The Ayodhya Ring Road land corridor spans 67.57 kilometres, divided into two packages under NHAI (National Highways Authority of India)'s NHDP Phase-VII (National Highways Development Programme Phase 7) on Hybrid Annuity Mode: the 35.40 km Northern Ayodhya Bypass and the 32.172 km Southern Ayodhya Bypass. Budgeted at Rs 3,935 crore, the project connects NH-27, NH-330A, NH-330, and NH-135A across Ayodhya, Gonda, and Basti districts. Land acquisition covers 392 hectares at a cost of Rs 690 crore. NHAI fixed the appointed date for the Southern Ayodhya Bypass as 28 March 2025 and for the Northern Ayodhya Bypass as 9 July 2025, and each package runs on a construction period of about 2.5 years. Because both packages are greenfield, the ring road works as Ayodhya's outer ring road: it takes through traffic on the Lucknow-Gorakhpur highway (NH-27), the Gonda road (NH-330), the Raebareli road (NH-330A) and the Akbarpur road (NH-135A) around the city instead of through it.
The Ayodhya ring road map shows two greenfield packages that together form a ring around Ayodhya and the former Faizabad town. Both start near km 112.540 of NH-27, the Lucknow-Ayodhya-Gorakhpur highway, and between them they connect NH-27, NH-330, NH-330A and NH-135A. The table gives the alignment as NHAI published it in the bid documents.
Package
Length
Alignment as published
Bid project cost
Appointed date
Northern Ayodhya Bypass
35.40 km
Part 1: km 0 to 30.400, north of NH-27, from near km 112.540 to km 139.928 of NH-27. Part 2: km 0 to 5.000, south of NH-27
Rs 1,199.30 crore
9 July 2025
Southern Ayodhya Bypass
32.172 km
Km 5.000 to 37.172, from near km 112.540 to km 153.281 of NH-27
Rs 1,299.20 crore
28 March 2025
Package
Length
Alignment as published
Bid project cost
Appointed date
Northern Ayodhya Bypass
35.40 km
Part 1: km 0 to 30.400, north of NH-27, from near km 112.540 to km 139.928 of NH-27. Part 2: km 0 to 5.000, south of NH-27
Rs 1,199.30 crore
9 July 2025
Southern Ayodhya Bypass
32.172 km
Km 5.000 to 37.172, from near km 112.540 to km 153.281 of NH-27
Rs 1,299.20 crore
28 March 2025
When the state announced the project in February 2023, the route was described as starting at Maheshpur in Gonda district, passing Bishnupur and Magalsi in Ayodhya district and ending at Sitarampur in Basti district. It crosses 47 villages and needs 11 major bridges, 12 minor bridges, 22 underpasses and 4 railway overbridges.
The full village and khasra schedule is published in the NHAI land acquisition notifications under the National Highways Act, 1956, in the Gazette of India (egazette.gov.in). There is no official standalone Ayodhya ring road map PDF; the alignment drawings sit with those notifications and NHAI's project records. You can view the alignment against plot boundaries on the 1acre map layer.
As of October 2026, both packages are under construction by Ceigall India Ltd on Hybrid Annuity Mode under NHDP Phase VII. The latest verifiable progress figure is for the Southern Ayodhya Bypass: Ceigall reported to the stock exchanges that the package reached Project Milestone II at 35% physical progress on 7 May 2026, verified by the Independent Engineer on 12 May 2026 and 92 days ahead of schedule. The company's filings reviewed for this page do not give a progress figure for the Northern bypass.
Package
Appointed date
Construction period
Latest published progress
Completion by contract schedule
Southern Ayodhya Bypass (32.172 km)
28 March 2025
912 days
35% on 7 May 2026 (Milestone II)
Around September 2027
Northern Ayodhya Bypass (35.40 km)
9 July 2025
About 2.5 years
Not published
Around early 2028
Package
Appointed date
Construction period
Latest published progress
Completion by contract schedule
Southern Ayodhya Bypass (32.172 km)
28 March 2025
912 days
35% on 7 May 2026 (Milestone II)
Around September 2027
Northern Ayodhya Bypass (35.40 km)
9 July 2025
About 2.5 years
Not published
Around early 2028
Two points matter for buyers. First, construction progress does not settle land status: the 392-hectare acquisition and its compensation awards are separate records, so check the khasra against the acquisition schedule even where work has started nearby. Second, the Gonda bypass and the Gonda-Ayodhya six-lane link described below are separate projects at much earlier stages. A plot marketed as being on the ring road may in fact sit on one of those alignments, which are not yet under construction.
Most searches for a Gonda ring road refer to the Gonda bypass, a four-lane bypass with paved shoulders around Gonda city that the Ministry of Road Transport and Highways (MoRTH) is taking forward. It is a separate project from the Ayodhya ring road. The bypass has two parts, and each has been notified for land acquisition with the Special Land Acquisition Officer, Gonda, as the competent authority.
Part
Highway
Chainage
Tehsils
Villages notified
Notification
Western part
NH-330B
Km 0 to 19.650 and km 28.150 to 29.070
Gonda, Colonelganj
25
S.O. 4713(E), 17 October 2025
Eastern part
NH-330
Km 19.650 to 28.150
Gonda
15
S.O. 1683(E), 1 April 2026
Part
Highway
Chainage
Tehsils
Villages notified
Notification
Western part
NH-330B
Km 0 to 19.650 and km 28.150 to 29.070
Gonda, Colonelganj
25
S.O. 4713(E), 17 October 2025
Eastern part
NH-330
Km 19.650 to 28.150
Gonda
15
S.O. 1683(E), 1 April 2026
Villages in the western part include Indrapur, Pure Lalak, Sidhaw, Jhanjhari, Kathamafi, Haripur and Ummedjot in Gonda tehsil, and Chandpur and Dullapur Tarhar in Colonelganj tehsil. Villages in the eastern part include Turkoliya, Bhatwalia, Mahadev, Majhwa, Bahlolpur, Laxmanpur and Gangapur. The full lists are in the two gazette notifications.
On 16 June 2026 the MoRTH regional office in Lucknow invited Hybrid Annuity Mode bids for 20.570 km of the western part, with bids due on 31 July 2026. No contract award had been reported in the sources reviewed for this page as of October 2026. There is no official Gonda ring road map PDF; the gazette schedules are the authoritative record of which villages fall on the alignment.
The Gonda-Ayodhya six-lane project is a separate national highway proposal, reported in January 2026 as the Ayodhya-Gonda-Balrampur six-lane highway. It is about 65 km long. About 8 km of it lies within the Ayodhya ring road in the Nawabganj area, and the remaining stretch of about 57 km is a new six-lane alignment towards Gonda and Balrampur.
Item
As reported in January 2026
Start
Southern part of the old Gonda-Nawabganj road, joining the Ayodhya ring road near Nawabganj
Route
Links to a proposed Gonda city ring road, crosses the old Gonda-Nawabganj road, turns north and then west, and crosses the old Gonda-Balrampur road
Width
Six-lane carriageway of about 25 metres within a right of way of about 90 metres
Land
About 600 hectares, mostly agricultural fields
Status
Design complete; map sent to MoRTH for approval
Item
As reported in January 2026
Start
Southern part of the old Gonda-Nawabganj road, joining the Ayodhya ring road near Nawabganj
Route
Links to a proposed Gonda city ring road, crosses the old Gonda-Nawabganj road, turns north and then west, and crosses the old Gonda-Balrampur road
Width
Six-lane carriageway of about 25 metres within a right of way of about 90 metres
Land
About 600 hectares, mostly agricultural fields
Status
Design complete; map sent to MoRTH for approval
The proposal has changed before. A 2023 plan to four-lane the route was not approved because traffic was too low, and the plan was revised in January 2024 after the Ram Mandir consecration. A later link to the Gorakhpur-Shamli Expressway has also been proposed.
As of October 2026, no approval, land acquisition notification or tender for this six-lane road had been published in the sources reviewed for this page. Until a land acquisition notification names the villages, the alignment can still change, so do not pay a premium for a plot described as on the Gonda-Ayodhya six-lane road.
The Ram Mandir consecration triggered one of the fastest land price spikes any Indian city has seen in recent memory. Prime land near the temple corridor has reportedly seen 5x to 15x appreciation since 2020 by some market accounts. That velocity has also created the conditions for serious fraud, and the Ayodhya bypass corridor is the epicentre.
The most documented risk is ecologically sensitive land being sold as development plots. A Scroll.in investigation found that land in Majha Jamthara, the area between Faizabad, Ayodhya and the Saryu river, was identified by a National Green Tribunal committee as state government land. Despite this, it was transacted privately at highly inflated prices. Buyers who purchased in this zone did not hold valid title. The Saryu floodplain boundary is not marked on standard broker maps. If your plot sits near the river, the Majha Jamthara area or any zone that was previously a riverbed, get an NGT and state revenue department verification before proceeding.
The table below identifies the four categories of high-risk land on this corridor.
Risk Type
Location
Specific Issue
Verification Needed
NGT-flagged ecological land
Majha Jamthara, Faizabad-Saryu belt
Former riverbed; NGT found it state government land
Revenue department + NGT case records
NHAI acquisition overlap
392-hectare acquisition zone across Ayodhya, Gonda, Basti
Farmers re-transacting already compensated parcels
Check khasra against NHAI Package 1 and 2 acquisition schedule
ADA regulation gap
343 new villages added to ADA jurisdiction in 2025
Land in newly incorporated Basti/Gonda villages has no approved layouts yet
Confirm ADA's Phase 2 planning boundary and zone classification
Saryu bridge approach zones
Northern bypass near two Saryu bridge crossings
Bridge approach zones have development restrictions
Confirm ROW buffer on both sides of each bridge crossing
Risk Type
Location
Specific Issue
Verification Needed
NGT-flagged ecological land
Majha Jamthara, Faizabad-Saryu belt
Former riverbed; NGT found it state government land
Revenue department + NGT case records
NHAI acquisition overlap
392-hectare acquisition zone across Ayodhya, Gonda, Basti
Farmers re-transacting already compensated parcels
Check khasra against NHAI Package 1 and 2 acquisition schedule
ADA regulation gap
343 new villages added to ADA jurisdiction in 2025
Land in newly incorporated Basti/Gonda villages has no approved layouts yet
Confirm ADA's Phase 2 planning boundary and zone classification
Saryu bridge approach zones
Northern bypass near two Saryu bridge crossings
Bridge approach zones have development restrictions
Confirm ROW buffer on both sides of each bridge crossing
The ADA (Ayodhya Development Authority) expanded its planning area to 873 sq km in 2025, incorporating 343 villages from Basti and Gonda. Most of those villages have no sanctioned layouts under the Ayodhya Master Plan 2031. Brokers are selling agricultural parcels in these newly incorporated zones as "ADA area" plots. That description is accurate but meaningless for development until ADA notifies a layout. Buying agricultural land in a newly incorporated village on the expectation of residential conversion is a speculative bet, not a titled development site.
The bypass creates four distinct land markets and they are not equivalent. Understanding which one you are buying into is more important than the ring road proximity itself.
The NH-27 interchange zones at both ends of the ring road, near the Lucknow approach to the north and the Gorakhpur approach to the east, are where logistics and commercial demand will concentrate first. This is consistent with how every comparable bypass has played out: freight volumes (projected to reach 216,928 vehicles by 2033 versus 89,023 in 2023) drive warehousing demand before residential.
The Gonda Road and NH-330 corridor on the western and northern arc of the ring road is where hotel and hospitality land is most actively trading. Brands including Taj, Grand Hyatt, Radisson, and Park Plaza have been flagged for planned projects within 5 km of the Ram Temple. That commercial concentration makes the Gonda Road belt a genuinely demand-backed corridor, unlike speculative agricultural parcels further out.
The table below identifies the four land market types along the bypass.
Corridor
Highway Connection
Realistic Demand Driver
Hold Period
Key Risk
Northern bypass, NH-27 approach (Lucknow side)
NH-27
Logistics, freight village, warehousing
3-5 years
Verify outside 392-hectare NHAI acquisition zone
Gonda Road / NH-330 belt
NH-330
Hospitality, pilgrimage commercial
2-4 years
Confirm ADA-sanctioned layout, not raw agricultural
Bharatkund / NH-330A
NH-330A
Heritage tourism, residential
4-6 years
Flood zone verification near Saryu proximity
Basti / Gonda village belt (new ADA addition)
Various
Peripheral township development
7-10 years
No approved layout yet; ADA Phase 2 still planning
Corridor
Highway Connection
Realistic Demand Driver
Hold Period
Key Risk
Northern bypass, NH-27 approach (Lucknow side)
NH-27
Logistics, freight village, warehousing
3-5 years
Verify outside 392-hectare NHAI acquisition zone
Gonda Road / NH-330 belt
NH-330
Hospitality, pilgrimage commercial
2-4 years
Confirm ADA-sanctioned layout, not raw agricultural
Bharatkund / NH-330A
NH-330A
Heritage tourism, residential
4-6 years
Flood zone verification near Saryu proximity
Basti / Gonda village belt (new ADA addition)
Various
Peripheral township development
7-10 years
No approved layout yet; ADA Phase 2 still planning
Bharatkund on NH-330A is the most misread corridor on this bypass. Brokers cite its historical significance and proximity to the temple. The land use reality is that Bharatkund sits within the ADA's planning area but requires ADA-sanctioned conversion from agricultural to residential before any development is legally permissible. Proximity to the Ram Temple is not a substitute for a sanctioned layout plan. Confirm ADA zoning before any transaction in this belt.
For Land Owners & Agents
I want to sell my land in Uttar Pradesh
10:32
Plz share your Land's location - We will list it on 1acre map, for Free.
10:32

250 Sq yds
2.5 Acres
For Land Buyers
Every listing goes through our Preliminary Verification Process.

View Ayodhya Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Ayodhya masterplan ...

View Ayodhya Air Funnel Zones on a live map – check height clearance restrictions on any plot for free on 1acre.in. Ayod...

View Lucknow Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Lucknow masterplan ...

View Ayodhya Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Ayodhya masterplan ...

View Ayodhya Air Funnel Zones on a live map – check height clearance restrictions on any plot for free on 1acre.in. Ayod...

View Lucknow Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Lucknow masterplan ...
The Ayodhya Ring Road is a 67.57 km NHAI bypass divided into a 35.40 km Northern Package and a 32.172 km Southern Package. Together they form a ring around Ayodhya and Faizabad, connecting districts of Ayodhya, Basti, and Gonda through NH-27, NH-330, NH-330A, and NH-135A.
Work on the Southern Ayodhya Bypass started first: NHAI fixed its appointed date as 28 March 2025, with a construction period of 912 days, which points to completion around September 2027. For the Northern Ayodhya Bypass, NHAI confirmed the appointed date by letter on July 1, 2025, with construction commencing July 9, 2025. With a 2.5-year construction deadline under the HAM (Hybrid Annuity Mode) model, completion is targeted around early 2028, pending any land or clearance delays.
NHAI is acquiring 392 hectares at a total land acquisition cost of Rs 690 crore across Ayodhya, Gonda, and Basti districts. Buyers must check khasra numbers against the acquisition schedule for both Package 1 and Package 2 before transacting in any village along the alignment.
No, not without rigorous verification. A Scroll.in investigation documented that a National Green Tribunal committee identified Majha Jamthara land between Faizabad and the Saryu river as state government land. Private sale transactions in this area carry serious title validity risk; verify revenue and NGT records first. Use 1acre's Premium map layer (https://1acre.in/subscribe) to overlay the acquisition boundary and check your khasra number against the NHAI Package 1 and 2 schedule before any transaction.
The Ayodhya Development Authority expanded its planning area to 873 sq km in 2025, adding 343 villages from Basti and Gonda. Land in these newly added villages is now under ADA regulation, but most parcels have no sanctioned layout. Agricultural land sold as ADA area plots in these villages cannot be developed without formal zone conversion approval.
Ceigall India Ltd (CIL) was declared the lowest bidder for both the Northern and Southern Bypass packages by NHAI in September 2024. CIL has signed the contract agreement and officially commenced construction on both packages.
NHAI projects daily traffic through the bypass influence areas to grow from 89,023 vehicles in 2023 to 216,928 by 2033. That freight growth drives warehousing and logistics demand near NH-27 interchange zones before any residential demand, which should guide how buyers near the Gonda Basti NH-330A corridor time their hold period.
NHAI and MoRTH do not publish a single downloadable ring road map PDF. The official record is the set of land acquisition notifications in the Gazette of India (egazette.gov.in), which list each village and, at the later stage, khasra numbers. For the Gonda bypass, the October 2025 and April 2026 notifications list the villages. Brochure maps from sellers are not official, so compare any plot with the gazette schedule.
Faizabad district was renamed Ayodhya in November 2018, so older maps and searches still use the Faizabad name. The current NHAI project is officially the Northern and Southern Ayodhya Bypass, which together form the 67.57 km ring around Ayodhya and Faizabad. The NHAI records reviewed for this page do not use the name Faizabad bypass, so if a seller cites it, ask which road and chainage they mean.
As of October 2026, both packages are under construction by Ceigall India Ltd. The latest published figure is for the Southern Ayodhya Bypass, which reached 35% physical progress on 7 May 2026, 92 days ahead of its milestone date. No progress figure has been published for the Northern bypass. By contract schedule, the Southern package is due around September 2027 and the Northern package around early 2028.
MoRTH has notified 25 villages in Gonda and Colonelganj tehsils for the western part on NH-330B, including Indrapur, Pure Lalak, Sidhaw and Jhanjhari, and 15 villages in Gonda tehsil for the eastern part on NH-330, including Turkoliya, Mahadev, Majhwa and Gangapur. The full lists are in gazette notifications S.O. 4713(E) of 17 October 2025 and S.O. 1683(E) of 1 April 2026.
It is a proposed six-lane national highway from Ayodhya towards Gonda and Balrampur, about 65 km long, of which about 8 km lies within the Ayodhya ring road near Nawabganj. In January 2026 its design was complete and the map had been sent to MoRTH for approval. About 600 hectares would be acquired. No approval, acquisition notice or tender had been published as of October 2026.
Source
Official National Highways Authority of India (NHAI) documents
Official Website
www.nhai.gov.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
LineString / MultiLineString
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
May 2026
Status
Active
Anything wrong, outdated, or missing we want to hear it.