A Thane-Borivali Tunnel land purchase depends on knowing where MMRDA's 11.84 km twin tunnel surfaces on each side and how its portal locations reshape land value nearby. The Rs 14,401 crore project cuts a 23 km Ghodbunder Road journey to 15 minutes by burrowing under Sanjay Gandhi National Park. Foundation stone was laid by PM Modi on 13 July 2024, and completion is targeted for May 2028. The Thane portal sits at Tikuji-Ni-Wadi in Manpada; the Borivali portal at Ekta Nagar in Magathane, near the Western Express Highway. This page maps the alignment, resettlement status and buyer checkpoints.
The Thane-Borivali Tunnel is not a surface expressway. It is a twin tube, three lanes each, running 23 metres below Sanjay Gandhi National Park for 10.25 of its 11.84 km. That structure changes how the project touches real estate. Adjacent land value shifts around the two portals, not along the underground stretch.
MMRDA has cleared more than 500 structures in Borivali for the tunnel boring machine launch shaft, and a structured resettlement plan covers 572 households in Magathane. On the Thane side, the portal has been realigned 200 to 225 metres toward the Satya Shankar boundary wall to avoid demolitions in Mullabaug and Sainath Nagar. Portal locations shifted once already, so alignment claims from before June 2025 need re-verification.
The table below shows what a Thane-Borivali Tunnel land buyer must verify before any advance payment.
Check
What to Confirm
Failure Signal
Portal Distance
Distance from the current (June 2025) Thane or Borivali portal
Seller quoting the pre-realignment portal location
MMRDA Land Notice
Whether the plot sits inside the MMRDA-notified acquisition zone
Private sale attempt on a notified survey number
CTS / Property Card
Current owner, area and encumbrances on the Property Register Card
Owner name different from sale deed or Aadhaar
SGNP ESZ Status
Whether the plot falls inside SGNP's Eco-Sensitive Zone
Construction plans on ESZ land without SEIAA clearance
Building Setback
BMC or TMC prescribed setback from the tunnel alignment
Existing structure inside the required setback
Check
What to Confirm
Failure Signal
Portal Distance
Distance from the current (June 2025) Thane or Borivali portal
Seller quoting the pre-realignment portal location
MMRDA Land Notice
Whether the plot sits inside the MMRDA-notified acquisition zone
Private sale attempt on a notified survey number
CTS / Property Card
Current owner, area and encumbrances on the Property Register Card
Owner name different from sale deed or Aadhaar
SGNP ESZ Status
Whether the plot falls inside SGNP's Eco-Sensitive Zone
Construction plans on ESZ land without SEIAA clearance
Building Setback
BMC or TMC prescribed setback from the tunnel alignment
Existing structure inside the required setback
The trap is not tunnel acquisition. That is mostly closed. The trap is portal ambiguity. On the Thane side, the June 2025 realignment moved the exit point roughly 225 metres. A plot that sat 500 metres from the old portal now sits about 275 metres from the new one, and pricing has not always caught up. On the Borivali side, Magathane parcels near Ekta Nagar are inside the tunnel's launch shaft footprint and have been through structure clearance. Ask for the current MMRDA acquisition schedule and the CTS-linked Property Register Card. Mumbai property vocabulary matters: CTS is the City Survey number, PRC is the Property Register Card, MHADA and BMC hold different mutation registers. Mumbai real estate is CTS-based, not survey-number based, and the CTS grid does not always match old sale deeds. If the CTS on the PRC does not tie back to the deed, the transaction is exposed. Every field must reconcile before a rupee moves.
Two micro-markets sit at the tunnel's mouths. Manpada, Tikuji-Ni-Wadi, Majiwada, Kolshet and Balkum anchor the Thane end. Magathane, Ekta Nagar, Borivali East and the Western Express Highway corridor anchor the Borivali end. Each side runs on different municipal rules (TMC for Thane, BMC for Borivali) and different rental yield curves.
Once the tunnel is live, projected daily traffic is 80,000 to 100,000 vehicles. That footfall lifts commercial land value near both portals but also raises noise and dust externalities within 500 metres. Rental yields on the Thane end are running 5 to 6 percent, and the tunnel-corridor pricing lift for property within 2 to 3 km of each portal is projected at 15 to 25 percent by the 2028 completion.
The table below shows the micro-markets around the tunnel and their present buyer risk profile.
Micro-Market / Corridor
What Drives Value
Buyer Risk
Tikuji-Ni-Wadi, Manpada (Thane)
Current tunnel portal, Ghodbunder proximity
Portal realignment ambiguity, dust externality
Majiwada, Kolshet, Balkum (Thane)
15-minute commute to Borivali, redevelopment wave
Speculative pricing beyond direct catchment
Ghodbunder Road corridor (Thane)
Congestion relief, TMC transport upgrades
Old alignment pricing on new realignment
Magathane, Ekta Nagar (Borivali)
WEH exit, launch shaft footprint
Resettlement history, CTS anomalies
Borivali East / WEH corridor (Mumbai)
Redevelopment of older buildings
Slow BMC clearance, MHADA overlaps
Micro-Market / Corridor
What Drives Value
Buyer Risk
Tikuji-Ni-Wadi, Manpada (Thane)
Current tunnel portal, Ghodbunder proximity
Portal realignment ambiguity, dust externality
Majiwada, Kolshet, Balkum (Thane)
15-minute commute to Borivali, redevelopment wave
Speculative pricing beyond direct catchment
Ghodbunder Road corridor (Thane)
Congestion relief, TMC transport upgrades
Old alignment pricing on new realignment
Magathane, Ekta Nagar (Borivali)
WEH exit, launch shaft footprint
Resettlement history, CTS anomalies
Borivali East / WEH corridor (Mumbai)
Redevelopment of older buildings
Slow BMC clearance, MHADA overlaps
The most misread market is Magathane. Around 500 structures have already been cleared for the tunnel boring machine launch shaft, and MMRDA's resettlement plan covers 572 households. Some parcels being marketed today carry a recent redevelopment or resettlement history that changes the encumbrance profile on the Property Card. Pull the CTS number, get a fresh PRC, and check for MHADA overlays. On the Thane side, Balkum and Manpada are the largest gainers, but pricing on some new projects already assumes the 2028 completion date. Verify the tunnel completion timeline against your investment horizon: MMRDA targets May 2028, and some independent analysts flag possible slippage into 2029 depending on monsoon and geological conditions. A Thane-Borivali Tunnel land purchase without a fresh portal distance check and a clean PRC is guesswork.

Boundaries and numbers come from published state cadastral records. See all map layers.

View Mumbai Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Mumbai masterplan 20...

View Nagpur Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Nagpur Metropolitan ...

View Pimpri Chinchwad Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Pimpri Chi...

View Mumbai Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Mumbai masterplan 20...

View Nagpur Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Nagpur Metropolitan ...

View Pimpri Chinchwad Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Pimpri Chi...
Measure the plot's distance to the current June 2025 realigned Thane or Borivali portal. Pull the CTS-linked Property Register Card. Check MMRDA's acquisition schedule before pricing a Thane-Borivali Tunnel land purchase.
The tunnel is 11.84 km long, with 10.25 km entirely underground. The total project cost is Rs 14,401 crore, funded by MMRDA, the Maharashtra state government and the central government. Completion is targeted for May 2028.
The Thane portal is at Tikuji-Ni-Wadi in Manpada near the Satya Shankar boundary wall, after a June 2025 realignment. The Borivali portal is at Ekta Nagar in Magathane, near the Western Express Highway and Borivali BEST depot.
Currently, the 23 km Thane-Borivali journey via Ghodbunder Road takes 60 to 90 minutes. Once the twin tunnel opens in May 2028, travel time drops to 15 to 20 minutes.
MMRDA owns the project. L&T and Megha Engineering & Infrastructures Ltd hold two civil packages. Four mega tunnel boring machines from Herrenknecht will excavate the twin tubes 23 metres below Sanjay Gandhi National Park.
MMRDA issued a structured resettlement plan on 15 June 2025 covering 572 affected households at Magathane. Around 500 structures had been cleared by February 2026 to make way for the tunnel boring machine launch shaft.
No surface damage is planned. The twin tubes run 23 metres below SGNP with cross-passages every 300 metres. The project requires 40.46 hectares of SGNP land and 16.54 hectares of private land at the portals.
MMRDA targets May 2028, with the foundation stone laid on 13 July 2024. Some independent analysts flag possible slippage into 2029 depending on monsoon and geological conditions, so check the timeline against your investment horizon: pricing on some new projects already assumes the 2028 date is certain.
Source
Official government land and infrastructure records
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
LineString / MultiLineString
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
2026
Status
Active
Anything wrong, outdated, or missing we want to hear it.