Vikhroli Koparkhairane Link Road

Overview

Vikhroli Koparkhairane Link Road land acquisition covers MMRDA's proposed 7.5 to 10 km, six-lane bridge, also called the JVLR-Kopar Khairane-Ghansoli Bridge, connecting Vikhroli in Mumbai to Kopar Khairane in Navi Mumbai via a roughly 2 km span across Thane Creek. Vikhroli Koparkhairane Link Road is a live on 1acre. Approved in 2025 as the fourth bridge across Thane Creek after Vashi, Airoli, and Kalwa, the project is estimated to cost between Rs 550 crore and Rs 1,200 crore. This page covers the corridor's unusual land history, a decades-long Centre-State ownership dispute over the very ground it's built on, and where growth is concentrating nearby.

The Kanjurmarg Salt Pan Dispute: Decades of Unresolved Land Ownership

The most important thing to understand about this corridor is that it runs directly through Kanjurmarg, an area sitting at the centre of one of Mumbai's longest-running land ownership fights. Since the 1980s, the Central and Maharashtra state governments have disputed ownership of roughly 5,500 acres of salt pan land spanning the eastern suburbs, including Kanjurmarg, Bhandup, Nahur, and Mulund. This dispute became a live legal battle when the state allotted 102 acres of this same land to MMRDA for a separate Metro-3 car shed, prompting the Centre to challenge the transfer, and the Bombay High Court to stay construction while it heard the Centre's title claim.

The Kanjurmarg Salt Pan Dispute: Decades of Unresolved Land Ownership

**Land Feature**

**What It Means**

**Buyer Action**

Salt pan land ownership dispute

Centre and State have both claimed title since the 1980s

Confirm clear, undisputed title before any transaction near Kanjurmarg

Kanjurmarg landfill/dumping ground

Sits partly on land the Bombay High Court has declared "protected forest"

Verify whether a plot falls within the 119.91 hectares the court restored to forest status

CRZ classification

MMRDA's own 2010 study found 1,206 hectares of these salt pan lands fall under Coastal Regulation Zone

Only a fraction (204 hectares) was assessed as developable outside CRZ limits

Original bridge alignment change

MMRDA had to reroute away from the Kanjurmarg dumping ground because a garbage heap up to 35 metres tall made an elevated crossing infeasible there

Confirm the corridor's current, not original, alignment before assuming a specific plot benefits

The dumping ground itself has been separately litigated. An NGO's petition led the Bombay High Court to declare 119.91 hectares of the 141.77-hectare landfill a "protected forest," directly restricting what can be built there regardless of any transport project's own approvals. This is the same broader area the link road's original alignment had to route around, since an elevated structure could not be built over an active, rising garbage heap. Before transacting on any land near Kanjurmarg tied to this corridor's promised connectivity, verify title against both the Centre-State salt pan dispute and the forest-protection status separately, since either one can override a project's own environmental clearance.

What Growth Looks Like Near This Corridor

Once built, the link road would give Vikhroli and the surrounding eastern suburbs a direct route to Navi Mumbai and Pune-bound traffic, bypassing the currently used Vashi and Airoli-Mulund bridges.

What Growth Looks Like Near This Corridor

**Location**

**Growth Driver**

**Known Risk**

Vikhroli (JVLR terminus)

Direct new route to Navi Mumbai once bridge completes

Project has no fixed public completion timeline as of the latest reporting

Kannamwar Nagar, Vikhroli

Existing residential area adjacent to the Kanjurmarg landfill

Documented odour and pollution issues from the adjacent dumping ground

Kopar Khairane / Ghansoli

Bridge terminus, connects onward to Thane-Belapur Road

Benefits contingent on bridge completion; no confirmed construction start date

Thane Creek Flamingo Sanctuary zone

Ecologically sensitive area the alignment must clear environmentally

Requires Union Ministry of Environment, Forest and Climate Change clearance given creek-crossing alignment

Historical delays on this exact project are well documented: the link road was first proposed with an alignment through the Kanjurmarg dumping ground, stalled for over a year awaiting municipal approval, and had to be redesigned once officials determined the garbage heap's height made that route unworkable. Given the unresolved decades-old land ownership dispute in the same area, plus a separate court-enforced forest designation on part of the landfill, this is a corridor where the promised connectivity benefit and the underlying land's legal status are genuinely two different questions. Confirm both independently before treating proximity to the planned bridge as a straightforward value driver.

Was this layer helpful?

Anything wrong, outdated, or missing we want to hear it.

For Land Owners & Agents

Looking to sell your land in Maharashtra?

I want to sell my land in Maharashtra

10:32

Plz share your Land's location - We will list it on 1acre map, for Free.

10:32

For Land Buyers

Browse all verified lands & plots in Maharashtra

View on Map

Every listing goes through our Preliminary Verification Process.

Frequently Asked Questions

© 2026 - 1acre.in - All Rights Reserved

LinkedIn iconYoutube iconInstagram icon