The Anand Nagar-Saket elevated road, also searched as the Anand Nagar Saket Bridge Thane elevated corridor, is MMRDA's 8.24 km, six-lane elevated road along the Eastern Express Highway, running from Anand Nagar at the Mulund-Thane border to Saket, terminating near Kharegaon Toll Naka. Anand Nagar-Saket Bridge is a live layer on 1acre. Approved at MMRDA's 156th Authority Meeting in March 2024 for Rs 2,188.62 crore, with J. Kumar Infraprojects Ltd. as contractor since October 2024, piling and utility diversion work is now underway. At Anand Nagar it meets the Eastern Freeway extension from Chheda Nagar, of which it is the northern continuation. This page sets out the route and latest status, clarifies which project is which around this node, and flags a live regulatory issue on a closely related MMRDA project that any buyer nearby should track.
The Anand Nagar to Saket elevated road runs north along the Eastern Express Highway (EEH) for 8.24 km, with three lanes in each direction. It starts at Anand Nagar on the Mulund-Thane border, near the landing point of the Chheda Nagar to Anand Nagar elevated Eastern Freeway extension, and ends at Saket in Thane West. It is meant to give signal-free movement over Thane's congested EEH junctions, both for local traffic and for through traffic from Mumbai and Nashik heading towards the Mumbai-Ahmedabad Highway.
Order
Point on the route
What is there
1
Anand Nagar (Mulund-Thane border)
Start; the Eastern Freeway extension from Chheda Nagar lands nearby
2
Teen Hath Naka
Elevated road passes over the junction; a separate MMRDA junction improvement was launched in July 2026
3
Nitin Junction
Elevated road passes over the junction
4
Cadbury Junction
Elevated road passes over the junction
5
Golden Dyes Junction, Majiwada
Three elevated structures at Majiwada Junction: Metro Line 4, the existing flyover and this road
6
Saket, Thane West, near Kharegaon Toll Naka
End of the elevated road
Order
Point on the route
What is there
1
Anand Nagar (Mulund-Thane border)
Start; the Eastern Freeway extension from Chheda Nagar lands nearby
2
Teen Hath Naka
Elevated road passes over the junction; a separate MMRDA junction improvement was launched in July 2026
3
Nitin Junction
Elevated road passes over the junction
4
Cadbury Junction
Elevated road passes over the junction
5
Golden Dyes Junction, Majiwada
Three elevated structures at Majiwada Junction: Metro Line 4, the existing flyover and this road
6
Saket, Thane West, near Kharegaon Toll Naka
End of the elevated road
Exact ramp locations have not been published in a form that could be verified. MMRDA holds the official alignment drawings. Before relying on a broker's description of a property as "on the elevated road", view the corridor over the EEH on the 1acre map layer and check how the plot is reached from the service road below.
The single biggest point of confusion here is that "Anand Nagar" refers to the Eastern Express Highway junction at the Mulund-Thane border, not the separate Anand Nagar located on Ghodbunder Road in Thane. This elevated corridor is also distinct from the newly completed Saket Creek Bridge on the Mumbai-Nashik Highway, a separate MSRDC project that opened in February 2026 to relieve the Majiwada-Vadpe bottleneck. Both projects sit in the same general area and share the "Saket" name, but they solve different traffic problems on different roads.
Project
Agency
Route
Status
Anand Nagar-Saket Elevated Corridor (this layer)
MMRDA
Eastern Express Highway, Anand Nagar to Kharegaon Toll Naka
Piles, pile caps and piers in progress; 17.60 per cent physical progress on MMRDA's project page (October 2026); Rs 2,188.62 crore
Eastern Freeway extension
MMRDA
Chheda Nagar (Ghatkopar) to Anand Nagar, elevated
Under construction; segment launcher erected in July 2026
Teen Hath Naka traffic improvement
MMRDA
Elevated links at Teen Hath Naka junction, Thane
Rs 200 crore project launched in July 2026
New Saket Creek Bridge
MSRDC
Mumbai-Nashik Highway, Majiwada-Vadpe
Opened February 2026
Thane Coastal Road Phase 2
MMRDA
Balkum/Kasheli to Anand Nagar (Mulund East)
CRZ clearance pending; deferred by MCZMA in August 2026
Project
Agency
Route
Status
Anand Nagar-Saket Elevated Corridor (this layer)
MMRDA
Eastern Express Highway, Anand Nagar to Kharegaon Toll Naka
Piles, pile caps and piers in progress; 17.60 per cent physical progress on MMRDA's project page (October 2026); Rs 2,188.62 crore
Eastern Freeway extension
MMRDA
Chheda Nagar (Ghatkopar) to Anand Nagar, elevated
Under construction; segment launcher erected in July 2026
Teen Hath Naka traffic improvement
MMRDA
Elevated links at Teen Hath Naka junction, Thane
Rs 200 crore project launched in July 2026
New Saket Creek Bridge
MSRDC
Mumbai-Nashik Highway, Majiwada-Vadpe
Opened February 2026
Thane Coastal Road Phase 2
MMRDA
Balkum/Kasheli to Anand Nagar (Mulund East)
CRZ clearance pending; deferred by MCZMA in August 2026
The Thane Coastal Road Phase 2, which shares the same Anand Nagar node as this elevated corridor, has run into a direct regulatory obstacle worth understanding even though it is technically a separate project. The Maharashtra Coastal Zone Management Authority deferred MMRDA's proposal in August 2026 after finding the alignment passes through the Eco-Sensitive Zone of the Thane Creek Flamingo Sanctuary, affecting roughly 3,754 mangrove trees and requiring both permanent and temporary removal of mangrove cover. MCZMA directed MMRDA to submit additional environmental studies and explore an alternative alignment before further approval. This matters for anyone evaluating land near the Anand Nagar node: MMRDA has multiple large infrastructure projects converging on this exact junction, and at least one of them is currently stalled on environmental grounds. Confirm which specific project a broker is referencing, and check whether any nearby parcel sits within the CRZ or mangrove Eco-Sensitive Zone before assuming construction rights.
The Anand Nagar-Saket elevated corridor itself, unlike its coastal-road neighbour, runs above the existing Eastern Express Highway through already-built-up Thane junctions like Teen Hath Naka, Nitin Junction, Cadbury Junction, and Majiwada, rather than through a fresh mangrove-sensitive alignment.
Location Along Corridor
Growth Driver
Known Risk
Anand Nagar (Mulund-Thane border)
Starting point of both this elevated corridor and the separately-planned coastal road
Confirm which project's timeline actually applies to a given plot
Teen Hath Naka to Majiwada
Six-lane elevated corridor decongesting a heavily used stretch
Existing built-up area; limited vacant land upside directly on this stretch
Kharegaon / Saket
Corridor terminus, connects to upgraded Thane-Nashik highway corridor
Benefits from both this project and the new Saket Creek Bridge nearby
Ghodbunder Road (separate Anand Nagar)
Established Thane residential/commercial corridor
Not the same location as this project's starting point; don't conflate the two
Location Along Corridor
Growth Driver
Known Risk
Anand Nagar (Mulund-Thane border)
Starting point of both this elevated corridor and the separately-planned coastal road
Confirm which project's timeline actually applies to a given plot
Teen Hath Naka to Majiwada
Six-lane elevated corridor decongesting a heavily used stretch
Existing built-up area; limited vacant land upside directly on this stretch
Kharegaon / Saket
Corridor terminus, connects to upgraded Thane-Nashik highway corridor
Benefits from both this project and the new Saket Creek Bridge nearby
Ghodbunder Road (separate Anand Nagar)
Established Thane residential/commercial corridor
Not the same location as this project's starting point; don't conflate the two
Since this elevated corridor runs above an existing highway through built-up urban Thane rather than through undeveloped coastal or mangrove land, it does not carry the same CRZ exposure as the nearby coastal road project. That is a meaningful distinction for land buyers: proximity to "Anand Nagar" alone does not tell you which regulatory regime applies. A parcel near the elevated corridor's alignment above the Eastern Express Highway is a different risk profile from a parcel near the coastal road's mangrove-adjacent alignment, even though both start from the same junction.
As of October 2026, MMRDA's project page shows physical progress of 17.60 per cent and financial progress of 16.92 per cent. In November 2025, progress had been reported at 5.25 per cent.
Item
Detail
Date of information
Approved project cost
Rs 2,188.62 crore, MMRDA's 156th Authority Meeting
March 2024
Contractor
J. Kumar Infraprojects Ltd., contract value Rs 1,847.72 crore
Appointed 11 October 2024
Construction period
48 months
October 2024 contract
Work done
Surveys and geotechnical studies complete; piles, pile caps and piers under way
November 2025
Physical progress
5.25 per cent (reported); 17.60 per cent, with financial progress of 16.92 per cent, on MMRDA's project page
November 2025; October 2026
Target completion
2028
November 2025
Eastern Freeway extension (Chheda Nagar to Anand Nagar)
13.9 km elevated road; segment launcher erected, 1,632 precast segments to be placed; 17.63 per cent physical progress on MMRDA's project page
July 2026; October 2026
Item
Detail
Date of information
Approved project cost
Rs 2,188.62 crore, MMRDA's 156th Authority Meeting
March 2024
Contractor
J. Kumar Infraprojects Ltd., contract value Rs 1,847.72 crore
Appointed 11 October 2024
Construction period
48 months
October 2024 contract
Work done
Surveys and geotechnical studies complete; piles, pile caps and piers under way
November 2025
Physical progress
5.25 per cent (reported); 17.60 per cent, with financial progress of 16.92 per cent, on MMRDA's project page
November 2025; October 2026
Target completion
2028
November 2025
Eastern Freeway extension (Chheda Nagar to Anand Nagar)
13.9 km elevated road; segment launcher erected, 1,632 precast segments to be placed; 17.63 per cent physical progress on MMRDA's project page
July 2026; October 2026
Two things follow for buyers. First, a 2028 target with less than a fifth of the work done by October 2026 leaves little room for delay, so treat "ready next year" pitches with caution. Second, the elevated road's value to Thane depends partly on the Eastern Freeway extension reaching Anand Nagar, since together they are meant to carry traffic from Mumbai into Thane without signals. Ask for the latest MMRDA progress update before paying a premium for either.

Boundaries and numbers come from published state cadastral records. See all map layers.

View Mumbai Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Mumbai masterplan 20...

View Nagpur Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Nagpur Metropolitan ...

View Pimpri Chinchwad Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Pimpri Chi...

View Mumbai Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Mumbai masterplan 20...

View Nagpur Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Nagpur Metropolitan ...

View Pimpri Chinchwad Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Pimpri Chi...
It is an 8.24 km, six-lane elevated road built by MMRDA along the Eastern Express Highway, running from Anand Nagar at the Mulund-Thane border to Saket, near Kharegaon Toll Naka.
No. This project's Anand Nagar is the Eastern Express Highway junction at the Mulund-Thane border, a completely different location from the Anand Nagar on Ghodbunder Road in Thane.
The Saket Creek Bridge is a separate MSRDC project on the Mumbai-Nashik Highway that opened in February 2026 to relieve the Majiwada-Vadpe bottleneck. This elevated corridor is an MMRDA project on the Eastern Express Highway.
The Maharashtra Coastal Zone Management Authority deferred the proposal in August 2026 because its alignment passes through the Eco-Sensitive Zone of the Thane Creek Flamingo Sanctuary, affecting thousands of mangrove trees.
Approximately 3,754 mangrove trees are affected under one MMRDA submission, with 1.7472 hectares of permanent mangrove removal and 2.7225 hectares of temporary removal proposed.
J. Kumar Infraprojects Ltd. is the contractor, appointed in October 2024, with an accepted contract amount of Rs 1,847.72 crore against MMRDA's approved project cost of Rs 2,188.62 crore.
Yes. Utility diversion works and execution of working piles, pile caps, piers and pier caps are in progress. MMRDA's project page showed 17.60 per cent physical progress in October 2026, up from 5.25 per cent reported in November 2025, with completion targeted for 2028.
Unlikely in the same way, since this corridor runs above the existing Eastern Express Highway through built-up urban Thane rather than through the mangrove-sensitive coastal alignment that triggered the Coastal Road Phase 2's regulatory hold.
The elevated road starts at Anand Nagar on the Mulund-Thane border and runs 8.24 km north along the Eastern Express Highway to Saket in Thane West. On the way it passes over Teen Hath Naka, Nitin Junction, Cadbury Junction and Golden Dyes Junction at Majiwada, where it sits alongside Metro Line 4 and the existing flyover.
Completion is targeted for 2028. The contract, awarded to J. Kumar Infraprojects in October 2024, runs for 48 months. MMRDA's project page showed 17.60 per cent physical progress in October 2026, so check MMRDA's latest update before relying on the date.
Yes. The Anand Nagar-Saket bridge on this map layer is the 8.24 km elevated road MMRDA is building over the Eastern Express Highway. It is not the Saket Creek Bridge on the Mumbai-Nashik Highway, which is a separate MSRDC project. Most people now search for it as the Anand Nagar Saket elevated road.
The Anand Nagar to Saket road is the northern continuation of the Eastern Freeway. MMRDA is building an elevated extension of the freeway from Chheda Nagar in Ghatkopar to Anand Nagar, 13.9 km long according to MMRDA and under construction. MMRDA says it will connect with the Anand Nagar to Saket road at Mulund Octroi Naka. Once both are complete, they are meant to carry traffic from Mumbai into Thane without signals.
Source
Official government land and infrastructure records
Official Website
mmrda.maharashtra.gov.in
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
LineString / MultiLineString
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
2026
Status
Active