plot and how far the nearest access point is.
The Unnao to Banthra stretch is complete, and the full road, including the 18-kilometre elevated section in Lucknow, opened to public traffic on 14 July 2026, a day after the 13 July inauguration. The risk has moved from the opening date to access and build quality. Rain damage near Km 64 in Unnao led NHAI to suspend tolls from 5 August 2026, and a damaged span of the elevated road near Banthara was replaced in September 2026. Brokers are pricing land near the Lucknow Kanpur Expressway land corridor as though every roadside plot gains from the road, but vehicles can join or leave it only at its entry and exit points. A plot beside the carriageway with no ramp nearby gains little direct access. Five categories of land near expressway Kanpur deserve immediate scrutiny before any transaction.
Risk Category
What to Check
Why It Matters
Acquired land resale
Verify the khasra is not listed in NHAI's 42-village acquisition schedule
Farmers compensated by NHAI have sold some parcels twice
ROW buffer plots
Confirm the plot boundary sits outside the 35-90 m Right of Way
Plots within ROW cannot be registered; buyers lose money
Access-road dependency
Ask for the approved layout plan from LDA (Lucknow Development Authority) or KDA
Plots without a sanctioned approach road have no legal entry point
Forest land overlap
Cross-check with forest clearance records
NE-6 required clearance for 34 hectares of forest land; adjacency matters
Defence Corridor adjacency
Check UPDIC (UP Defence Industrial Corridor) node notifications for Lucknow and Kanpur
Development restrictions apply near designated defence manufacturing zones
Risk Category
What to Check
Why It Matters
Acquired land resale
Verify the khasra is not listed in NHAI's 42-village acquisition schedule
Farmers compensated by NHAI have sold some parcels twice
ROW buffer plots
Confirm the plot boundary sits outside the 35-90 m Right of Way
Plots within ROW cannot be registered; buyers lose money
Access-road dependency
Ask for the approved layout plan from LDA (Lucknow Development Authority) or KDA
Plots without a sanctioned approach road have no legal entry point
Forest land overlap
Cross-check with forest clearance records
NE-6 required clearance for 34 hectares of forest land; adjacency matters
Defence Corridor adjacency
Check UPDIC (UP Defence Industrial Corridor) node notifications for Lucknow and Kanpur
Development restrictions apply near designated defence manufacturing zones
The Right of Way on this corridor ranges from 35 metres on the brownfield section to 90 metres on the greenfield stretch. Any plot within that buffer has no legal standing for development. If the broker cannot produce a title document showing the survey number is outside the NHAI acquisition boundary, do not sign anything. The project passes through villages in both Lucknow and Unnao districts where Rs 800 crore in compensation was distributed to farmers. Some of that compensated land has re-entered the informal market. Verify ownership chain back at least two transfers before proceeding.
The Awadh Expressway intersects with two other major infrastructure projects: the Ganga Expressway in Unnao district and the Kanpur Ring Road at Udyog Path. That tri-junction near Kanpur and Unnao is where the most credible long-term appreciation case exists. Banthra, Unnao, and Shuklaganj have seen land values roughly double since 2019 according to market reports, though that movement also reflects speculative pricing that arrived before the road opened. The Shaheed Path land Lucknow end of the expressway is a different market entirely: already urbanised, with residential and commercial land largely absorbed. Amausi recorded around 8% year-on-year residential land price growth and Banthara around 6%, per 99acres data. These are confirmed pockets with road visibility; the fringe agricultural land between them and the expressway edge is where buyers are overpaying.
Corridor
Zone Type
Key Driver
Watch-Out
Banthra to Unnao (Greenfield)
Peri-urban / Industrial
Ganga Expressway trijunction
Compensated land re-entering market
Shaheed Path belt, Lucknow
Urbanised
Existing commercial pull
Already priced; limited upside land
Nawabganj, Unnao
Affordable residential
Mid-corridor access, NH-27 proximity
No sanctioned layouts yet at many parcels
Shuklaganj, Kanpur end
Logistics / Industrial
Kanpur Ring Road connection
Access only at the Azad Chowk end point; confirm which ramp serves the plot
Amausi elevated section
Mixed-use
Airport proximity
Elevated ROW creates no-build shadow land on either side
Corridor
Zone Type
Key Driver
Watch-Out
Banthra to Unnao (Greenfield)
Peri-urban / Industrial
Ganga Expressway trijunction
Compensated land re-entering market
Shaheed Path belt, Lucknow
Urbanised
Existing commercial pull
Already priced; limited upside land
Nawabganj, Unnao
Affordable residential
Mid-corridor access, NH-27 proximity
No sanctioned layouts yet at many parcels
Shuklaganj, Kanpur end
Logistics / Industrial
Kanpur Ring Road connection
Access only at the Azad Chowk end point; confirm which ramp serves the plot
Amausi elevated section
Mixed-use
Airport proximity
Elevated ROW creates no-build shadow land on either side
The Shuklaganj land investment case is real but requires patience: the expressway ramp near the Shuklaganj bypass is built, but commercial demand follows industry, and the Defence Corridor Kanpur Lucknow land node will determine how fast that translates to prices. UPDIC's Kanpur and Lucknow nodes are part of the UP Defence Industrial Corridor, which is the single most material policy lever for industrial land demand in this region over the next decade. For buyers looking at agricultural land along the greenfield stretch, the entry and exit points, Darogakheda, Bani and Haroni in Lucknow, Ajgain and Amarpass in Unnao, and Azad Chowk at the Kanpur end, are the nodes that will see the first commercial demand. The road uses barrier-free tolling, so the five toll plazas once planned at Miranpur Pinwat, Khandedev, Bani, Lalganj in Unnao and the Shuklaganj bypass entry were not built as conventional plazas. Land within 2 km of a toll plaza or interchange on a comparable corridor (Yamuna Expressway, Purvanchal Expressway) has historically attracted petrol pumps, warehousing, and hospitality first.
This page combines the original corridor guide with the opening, toll and repair record reported since July 2026. Opening and inauguration details come from All India Radio News, the public broadcaster. NHAI's toll suspension, repair orders and action against the concessionaire are as reported by national outlets, because NHAI did not publish a location-wise notice. Where reports gave different figures (for example the project cost), the page keeps the figure already published here and flags it for checking. Facts that could not be confirmed were left out.
* All India Radio News (13 July 2026): inauguration date, location and leaders; 63 km, six lanes, 120 km/h design speed, car toll at opening * India TV (13 July 2026): public opening on 14 July, six entry and exit points and their districts, speed limits, vehicle rules, toll rates by class * ThePrint (12 August 2026): packages and lengths, Km 64 damage, toll suspension, July 2026 toll revision, NH-27 Nawabganj toll, structures, completion certificates * Business Today and Swarajya (5 and 6 August 2026): NHAI toll suspension and action against the concessionaire and engineers; IIT Kharagpur committee * Free Press Journal (July 2026): six-lane design expandable to eight, greenfield section completed October 2025, villages, barrier-free tolling, NE-6 designation * Amar Ujala (22 March, 14 July and 29 September 2026): NH-27 trip length, barrier-free tolling, Banthara span repair and lane reopening * Tarun Mitra (2 September 2026): toll to resume after overlay; IIT report awaited * ETV Bharat (13 July 2026): Kanpur Outer Ring Road connection * India TV (May 2026): link with the Kanpur-Lucknow highway and Unnao-Lalganj highway * The Daily Jagran (1 September 2025): earlier toll plaza list and Azad Chauraha start point
For Land Owners & Agents
I want to sell my land in Uttar Pradesh
10:32
Plz share your Land's location - We will list it on 1acre map, for Free.
10:32

250 Sq yds
2.5 Acres
For Land Buyers
Every listing goes through our Preliminary Verification Process.

View Lucknow Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Lucknow masterplan ...

Lucknow Outer Ring Road (Kisan Path, NH-230) route map, roads it crosses and villages covered, then the LDA zone and UP ...

View Lucknow Air Funnel Zones on a live map – check height clearance restrictions on any plot for free on 1acre.in. Luck...

View Lucknow Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Lucknow masterplan ...

Lucknow Outer Ring Road (Kisan Path, NH-230) route map, roads it crosses and villages covered, then the LDA zone and UP ...

View Lucknow Air Funnel Zones on a live map – check height clearance restrictions on any plot for free on 1acre.in. Luck...
The expressway passes through 11 villages in Lucknow district and 31 villages in Unnao district. Named villages include Banthra, Bani, Datauli Kantha, Taura, Neorna, Amarsas and Rawal. Buyers should verify any plot's khasra against this NHAI NE-6 land acquisition villages list before transacting.
Yes, with conditions. The Unnao to Banthra section is complete. Verify the plot is outside the 35-90 m Right of Way, confirm the survey number is not in NHAI's compensated land schedule, and check for a sanctioned approach road from LDA or KDA before signing. Use 1acre's Premium map layer (https://1acre.in/subscribe) to verify the plot sits outside the 35-90 m ROW and check it against NHAI's 42-village acquisition schedule before transacting.
It opened to public traffic on 14 July 2026, the day after Defence Minister Rajnath Singh, Union Road Transport Minister Nitin Gadkari and Chief Minister Yogi Adityanath inaugurated it at Km 49 in Unnao on 13 July. Repairs followed rain damage, and NHAI suspended tolls from 5 August 2026. A damaged span on the elevated road near Banthara was replaced and the lane reopened on 29 September 2026.
Kanpur and Lucknow are two of the six nodes of the UP Defence Industrial Corridor (UPDIC). Designated defence manufacturing zones may carry development restrictions in adjacent parcels. Check UPDIC node boundaries before buying industrial or commercial land within a 5 km radius of either city node.
Yes. The expressway creates a trijunction with the Ganga Expressway and the Kanpur-Noida Expressway in Unnao district. This node is one of the strongest long-term demand drivers for logistics and warehousing land in the corridor, particularly for expressway corridor plot buying in UP at scale.
None in the conventional sense. NE-6 uses barrier-free multi-lane free flow tolling, with FASTag and number plate cameras charging vehicles without stopping. Five toll plazas were once planned at Miranpur Pinwat, Khandedev, Bani (Lucknow), Lalganj in Unnao, and the Azad crossing near Shuklaganj Bypass in Kanpur. Vehicles now join and leave at six entry and exit points, and land near these points typically attracts early commercial demand, as seen on the Purvanchal and Yamuna Expressway corridors.
The approved project cost is approximately Rs 4,700 crore. NHAI distributed over Rs 800 crore in land acquisition compensation across 42 villages in Lucknow and Unnao districts. PNC Infratech is the contractor under the Hybrid Annuity Model (HAM).
Shaheed Path saw around 6% year-on-year growth, Amausi about 8%, and Banthara around 6%, based on 99acres data. In Banthra, Unnao, and Shuklaganj, land values are reported to have roughly doubled since 2019, though current prices embed speculative expectations of completion.
Yes. The expressway was inaugurated on 13 July 2026 and has been open to public traffic since 14 July 2026. Parts of the greenfield stretch in Unnao were repaired after rain damage, and a span of the elevated road near Banthara was replaced in September 2026, with the lane reopened on 29 September. As of that report, NHAI had suspended toll collection since 5 August 2026 and had not announced when tolls would resume.
The Awadh Expressway is the same road as the Lucknow Kanpur Expressway, NE-6. It runs 63 km from Shaheed Path in Lucknow, near Amausi and the airport, through Banthara and Bani, across Unnao district to Azad Chauraha near the Shuklaganj bypass at the Kanpur end. The first 17.5 km in Lucknow include the elevated section, and the remaining 45 km is a greenfield road through Unnao.
The opening details published in July 2026 list six: Darogakheda, Bani and Haroni in Lucknow district, Ajgain and Amarpass in Unnao district, and Azad Chowk (Azad Chauraha) in Kanpur. The road is access-controlled, so vehicles can join or leave only at these points. Check the distance from a plot to the nearest one before paying for expressway proximity.
At opening, a car paid Rs 275 one way and Rs 415 for a return within 24 hours; NHAI raised this to Rs 285 and Rs 425 on 22 July 2026. Light commercial vehicles paid Rs 445 one way and buses and trucks Rs 935. Tolls are charged through FASTag without toll plazas. NHAI suspended collection from 5 August 2026 until repairs are complete.
It is a national expressway, not a national highway. The Centre designated it National Expressway 6 (NE-6) in December 2020, and NHAI built and runs it; it is also called the Awadh Expressway. The older road between the two cities is NH-27, the Kanpur Lucknow highway, which stays open with its own toll plaza at Nawabganj.
Source
Official National Highways Authority of India (NHAI) documents
Official Website
www.nhai.gov.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
LineString / MultiLineString
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
May 2026
Status
Active
Anything wrong, outdated, or missing we want to hear it.