
Solapur Road Preview
Try the Solapur Road on the map
Sign in once and explore the layer for a full day.

Solapur Road Preview
Try the Solapur Road on the map
Sign in once with your mobile number and explore the layer for a full day.
Pune Solapur Road land buying tracks NH-65, the corridor that runs east from Hadapsar through Manjri, Phursungi, Loni Kalbhor and Uruli Kanchan toward Yavat. Two zoning regimes apply along this stretch. The PMC Draft DP covers the nine extended-limit villages including Hadapsar, Mundhwa and Undri. Beyond the municipal limit, the PMRDA Draft Development Plan 2021-2041 governs 6,051.76 sq km across 814 villages of the Pune metropolitan region. This page maps the legal traps, the live metro reset, and the questions buyers should answer before any token cheque clears.
Two specific risks separate a clean Pune Solapur Road plot from one that will never receive a building sanction. The first is buying a gunthewari unauthorised plot Pune brokers still actively market. The second is paying agricultural rates for a parcel that has not received the Collector's non-agricultural order.
The gunthewari category itself is the corridor's most misunderstood term. Gunthewari refers to small sub-divided plots, typically below standard layout norms, that came up on agricultural or revenue land without sanctioned layout approval. Maharashtra has run multiple regularisation drives, but a plot's eligibility for regularisation is not the same as a clear title. Until a layout receives PMC or PMRDA sanction and the parcel converts under Section 44 of the Maharashtra Land Revenue Code, a gunthewari sale remains exposed to demolition risk and bank loan rejection.
The table below shows the corridor's plot categories and what each actually means.
Plot Category
What It Means
Buildable Without Friction?
Common Trap
NA-converted, sanctioned layout
Collector NA order issued, layout approved
Yes, with building plan approval
Verify NA number against 7/12 utara
Agricultural plot (kheti in 7/12)
Revenue land, no NA conversion
No
Sold at "future NA" rate without paperwork
Gunthewari plot
Sub-divided, often unauthorised layout
Restricted, bank loans difficult
Marketed as "regularisation-eligible"
TP scheme final plot
Allotted post-deduction under MRTP Act
Yes, once scheme is sanctioned
Confuse final plot with original plot
Plot Category
What It Means
Buildable Without Friction?
Common Trap
NA-converted, sanctioned layout
Collector NA order issued, layout approved
Yes, with building plan approval
Verify NA number against 7/12 utara
Agricultural plot (kheti in 7/12)
Revenue land, no NA conversion
No
Sold at "future NA" rate without paperwork
Gunthewari plot
Sub-divided, often unauthorised layout
Restricted, bank loans difficult
Marketed as "regularisation-eligible"
TP scheme final plot
Allotted post-deduction under MRTP Act
Yes, once scheme is sanctioned
Confuse final plot with original plot
The 7/12 utara NA permission Maharashtra trail is non-negotiable. Pull the latest extract from the Mahabhulekh portal, match the village survey number against the operative Development Plan, and confirm the NA order signed by the Tahsildar or Sub-Divisional Officer. The mutation entry should reflect the conversion. Any sale pitched on the strength of a society resolution, a power of attorney, or a "future regularisation" promise is not a transaction. It is an unresolved risk. If the seller cannot place the NA order, the mutation entry, and the sanctioned layout sheet on the table together, walk away. The same caution applies inside Fursungi, Manjri Budruk, Phursungi and the village pockets between Hadapsar and Uruli Kanchan, where revenue-side gunthewari layouts have repeatedly drawn enforcement action.
The Solapur Road corridor splits into three identifiable bands, each governed by a different planning layer. The inner band from Hadapsar to Manjri Phata sits inside the PMC limit, controlled by the Draft DP for the nine extended-limit villages. The mid stretch from Phursungi through Loni Kalbhor falls under PMRDA jurisdiction, where the Draft DP 2041 is the operative document. The outer Uruli Kanchan to Yavat belt remains the freshest investment band, with PMRDA TP schemes notified in phases.
The table below summarises the corridor's main investable bands.
Solapur Road Band
Key Villages and Hubs
Primary Driver
Risk
Inner PMC (Hadapsar to Manjri)
Hadapsar, Mundhwa, Manjri Budruk, Vaiduwadi
Hadapsar Industrial Estate, Magarpatta and Amanora office demand
Density caps under PMC Draft DP, gunthewari pockets
Mid PMRDA (Phursungi to Loni Kalbhor)
Phursungi, Sulabh Garden, Wak Vasti, Loni Kalbhor
Hadapsar Loni Kalbhor metro line approval November 2025
NA verification gaps, Section 44 conversion pending
Outer PMRDA (Uruli Kanchan to Yavat)
Uruli Kanchan, Kadam Wasti, Yavat
Proposed metro extension, Pune Ring Road TP scheme Phase 1 alignment
Revenue land overhang, sanctioned layout shortage
Solapur Road Band
Key Villages and Hubs
Primary Driver
Risk
Inner PMC (Hadapsar to Manjri)
Hadapsar, Mundhwa, Manjri Budruk, Vaiduwadi
Hadapsar Industrial Estate, Magarpatta and Amanora office demand
Density caps under PMC Draft DP, gunthewari pockets
Mid PMRDA (Phursungi to Loni Kalbhor)
Phursungi, Sulabh Garden, Wak Vasti, Loni Kalbhor
Hadapsar Loni Kalbhor metro line approval November 2025
NA verification gaps, Section 44 conversion pending
Outer PMRDA (Uruli Kanchan to Yavat)
Uruli Kanchan, Kadam Wasti, Yavat
Proposed metro extension, Pune Ring Road TP scheme Phase 1 alignment
Revenue land overhang, sanctioned layout shortage
The Hadapsar Loni Kalbhor metro line is the single biggest connectivity reset on this corridor. The Maharashtra Cabinet Infrastructure Committee approved two new Pune Metro Phase 2 spurs on 4 November 2025 at a combined cost of ₹5,704 crore. The Hadapsar to Loni Kalbhor stretch runs 11.35 km with 10 elevated stations: Hadapsar Phata, Hadapsar Bus Depot, Akashwani Hadapsar, Laxmi Colony, Stad Farm, Manjari Phata, Draksha Baug, Toll Naka, Wak Vasti and Loni Kalbhor. The Hadapsar Bus Depot to Saswad Road spur covers 5.57 km with four stations: Hadapsar Gliding Club, Fursungi IT Park, Sulabh Garden and Saswad Road Railway Station. Deputy Chief Minister Ajit Pawar has separately proposed a further extension from Loni Kalbhor to Uruli Kanchan along the Pune-Solapur highway, pending feasibility study.
Loni Kalbhor is the most misread address on the corridor. Brokers position every village layout in the surrounding belt at "Loni rate," leaning on the metro approval headline. The metro alignment, however, lands inside a clearly demarcated station influence zone. Plots beyond walking distance from the planned station alignment fall back into standard PMRDA Draft DP economics. Confirm the survey number against the metro DPR alignment sheet, check NA status, and verify the sanctioned layout before treating any "near metro" listing at face value.

Boundaries and numbers come from published state cadastral records. See all map layers.

The 45 km SH-205 loop around Solapur city. Chainage, zoning, frontage setbacks and the plot checks that actually matter.

View Mumbai Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Mumbai masterplan 20...

View Nagpur Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Nagpur Metropolitan ...

The 45 km SH-205 loop around Solapur city. Chainage, zoning, frontage setbacks and the plot checks that actually matter.

View Mumbai Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Mumbai masterplan 20...

View Nagpur Masterplan as a live map overlay – check any plot's land use zone for free on 1acre.in. Nagpur Metropolitan ...
Yes. The PMRDA Draft Development Plan 2021-2041 governs the 6,051.76 sq km Pune metropolitan region across 814 villages, including the Loni Kalbhor and Uruli Kanchan belt. Inside the PMC limit, the extended 11 villages DP applies for any Pune Solapur Road land buying decision.
The Pune Solapur Road corridor passes through Hadapsar, Mundhwa, Manjri Budruk, Phursungi, Sulabh Garden, Wak Vasti, Loni Kalbhor, Kadam Wasti, Uruli Kanchan and onwards to Yavat. PMC controls the inner stretch, while PMRDA jurisdiction begins beyond the municipal limit.
A gunthewari unauthorised plot Pune covers small sub-divided parcels created without sanctioned layout approval, often on revenue land. Regularisation drives exist under Maharashtra law, but eligibility is not the same as a clear title. Bank loans are restricted and demolition exposure remains.
The Hadapsar to Loni Kalbhor 11.35 km corridor and the Hadapsar Bus Depot to Saswad Road 5.57 km spur received Maharashtra Cabinet Infrastructure Committee approval on 4 November 2025 at a combined ₹5,704 crore. Union government final approval and DPR implementation timelines follow.
Yes. Land marked as kheti in the 7/12 utara needs the Collector's non-agricultural order under the Maharashtra Land Revenue Code before any residential or commercial construction is permitted. The 7/12 utara NA permission Maharashtra trail is non-negotiable for every Solapur Road land transaction.
Yes. The Pune Ring Road TP scheme PMRDA framework includes Package 1 covering a 29.8 km stretch from Solu to Soratwadi along the Pune-Solapur Road at an estimated ₹3,523 crore. Five PMRDA TP schemes are planned along the broader ring road alignment.
The Fursungi IT Park Saswad metro station forms part of the Hadapsar Bus Depot to Saswad Road 5.57 km spur cleared in November 2025. The line includes Hadapsar Gliding Club, Fursungi IT Park, Sulabh Garden and Saswad Road Railway Station, all built as elevated stations.
Source
Official Pune Metropolitan Region Development Authority (PMRDA) documents
Coordinate Reference System
EPSG:4326 (WGS 84)
Geometry Type
LineString / MultiLineString
Data Format
Vector (GeoJSON) + Raster Tiles
Last Verified
2026
Status
Active
Anything wrong, outdated, or missing we want to hear it.